CERN, 21-4-2009 Main challenges for the ATLAS upgrade project in the coming year.

Slides:



Advertisements
Similar presentations
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
Advertisements

Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Technical Support Activities in PH-ADO-PO
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
ATLAS and CERN/ST 2nd April 2003 Marzio Nessi. 02/04/2003 Today ATLAS project Detector Components Construction Detector Integration and Installation ATLAS.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
2 nd PH-DT Training Seminar CERN TODAY An introduction to rapid prototyping techniques by C.Bault, PH-DT-EO NEXT on 3 th October at 11:00 Overview.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
Introdcution to Workpackage/Activity Reflection D. Schulte.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Detector SimOOlation activities in ATLAS A.Dell’Acqua CERN-EP/ATC May 19th, 1999.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Straw man layout for ATLAS ID for SLHC
ADO-PO section meeting. ADO : Atlas Detector Operation
TC activities.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
TDAQ Phase-II kick-off CERN background information
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
KEK news ( ) S.Tanaka.
Machine-Experiment Interface
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Upgrade Strategy for the Experimental Vacuum Systems
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Technical Support Activities in PH-ADO-PO
HL-LHC upgrade at IPHC news
Presentation transcript:

CERN, Main challenges for the ATLAS upgrade project in the coming year

Upgrade in 2 phases 10/28/2015 New injectors + IR upgrade phase 2 ATLAS will need ~18 months shutdown shifted one year Collimation phase 2 Linac4 + IR upgrade phase 1

Phase I Insertable b layer : add a new 4 th layer near to the beam pipe  new project structure defined (PL: G.Darbo, TC: H.Pernegger)  2009 write TDR, editors K.Einsweiler, M.Capeans  start procurement  install during shutdown 2013/14 (8 months) Upgrade the steel beam pipe to an Aluminum one (or Be or Al-Be), in order to reduce activation (ALARA) and backgrounds in the muon spectrometer. Need R&D … just starting R.Veness section Improve various shielding elements (a new shielding on the end cap toroid, new moderator wall between UX15 and USA15). Need design and implementation plans Install in the muon spectrometer a new ring (EE chambers) …. Starting now, should be done by /28/2015

Phase I Upgrade the CSC region in the muon small wheel with new/more detectors … might be rebuild JD wheel too …. Steel under discussion Rebuild LAr low voltage PS …. Probably already in 2010 Rebuild a new ID evaporative cooling plant (external) …. Starting now Consolidate many infrastructure components (no single point of failure, fix bugs, optimize maintenance, ….) Upgrade and optimize the opening/closing scenari (ALARA, time, safety, risks, …) Optimize/upgrade TAS shielding/aperture to couple with the new triplets (large aperture) …. This is a major activity 10/28/2015

Phase I Shutdown of 8 months in winter 2013/14 as earliest date It depends how much statistics we have cumulated by then (integrated luminosity, final energy) …. It might be too optimistic … we might not want to stop collecting statistics … physics will guide us Beam protection (collimation) has to follow We do not know yet which interventions are due on the various detector components due to failure …. We have to be open and adapt to the events …. Probably from 2011 ALARA will be our main concern for any intervention/upgrade …. We need to develop a new culture! 10/28/2015

Upgrade in 2 phases 10/28/2015 New injectors + IR upgrade phase 2 ATLAS will need ~18 months shutdown shifted one year Collimation phase 2 Linac4 + IR upgrade phase 1

Phase II when, why? Physics will tell us We know that the inner most detectors will age at ~500 fb-1 … so we need to plan a new generation of detectors We know that the TRT will have occupancy problems above L > 2* In 2017/18 several of our technologies will be old (electronics, computing,..) The main driver in the process is the ID ….. We will need a new one in any case to run after /28/2015

New ID 10/28/2015

How do we guide the process? Concept of a central project office:  Provide central services (CAD library, drawings validation and distribution, schedule, review process, mechanics and electronics coordination, … )  Define, execute common tasks (installation, services layout and installation, logistic, transports, clean rooms, ….)  Support common procurements, common tests benches or assembly tools, …  Centralize R&D and the implementation of key infrastructure like power, cooling, beam pipe,..…  Overview the R&D and prototyping and components production in the outside institutions, steer the writing and definition of the MOU process  Centralize all ALARA/RP issues and provide effective solution for it at the design and execution level 2009/2010 we will write a LOI and we will slowly start to organize a new project structure Helping in defining the role of CERN as host institution and as research partner (probably more oriented in the phase of preassembly on the surface and strong participant in the PO) 10/28/2015

In practice PO exists since few years, now we are reorganize it PO is deeply involved in the LOI, TDR process PO organizes monthly general meetings across the collaboration PO organizes design reviews and schedules PO provides key engineering manpower distributed in the various working groups, provides coordination in WGs where the project structure is still not defined PO overview directly activities related to cooling, service layouts, installation and de-installation procedures, ALARA, shielding, micro electronics, …. CERN provides already fey key engineers/physicists imbedded in various working groups/structures (ID overall mechanics, IBL mechanics integration, IBL TC, LAr mechanical integration, Overall electronics integration, ALARA/RP, LOI/TDR editors, ….) …. Some of these people are part of the existing TCn, other ATLAS/CERN detector group, other PH support groups. 10/28/2015

In practice We are creating WGs, systems, project structures and we overview their operation and functioning …. We will now use the LOI/MOU to better define all mandates and structures We are trying to provide to the collaboration common tools, working methods and a correct sharing of information ~ 8-10 CERN FTE are today active on the upgrade project (my estimation!) We try very hard to bring coherence into the process, bringing in all partners in the running process, avoiding divergence 10/28/2015

Phase II field of activity Inner Detector : define layout, design, components strategy (staves, front end electronics, …), central mechanical and electronics integration, prototyping, production and assembly organization, installation/qualification process, new cooling plants, we power strategy. We aim for a completely new ID by 2018 Calorimeters : new front/ back end electronics, new LV PS. LAr forward might need full redesign or new readout implementation, new cryo cooling, probably we will need to open and act on the endcap cryostats in situ. All to be ready for the long shutdown Muon spectrometer : new trigger chambers in the forwards region, one additional trigger layer in the barrel too, new gas strategy, new readout electronics. All this is still not fully defined …. We are just starting the discussion process inside the collaboration … we hope the installation process can be distributed for installation outside the main peak Trigger/DAQ : we might need a ID LVL1 trigger, DAQ will evolve with time and with the new requirements coming from the detector Shieldings : all shieldings will need to be revised and probably the forward one re- designed to couple with a factor 10 more BG. Probably Be pipe in the entire detector. 10/28/2015

What we can do together (personal view) ? Work in a coherent way inside the project definition, be part of the overall process Avoid to single out CERN as a special research group, with specific mandate defined by various independent CERN actors. Accept the concept that CERN adapts to the collaboration needs and find its specific place inside the collaboration topology Bring resources inside the PO and help in steering the process Avoid the concept of common project across CERN. It has never worked out. If is necessary we will define it with you (cooling, micro electronics,….) Lets try to single out few key activities of preassembly, integration where we will need at CERN central facilities (ID assembly on the surface, IBL integration on the surface, …..), insert this work in the collaboration reasoning at the MOU level. Avoid to have CERN competing with outside institutions. Avoid to build components, concentrate on assembly and final qualification tests Do at CERN work which is not likely to happen outside CERN. Build up specific competences as Host Lab 10/28/2015