MICHIGAN EXPERIENCE WITH WARRANTY WORK
Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned
Risk Transfer
Pavement Warranty Summary (1996 – 2002) 473 = Capital Preventive Maintenance (CPM) 131 = Rehabilitation & Reconstruction (R&R)
Warranty Contracts
2002 Warranties Over 90% of CPM Program Over 50% of R&R Program
Warranty Duration 2 or 3 Years (CPM) 5 Years (R&R)
2-Year CPM Warranty Chip seals Micro-Surfacing Crack Treatment Concrete Joint Resealing
3-Year CPM Warranty Non-Structural HMA Overlays Cold Mill and HMA Resurfacing Hot In-place HMA Recycling Concrete Pavement Repairs
5-Year Rehab Warranty Multiple Course HMA Overlays on - Rubblized Concrete Repaired HMA or Concrete Crush & Shape Base
5-Year New & Reconstruct Warranty HMA Pavements Concrete Pavements
Why Warranties ? Quality Control (QC) Transferred to Contractors Agency Staff Reduction National Initiative from Method Specifications to Performance Specifications
Contractor Responsibility for Materials and Workmanship Impacts Pavement Performance
Contractor Benefits Encourages Contractor Innovation Enhances Contractor Knowledge About the Product
Agency Benefits Increased Pavement Performance Reduced Pavement Life Cycle Cost
Project Life Cycle Cost
Pavement Remaining Life Categories Percent of Network Pavement (0-2)(3-7)(8-12)(13-17)(18-22)(23-27) 19% 10% 40% 8% 6% 17% Current Condition (Years)
Yearly Distribution Pavement Remaining Life Categories Percent of Network Pavement (3-7)(8-12)(13-17)(18-22)(23-27) (Years) (0-2)
Ideal Condition Pavement Remaining Life Categories Percent of Network Pavement (0-2)(3-7)(8-12)(13-17)(18-22)(23-27) (Years) 11% 17% 20% 18% 16%
Warranty Specifications
Quality Data Specification Development Project Monitoring
Spec Development Process Performance Measures Must Be Linked to Warranty Length Performance Thresholds Must Be Based on Actual Pavements Contractor is Involved as Partner
Warranty Spec Components Initial Acceptance Warranty Bond Rights and Responsibilities Performance Thresholds Corrective Action Conflict Resolution Process
Initial Acceptance Form Signed by Department and Contractor Acceptance Date of Construction Linked to “Open to Traffic” Linked to Pavement Acceptance Starts Warranty Period
Bond CPM 100% of the warranted work R&R 5% of the contract amount or fixed $ amount
Rights and Responsibilities of the Department Approve Materials, Methods and Schedule for Corrective Work Perform Routine Maintenance Involve Third Party for Emergency Repairs Notify Contractor when Pavement Condition Exceeds the Performance Thresholds
Rights and Responsibilities of the Contractor Provide Written Work Plan for Corrective Action Follow Agency Permit Process Complete All Corrective Work Before Warranty Expires
Performance Thresholds Condition Parameters Segment Length Contractor Caused Condition
General Condition Parameters (Asphalt) Transverse Cracking Longitudinal Cracking/Open Joint De-Bonding Raveling Flushing Rutting Ride Quality
Flushing
Rutting
Conflict Resolution Process Five Member Team Two Department Two Contractor One Mutually Selected Never Invoked To Date
Warranty Call Backs CPM < 5% Repair Work Cash Settlement R&R < 2% Repair Work
Experience After 5 Years Reduced Agency Inspection Costs Unknown “Actual” Overhead Cost No Effect on Bid Costs Unknown Gains in Remaining Service Life Improved Workmanship with some Contractors Premature Distress not Eliminated Transfer of Risk is in Process
Lessons Learned Proper Project Scoping is Key Documentation Becomes More Important Need for Tougher Pre-Qualification Standards for Contractors Agency Responsibility has Shifted Some Contractors won’t Bid Warranty Work Warranties are here to stay
THE NEXT STEPS
NATIONAL CENTER for PAVEMENT PRESERVATION
National Center for Pavement Preservation
Foundation for Pavement Preservation Foundation for Pavement Preservation National Center for Pavement Preservation Engineering Research Bldg 2857 West Jolly Road Okemos, MI Telephone (517)
The Objectives - Outreach Education Research Outreach Education Research - in Pavement Preservation
Research Facilitate Applied Research Projects. Oversee Pooled Fund Studies. Serve as a Partner in National Research Studies. Facilitate Applied Research Projects. Oversee Pooled Fund Studies. Serve as a Partner in National Research Studies.
Outreach Assist Highway Agencies with the Development of Specifications, Guidelines, and Project Selection. Integrate Pavement Preservation Activities with Pavement Management Systems. Provide Administrative Functions for the Midwestern Pavement Preservation Partnership. Assist Highway Agencies with the Development of Specifications, Guidelines, and Project Selection. Integrate Pavement Preservation Activities with Pavement Management Systems. Provide Administrative Functions for the Midwestern Pavement Preservation Partnership.
Outreach Serve as a Consultant for Pavement Cost-Effectiveness Studies. Promote and Promulgate Pavement Preservation Principles at Conferences, Trade Shows, etc. Maintain a Technical Resource Library. Serve as a Consultant for Pavement Cost-Effectiveness Studies. Promote and Promulgate Pavement Preservation Principles at Conferences, Trade Shows, etc. Maintain a Technical Resource Library.
Education Offer Continuing Education Units in Cooperation with MSU. Develop Courses in Cooperation with MSU. Meet Specific Client Training Needs with Custom-Design, On-Site Programs. Offer Continuing Education Units in Cooperation with MSU. Develop Courses in Cooperation with MSU. Meet Specific Client Training Needs with Custom-Design, On-Site Programs.
Education Develop and Offer Center- Sponsored Training at MSU Develop Technical Briefings Host Web-Related, Pavement Preservation Information Develop and Offer Center- Sponsored Training at MSU Develop Technical Briefings Host Web-Related, Pavement Preservation Information