Proposal to Rhode Island Department of Transportation A Fresh Beginning The Blackstone River & Canal Navigation & Transportation System July 2009 Presented.

Slides:



Advertisements
Similar presentations
Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Winter Island Park Public Meeting #2 Salem, Massachusetts.
Advertisements

St. Croix River Crossing Project Public Information Meeting
Rhode Island Hospitality Green Certification For Rhode Island’s Hospitality & Tourism Industry.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Infrastructure In Nunavut What we have and What we need Nunavut Mining Symposium April 17,2012 Presented by Rhoda Katsak Director Community Operations.
Aaron VanderhillJim BarronJeff Van LaarTom Marshall.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Phase I Preliminary Plans Pedestrian Walkway Planning Subcommittee (PWP) Stow Planning Board Meeting October 19, 2010.
Proposed Athletic Facility Renovations to East Hartford High School Albert Costa-Director/Facilities 1 Expectations Matter Effort Matters Competence Matters.
Public Participation Advisory Committee February 25, 2015.
MTF Rail Development Forum
TRANSPORTATION POLICY COMMITTEE FINAL REPORT AND RECOMMENDATIONS PROFESSIONAL AND TECHNICAL STAFF COUNCIL ALUMNI CENTER APRIL 2, 2003.
"Airport Ground Transportation of the Future“ AGTA Fall Conference Steve Grubbs PHX Sky Harbor International Airport Deputy Director – Operations September.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
The Riesling Trail ® - a great tourism attraction.
Permit Request for Boat Ramp Facility and Conservation Area Impact Keene’s Pointe Community Association District 1 January 26, 2010 Environmental Protection.
ANRC AACD Arkansas Conservation Districts Training Program Power Point 12 Arkansas Natural Resources Commission.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
A Presentation by The Local Government Association of Tasmania Council Careers Jobs in Local Government.
CALTRANS WIRELESS LICENSING PROGRAM Bimla G. Rhinehart Division of Right of Way and Land Surveys.
Hydrographic Services Review Panel 2011 Hydrographic Services Review Panel 2011 CAPT Mark Ogle COMMANDER, SECTOR HAMPTON ROADS.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
MNR’s Role in Public Safety Around Dams –An Overview
GENERAL EXPENSE FY Proposed Budget Christine Moody, Budget & Financial Planning Manager.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Blackstone Hydropower Status Report 3 rd Annual River Users Conference Blackstone Valley Tourism Council Tricia Jedele, Conservation Law Foundation Bruce.
USPS - dedicated to making boating safer and more fun Wear a PFD and any other special equipment required Protect yourself from the elements Know the local.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Eurostat F - Break-Out Sessions SDMX RI User Group Luxembourg, September 2013.
Community Development Department Brookhaven at Town Center Technical Site Plan – Tier 3 Application #2481.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
California Emergency Management Agency State Emergency Plan Briefing Emergency Partnership Advisory Workgroup Meeting April 16, 2009.
Chapter 2 Introduction to Construction Procedures
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
ESTO Sustainable Tourism: Economically Feasible, Environmentally Viable Dr. Robert Billington Blackstone Valley Tourism Council Sustainable Tourism Planning.
CENE 386 Engineering Design: The Methods. Getting Ready to Get the Job Getting as much information as possible prior to making the proposal –Profile the.
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
River Rescue Update 2012 Captain Robert Shields Cumberland Rescue.
Geometric Design: General Concept CE331 Transportation Engineering.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Community Park UPDATE. History The idea of a park for Royal Oak/Rocky Ridge began in 2008 with a community wide questionnaire survey. The respondents.
Welcome to…. The Boat Ramp Information Open Day Thank you for coming along. We are here to answer your questions.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Community Development Department June 10, Mission Statement To ensure existing and future land use projects adhere to federal and state environmental.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
STATE OF ALASKA PERMITTING PROCESS
Civil Engineer Civil Engineering is a professional engineering discipline that deals with the design construction and maintenance of the physical and naturally.
The Seventh Framework Programme
Capital Metro Downtown Station Improvements
Capital Metro Downtown Station Improvements
Blackstone River User’s Conference September 22, 2010
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Green Energy and Green Spaces
2016 Florida Inland Navigation District Proposed Applications
Passenger Mobility Statistics 21 May 2015
TT – National Trade Corridors Fund – Airport Trail Phase 2
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Proposal to Rhode Island Department of Transportation A Fresh Beginning The Blackstone River & Canal Navigation & Transportation System July 2009 Presented by Blackstone Valley Tourism Council Blackstone Valley Visitor Center 175 Main Street – Pawtucket, RI Tourism Council Efforts to navigate the Blackstone River

