1 JIC SDO Standards Development Processes Prepared by Dave Iberson-Hurst, CDISC 19 th January 2010 Second Draft.

Slides:



Advertisements
Similar presentations
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Advertisements

SEM14-05 Approving your draft ETSI Seminar © ETSI All rights reserved.
SEM14-05 APPROVING YOUR DRAFT ETSI Seminar © ETSI All rights reserved.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
INTERNATIONAL ELECTROTECHNICAL COMMISSION How to develop an IEC standard? Shenzhen – Dennis Chew Officer-in-Charge IEC Asia-Pacific Regional.
Planning at CMM level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements Engineering.
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
ESSnet Stanprep The CEN Standardisation Process. CEN Overview: A standard (French: Norme, German: Norm) is a technical publication that is used as a rule,
Miles Shepherd Chairman ISO Technical Committee 258.
ISO Current status of development
ISO 9001:2015 Revision overview - General users
MODULE B - PROCESS SUBMODULES B1.Organizational Structure B2.Standards Development: Roles and Responsibilities B3.Conformity Assessment: Roles and Responsibilities.
ASME C&S Training Module B5 MODULE B - PROCESS SUBMODULES B1. Organizational Structure B2. Standards Development: Roles and Responsibilities B3. Conformity.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
2014 Work Planning Local Program Leadership Team.
ISO 9001:2015 Revision overview - General users
S/W Project Management
1 ANSI Conference on U.S. Leadership in ISO and IEC Presented by Mr. Steven P. Cornish Director, International Policy American National Standards Institute.
IECM Briefing: XML Community of Practice Betsy Fanning AIIM.
Marina Signore Head of Service “Audit for Quality Istat Assessing Quality through Auditing and Self-Assessment Signore M., Carbini R., D’Orazio M., Brancato.
TOSCA Technical Committee Kick-off December 12, 2011.
Conformity assessment – Standards and CEOC’s involvement Annual Conference 31 of May 2010 in Vienna Dipl.-Ing. Gerd-Hinrich Schaub CEOC International.
Click to add title SABS STANDARDS DIVISION Standards Development Natural Science.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
10/27/111 Longitudinal Care Work Group (LCWG) Proposal to Re-Scope and Re-Name the LTPAC WG.
MarkeTrak Lessons Learned Summary Report Retail Market Subcommittee February 14, 2007 Adam Martinez & Scott Egger Market Operations Division Projects Organization.
© 2013 IBM Corporation OSLC WG Transition **DRAFT** Plan 8 April 2013 Open Services for Lifecycle Collaboration Lifecycle integration inspired by the web.
Transfers Task Force Briefing ICANN Domain Names Council Meeting March 12, 2002 Registry Registrar BRegistrar A.
Developing NAEP Frameworks: A Look Inside the Process Mary Crovo Deputy Executive Director National Assessment Governing Board November 17, 2007.
SC7 - IEEE CS Activity Status Report – T. Doran 6 November 2007 To: J. Walz IEEE CS SAB
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
ISO Current status of development ​ ​ ISO development process ​1​1.
Provenance and Context Content Standard (Emerging) – Status of Activities H. K. Ramapriyan Science Systems and Applications, Inc. & ESDIS Project, Code.
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
ST18 subgroup report 23 november ST 18 subgroup The ST18 subgroup, convened by the co-chairs, to: – Assess existing options, areas of agreement.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
Dual Logo Procedures Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 November 2004.
1 DRAFT October 22, 2008 Ed Larsen Framework Review Working Group Plan.
Voting options and deliberations (October 2009) ISO/DIS Guidance on Social Responsibility Guido Gürtler, ICC Observer to ISO/TMB WG SR, Member of.
CDISC CEN/TC251 GS1 HL7 IHTSDO ISO/TC215 Joint Initiative on SDO Global Health Informatics Standardization Joint Initiative Meeting Model.
SECTION BYLAWS APROVAL PROCESS Five Easy Steps. Step 1: Collect Data Obtain Template from SWE Communities Professional Section Bylaws Community Collegiate.
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
BRIDG Update RCRIM Working Group Meeting Rio de Janeiro 17 May 2010 Julie Evans Senior Director, Technical Services, CDISC Wendy Ver Hoef Senior Analyst,
2016/6/11 1 Liaison Report on ISO/TC215 Hidenori Shinoda 6/29/2007 Berlin.
© 2013 Health Level Seven ® International. All Rights Reserved. HL7 and Health Level Seven are registered trademarks of Health Level Seven International.
International Electrotechnical Commission International Electrotechnical Commission.
Page © ASME 2016 Module B – Process B8a. US TAG to International Standards Organization (ISO) Standards Development Standards and Certification Training.
IEEE CS SAB, Mar 2009 IEEE Computer Society Category A Liaison to ISO/IEC JTC 1/SC 40: Status Report Annette Reilly IEEE Computer Society
2017 Amendments to the INCITS Organization, Policies and Procedures
Standards Development: An Overview
Project Charter START IT! By Catherine B. Calio, PMP
SARIF TC Timeline Proposed, approximate.
Preparing for NCPDP Joint Technical Work Group Meetings
iECM Briefing: XML Community of Practice
TOPIC THREE TRUTH OR FICTION? IEC IS EUROCENTRIC.
Presented to the CEOS WGISS October 22, 2018
ICAO Aviation English Language Test Endorsement
West Essex Business Planning Process
W. Shannon Black Manager, Standards Processes
A Global Consensus Process
Credit and Pathways Management Road Ahead Feb – Mar 2018
European Standardization
Presented to the CEOS WGISS October 10, 2019
Presentation transcript:

