FCRPS Adaptive Management Implementation Plan (AMIP) 1 September 15, 2009.

Slides:



Advertisements
Similar presentations
Monitoring Watershed Restoration Effectiveness Nez Perce Tribe DFRM-Watershed Division Rebecca A. Lloyd, Project Leader.
Advertisements

Fish and Wildlife Losses and Hydroelectric System Responsibility January 2004.
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
BiOP RPA 52.6 ISAB recommends a regional tagging & marking plan BioAnalysts, Inc.
1 The Collaborative, Systemwide Monitoring and Evaluation Project (CSMEP) and StreamNet NW Power & Conservation Council, Sept. 20, 2006.
Information Needs for the Integrated F&W Program (ESA and Power Act) Jim Geiselman - BPA.
1 Measuring Progress: Monitoring and Evaluation in WRIA 8 WRIA 8 Salmon Recovery Council November 19, 2009 Scott Stolnack WRIA 8 Technical Coordinator.
Strategic Hatchery Management Roadmap to Success Don Campton U.S. Fish and Wildlife Service Portland, OR.
Preliminary Results of Management Question Survey Jim Geiselman & Jen Bayer March 16, 2006 Pacific Northwest Aquatic Monitoring Partnership (PNAMP)
Future of our Salmon A summary of the origins and legal fundamentals of the role of artificial production in the Columbia River Presented by: John Ogan.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
Trends, Obstacles, and Opportunities Affecting Instream Flow Issues by Tom Annear, Wyoming Game & Fish Department Nina Burkardt, U. S. Geological Survey.
Sustaining Biological Diversity and Ecological Functions in the Face of Large-scale Change: Future Challenges in Natural Resource Management. Pat Leahy.
So Goes the Nation? Salmon Recovery in the Pacific Northwest Glenn Vanselow Pacific Northwest Waterways Association National Waterways Conference Portland,
1 Columbia River Salmon Opportunities for Success Presentation to the Pacific Northwest Waterways Association by the Columbia River Inter-Tribal Fish Commission.
NFIP ESA ComplianceImplementing a Reasonable and Prudent Alternative – FEMA Region 10 ESA and the National Flood Insurance Program Implementing a salmon.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
Decisions in the Face of Uncertainty Cedar River Sockeye Hatchery Proposed Adaptive Management Plan.
Implementation of the Biological Opinion for Russian River Water Supply, Flood Control Operations & Channel Maintenance National Marine Fisheries Service.
MAFMC 5-Year Strategic Plan Public Comments August 14, 2013.
Environmental Impact Assessment (EIA): Overview
Recent Events in Water Law and Policy in the United States Portion of the Columbia Basin The Federal Columbia River Power System: Pacific Salmon and the.
Proposed Approach for Developing Columbia Basin Salmon and Steelhead Goals June 3, 2015.
Puget Sound Initiative 2007 At A Glance Jay Manning, Director Washington Department of Ecology April 26,
8/29/2006 DRAFT Implementing an Adaptive Management Framework for the Fish and Wildlife Program DRAFT.
Overview of the Impact of Research and Monitoring in the Columbia River Basin Rob Clapp Gary Rule Blane Bellerud Ritchie Graves.
Pacific Fishery Management Council Jurisdiction –3 miles to 200 miles –4 states (includes Idaho) Members -- appointed –State governments –Federal Agencies.
Alternative Gear Implementation Project Pat Frazier WDFW Region 5 Fish Program Manager Photo by Wild Fish Conservancy.
Hydrosystem Operations and Fish Recovery in the Columbia River Basin U
2014 Program Goal Statements for Salmon and Steelhead Overview Nancy Leonard, Laura Robinson and Patty O’Toole (NPCC)
ISAB Snake River Spill-Transport Review ISAB – Presentation to Council September 17, 2008.
1 Habitat Action Effectiveness Program for the FCRPS BiOp.
BUILDING STRONG SM 1 Columbia River Salmon and Federal Columbia River Power System Rock Peters Senior Program Manager.
Following is a list of locations that project sponsors indicated their data would be published to for the BPA categorical review process.