PROJECT DETAILS Elements needed for the Blackstone River and Canal Navigation and Transportation System (BRCNTS) to be safe, effective and successful. PROJECT DESIGN AND DEVELOPMENT STEPS 1. Concept Design and Technical Feasibility - Plans at 10% 2. Community Approval 3. RIDOT Approval 4. Design Stage - Geo- technical - Plans at 30% 5.Topographical Survey 6.Community Approval 7.RIDOT Approval 8.RIDEM Permits 9.Plans, Specifications and Cost Estimates - Plans at 90% 10.Community Approval 11.RIDOT Approval 12.Final - Plans at 100% PROJECT DESIGN AND DEVELOPMENT STEPS 1. Concept Design and Technical Feasibility - Plans at 10% 2. Community Approval 3. RIDOT Approval 4. Design Stage - Geo- technical - Plans at 30% 5.Topographical Survey 6.Community Approval 7.RIDOT Approval 8.RIDEM Permits 9.Plans, Specifications and Cost Estimates - Plans at 90% 10.Community Approval 11.RIDOT Approval 12.Final - Plans at 100% 1) The BRCTNS has to serve three constituencies A. The E/V Blackstone Valley Explorer's passengers B. Search, Rescue and Recovery Vessels C. Canoeists, kayakers and small vessel operators 1) The BRCTNS has to serve three constituencies A. The E/V Blackstone Valley Explorer's passengers B. Search, Rescue and Recovery Vessels C. Canoeists, kayakers and small vessel operators 2) Each river section (between the dams) that can physically accommodate the E/V Explorer, or similar vessels, requires: A. An accessible landing system for the E/V Blackstone B. A 12' wide boat ramp that is deep enough into the river to accommodate the trailer that hauls the Explorer C. Access for canoeist, kayakers and small vessel operators D. A professional buoy and safety line system for each downstream dam 2) Each river section (between the dams) that can physically accommodate the E/V Explorer, or similar vessels, requires: A. An accessible landing system for the E/V Blackstone B. A 12' wide boat ramp that is deep enough into the river to accommodate the trailer that hauls the Explorer C. Access for canoeist, kayakers and small vessel operators D. A professional buoy and safety line system for each downstream dam 3) The three phases required for creating river access development for the BRCNTS: A. Program and Concept Feasibility securing answers for the following topics: Car and bus access and parking? Is there enough water in the river to operate? Is there public interest and benefit to navigate this section of the river? Are there feasible places to construct an Explorer launch and landing? Are the other river groups interested in accessing this section of the river? Is there an agreement for maintenance for the system? Is there insurance for the system? Is the concept technically feasible from an engineering and design standpoint? Is the project financially feasible from a cost- benefit perspective? B. Design (Landing, Ramp and Dam Safety System) and Project Permitting C. Construction and Use by Explorer, canoeist, kayakers and small vessel operators. 3) The three phases required for creating river access development for the BRCNTS: A. Program and Concept Feasibility securing answers for the following topics: Car and bus access and parking? Is there enough water in the river to operate? Is there public interest and benefit to navigate this section of the river? Are there feasible places to construct an Explorer launch and landing? Are the other river groups interested in accessing this section of the river? Is there an agreement for maintenance for the system? Is there insurance for the system? Is the concept technically feasible from an engineering and design standpoint? Is the project financially feasible from a cost- benefit perspective? B. Design (Landing, Ramp and Dam Safety System) and Project Permitting C. Construction and Use by Explorer, canoeist, kayakers and small vessel operators.

Conclusion Q&A Thank You!