Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.

Slides:



Advertisements
Similar presentations
Lubrication – Getting it Right Nick Thomas North Sea & Caspian Sales Manager 11 February 2004 at 1500.
Advertisements

Five to Ten Year Vision for CBM by: John S. Mitchell for: ATP Fall Meeting -- Condition Based Maintenance Workshop November 17, 1998, Atlanta Georgia.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Culture and Leadership
Test Automation Success: Choosing the Right People & Process
Oil Analysis Implementation Strategy J. Mike Weiksner BSME - Auburn University Years in Industry (EMO) Hold Certifications in Vibration & Oil.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Executive Insight through Enhanced Enterprise Risk Management Leverage Value From Your Risk Management Investment.
A World of Solutions Duke Energy Strategic Energy Management Planning (SEMP).
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
A Maturity Model for Project Portfolio Management
ABB Reliability Fingerprint
Introduction to Project Management Avneet Mathur
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
The Analyst as a Project Manager
By Saurabh Sardesai October 2014.
Predictive Maintenance: Condition monitoring Tools and Systems for asset management September 19, 2007.
Building a Continuous Improvement Culture BackgroundBackground The Client is a global innovator, manufacturer and distributor of Applied Thermal equipment.
Charting a course PROCESS.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
What is Business Analysis Planning & Monitoring?
Introduction to Quality, Cost & Delivery
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
An Introduction to AlarmInsight
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Solution Overview for NIPDEC- CDAP July 15, 2005.
Project Management: Madness or Mayhem
MethodGXP The Solution for the Confusion.
S/W Project Management
Server Virtualization: Navy Network Operations Centers
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Change to Project Title
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Industrial Engineering Roles In Industry
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
How To Build a Testing Project 1 Onyx Gabriel Rodriguez.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Basic of Project and Project Management Presentation.
IT Requirements Management Balancing Needs and Expectations.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
SacProNet An Overview of Project Management Techniques.
Software process improvement Framework for SPI SPI support groups, maturity and immaturity models Assessment and gap analysis Education and training Selection.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Atlanta Area OAUG Meeting January 18, 2008 Using Oracle eAM to Support Asset Reliability.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Modern Maintenance. Management
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Introduction to SPA Trade Services PDA Work Flow Management Systems The Era of Change.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
TM 720: Statistical Process Control DMAIC Problem Solving
Systems Analysis and Design in a Changing World, 4th Edition
Presented by Jon Pastuszynski, Lead M&D Engineer
Identify the Risk of Not Doing BA
Overview of Asset Strategy and Maintenance Plan Development
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
TPM Definitions Goals and Benefits Components GEOP 4316.
Fertilizer Industry Safety Information Analysis and Sharing Program
Presentation transcript:

Glen Fields - Final Project Presentation

What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants Established in 2002 Specialize in Facility Assessment, Strategy Development, and Project Management

How Projects Get Started

Overview Project is to: –Perform an assessment at Disneyland –Optimize Maintenance and Reliability Program –Develop Customized Computer Reliability Software Program –Install Wireless Sensors to Monitor Equipment –Document Findings and Present to Management

Deliverables Deliverables of the Project are: –Assessment and Benchmark prior to Project Implementation –Equipment and Technology Matrix –Microsoft Project Schedule –Recommended Training Matrix –Identification and Documentation of Park Goals for the Condition Monitoring Program –Consultation of Work Flow Diagram for Optimized Implementation of Condition Monitoring Program

Maintenance Optimization Work Process World Class People Skills Technologies Management & Work Culture

Work process Identify Issues That Affect Maintenance Work Process Capture “As Is” Work Process Develop “To Be” Work Process Diagram

Work Processes: The CMMS system is used to plan and schedule the work, track machine history, and to track cost and savings information. Some of the key goals are prioritization of WO’s, elimination of unnecessary PM’s, and program justification. A key role of the IT group is the identification of the criticality of plant machinery so the work can be prioritized. Resources and technologies are assigned to plant assets based on equipment or systems importance to the production cycle. Performance of critical equipment is tracked and reported. Condition Monitoring plays a key role in acceptance and certification of plant equipment. Formal processes have been established to insure PDM is used on new and reworked equipment, incoming oils are inspected for quality, IR is used before shutdowns, and root cause studies are performed on all critical equipment failures. Feedback loops are in place on all WO’s and regular meetings are scheduled to discuss critical issues. Quality and Reliability are a way of life not a periodic process.

Work Process Designed for Maintenance Optimization Work Closeout Work Execution PdM Equip. Condition Directed Feedback PAM Root Cause Analysis Identifies Equip. Condition Maintenance Optimization What RM Equipment Failures Scheduled PM Tasks Feedback

Technology Identify Which Rides at Disneyland are Critical Based on the Criticality of the Ride, Assign Monitoring Technology Integrate Information Into an Equipment and Technology Matrix Install Monitoring Sensors on Equipment

Condition Based Maintenance Program Elements Maintenance Planning & Scheduling Maintenance Histories & Records Data Operator Log Data Design & Historical Data Engineering Maintenance Operations ALERTING TRENDING ANALYSES COST BENEFIT RECOMMENDATIONS REPORTING PDM Program Periodic Diagnostic Data Diagnostic & Process Data Batch Testing & Inspection Data

Technology Recommended Condition Monitoring Technologies –Wireless Vibration Monitoring Sensors –Wireless Lubrication Monitoring Sensors –Infrared Thermography

Equipment and Technology Matrix

Work Culture and Management Continued Focus on Benchmarking Facility Establish Vision Identify Goals Establish Global Metrics (SMART) –Specific –Measurable –Achievable –Reasonable –Timely Upper Management Visability

Work Culture and Management Plant managers know the importance of program, understand the financial impact, invest in the people and technology, and communicate regularly with the maintenance department. A formalized plan for plant reliability has been established and the impacted Team members. Performance measures are established, tracked, and reported on a regular basis. All members of the Team are asset owners and the emphasis is on elimination of critical equipment failures. Regular meetings are scheduled with all departments to communicate findings, plan strategies, look at WO optimization,and to optimize resource utilization.. Work Teams are established to break down reporting barriers and equipment ownership is assigned at the crafts level to empower the resources.

People / Skills Establishing and Understanding Roles and Responsibilities Developing and Maintaining Sponsorship Event Reporting Condition Assessment Reporting ROI Calculations Correlation of Technical Data Financial Aspects of Program

Program Costs

Schedule Detailed Project Schedule Developed Project Estimated at 6 Weeks