John M. Volkman June 13, 2003 Either/Or? Is it Hydropower or Salmon in the Northwest?
Washington State Steelhead Status Review PACIFIC COAST STEELHEAD MEETING JON ANDERSON WASHINGTON DEPARTMENT OF FISH & WILDLIFE MARCH 9-11, 2010.
1 Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) June ??, 2007 DRAFT.
Steelhead Stock Status Review and ESA Oregon Rhine Messmer ODFW District Staff Oregon Department of Fish and Wildlife Pacific Coast Steelhead Management.
Columbia River Basin White Sturgeon Framework Lynn Palensky Northwest Power and Conservation Council Portland, Oregon USA July 2013.
Management Strategies for Columbia River Recreational and Commercial Fisheries and Beyond Oregon and Washington Staff Options for Initial Analysis.
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
2014/2024 Review Columbia River Treaty Bonneville Power Administration - U.S. Army Corps of Engineers Briefing for the Central Asian Delegation January.
Evaluating Fish Response to Habitat Restoration Overview of Intensively Monitored Watershed Research in the PNW Rationale for IMW approach Extent of current.
Climate Change Impacts in the Interior Columbia Basin.
Reclamation Climate Variabilaity Activities March 28, 2014 Tucson, AZ.
Status & Trend Monitoring Data End User Management Questions, Directives, Research & Monitoring Plans and Other Strategies 1.Federal Columbia River Estuary,
January 27, 2011 Examples of Recovery Evaluation Objectives in the Western U.S. Delta Stewardship Council Presentation by the Independent Consultant.
Findings of Congress The Endangered Species Act is the last resort for species at risk of extinction. Under the ESA, the National Marine Fisheries Service.
1 NOAA Priorities for an Ecosystem Approach to Management A Presentation to the NOAA Science Advisory Board John H. Dunnigan NOAA Ecosystem Goal Team Lead.
Energy Beyond Hydropower Atlas Chapter 13 Figure 13.1 – Energy Consumption No PNW sources of natural gas or crude oil Refining crude oil – 4 north Puget.
State Perspectives on Coastal and Ocean Management A Review of A Review of Coastal States Organization’s Recommendations to the US Commission on Ocean.
Puget Sound Salmon Hatcheries April 2003 Puget Sound Salmon Hatchery Management Decision Making ESA & NEPA Processes Independent Scientific Review Process.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Implementation of the Lower Columbia River Recovery Plan Northwest Region August 19, 2013.
Puget Sound Harvest Status of ESA and NEPA Review Susan Bishop Sustainable Fisheries Division NOAA Fisheries
Tracey Yerxa Bonneville Power Administration Implementing the 2008 FCRPS BiOp Using Emerging Tools and Strategies
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
Columbia River Basin Fish Restoration Activities ACCOMPLISHMENTS TO DATE AND UPCOMING ISSUES Bonneville Legal Briefing – October 2015.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
1 The Collaborative, Systemwide Monitoring and Evaluation Project (CSMEP) CBFWA – Ken MacDonald ESSA Technologies Ltd. - Marc Porter State Agencies IDFG.
Implementing Hatchery Reform The Dawn of a New Beginning or more of the same old thing? Mike Delarm NOAA Fisheries.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
Peyton Robertson, Sustainable Fisheries GIT Chair PSC Meeting February 16, 2012 Sustainable Fisheries Goal Implementation Team: Key Accomplishments.
National Flood Insurance Program ESA Consultation for Online Information Sessions May 11 th and 12 th 2016 Oregon.
COLUMBIA RIVER SALMON CUMULATIVE IMPACTS EXAMPLE.
Chesapeake Bay Program
BPA Expectations for Regionally Coordinated RM&E Programs Jim Geiselman – BPA BPA Expectations on the Development of Standard.
Blaine D. Ebberts Presented at the NPCC Science to Policy Exchange
North Shore Streamkeepers February 23, 2019
Presentation transcript:

FCRPS Adaptive Management Implementation Plan (AMIP) 1 September 15, 2009

Administration Conclusions 2 As implemented with this new adaptive management implementation plan, the 2008 Biological Opinion (BiOp) : Is biologically and legally sound Is based on the best available scientific information Satisfies the ESA jeopardy standard The current BiOp reflects great regional consensus of states and tribes in support of a salmon plan for the hydropower system. We would like to get to work and move on to implementation of salmon actions “on the ground.” It is time to end the litigation.

Administration Review The Obama Administration engaged in a substantial review of the BiOp at Judge Redden’s invitation. Participants included agency leadership from NOAA, CEQ, DOI, DOD & DOE. We conducted listening sessions with parties to the litigation and with agency and independent scientists. We also considered the points raised in a May 2009 letter from Judge James A. Redden. 3

Administration Review Our review indicated the science underlying the BiOp was sound, but that there was uncertainty in some predictions of future fish status. As a result, we have developed an insurance policy for the fish that will be implemented as part of the 2008 BiOp. 4

Adaptive Management Implementation Plan Accelerates and enhances certain BiOp mitigation actions Enhances research and monitoring to evaluate fish status and habitat conditions A new contingency plan to address the possibility of a significant decline in the abundance of listed fish and biological triggers that result in contingency actions Dam breaching studies as a contingency of last resort Ongoing commitments to regional collaboration and science review 5

Accelerated & Enhanced Actions Commitments to additional Estuary restoration projects under a new agreement with the State of Washington Efforts to control predators and invasive species Biologically-based changes to spring and summer spill 6

Enhanced Research, Monitoring & Evaluation What? Improved adult status and trend monitoring Improved Intensively Monitored Watersheds Improved juvenile status and trend monitoring Improved habitat monitoring Enhanced Life -cycle modeling Why? To better measure effectiveness of BiOp actions To better monitor climate change impacts To collect additional information to evaluate triggers 7

Biological Triggers for Implementation of Contingencies Early Warning Indicator: tripped if the four-year average adult wild fish abundance for a species falls below the lowest 20 th percentile of abundance, based on the currently available data Significant Decline Trigger: tripped if the four-year average adult wild fish abundance for a species falls below the lowest 10 th percentile of abundance, based on the currently available data Additional triggers (including juvenile triggers) will be defined in the future through the collaborative Regional Implementation Oversight Group (RIOG). 8

9 Example:

10 Example:

Tripping the Early Warning Indicator Within 120 days of NOAA Fisheries determining that an Early Warning Indicator was tripped, the Action Agencies (in coordination with NOAA Fisheries, the RIOG, and other regional parties) will: Evaluate the likely status of the species in question; Determine whether a Significant Decline Trigger is likely to be tripped; If so, determine what Rapid Response Actions to take Implement actions as soon practicable (not later than 12 months after indicator observed) 11

Within 90 days of NOAA Fisheries’ determining that the Significant Decline Trigger was tripped, the Action Agencies (in coordination with NOAA Fisheries, the RIOG, and other regional parties) would: Determine which Rapid Response Actions to take for a particular species; and Implement the actions as soon as practicable (not later than 12 months after the trigger occurs) Tripping the Significant Decline Trigger 12

Contingency Actions Rapid Response Actions are to be implemented within one year of a trigger. Examples: Additional hydro operations Increased predator control Safety-net hatcheries Certain harvest controls within existing agreements 13

Contingency Actions Long-Term Contingency Actions are to be developed by Examples: Additional hydro system actions Enhanced predator controls Certain harvest controls Conservation hatcheries Species reintroduction Study of operation of John Day Dam at minimum operating pool Study of lower Snake River dam breaching 14

Lower Snake River Dam Breaching Studies The Corps creates a study plan by March 2010, including scope, schedule and budget to complete technical studies and formulate a decision process NOAA/ Region builds analytic tools by December 2012 for full Life-cycle analysis of all contingent actions Upon Significant Decline Trigger— All-H analysis completed within six months to initiate technical studies. Corps conducts technical studies in two years (biology, economics, engineering, environmental impacts) Then, Administration decides if evidence exists to move to EIS and Decision Process whether to request Congress authorize to breach one or more dams Dam breaching is a contingency of last resort due to uncertainty of biological effects and significant impacts to local communities and the environment 15

Ongoing Regional Collaboration & Independent Scientific Review To continue partnerships with states & tribes To provide for ongoing science input To ensure transparent reporting on progress 16

17

Implementation Science-based plan with commitment to implement it Broad regional support Commitment to fund BPA new rates already in place 18