1 JIC SDO Standards Development Processes Prepared by Dave Iberson-Hurst, CDISC 19 th January 2010 Second Draft

2 Purpose of Slide Set The purpose of the slide set is to provide an overview of the processes employed by the SDOs that constitute the JIC The slide set shows the alignment between the processes used by the SDOs and also illustrates the time taken to develop standards using the processes.

3 Notes Regarding the Slide Set Each “real” slide is preceded by a slide containing information relevant to the following slide. These have been included such that this slide set can be understood without explanation from myself during the JIC meeting on the 20 January 2010 in Phoenix, AZ Also, please note, SDOs are ordered in alphabetical order based on the SDOs acronym, there is no deeper meaning intended IHTSDO has not been included at this time due to time constraints.

4 Note for Slide “The Generic Process” This is based on the document “An overview of SDO processes and processes for common / harmonized standards development (Normative Standards). DRAFT FOR COMMENT. Version 2.1, 24 April 2008”, referred to as the JIC Process Document It represents the generic SDO development process

5 The Generic Process Preliminary Project Assessment Project Proposal Project Approval Develop Initial Version Membership/Public Review Final Approval Publication Maintenance Reach Initial Consensus

6 Note for Slide “CDISC Process” TAC = Technical Advisory Board – A subset of the elected CDISC board members who provide oversight of the technical work undertaken by CDISC TLC = Technical Leadership Committee – Consists of the Team Lead of each CDISC technical teams CDISC does not have an equivalent of the Preliminary Project Assessment Information sourced from the CDISC document COP- 001 Standards Development The idea for each of the SDO slides is to map to the generic process so that differences become apparent and visible

7 Preliminary Project Assessment Project Proposal Project Approval Develop Initial Version Membership/Public Review Final Approval Publication Maintenance Reach Initial Consensus Project Scope TAC Approval Team Development TLC & Expert Review Public Review TLC Approval Publish to Web Site Maintenance CDISC Process

8 Note for Slide “CEN Process” Information presented in based on the JIC process document and a slide presentation from the CEN web site: “Getting Started... How to develop a European Standard” by Ashok Ganesh There is a gap on the project approval stage (marked by “???”). Needs to be filled in.

9 Preliminary Project Assessment Project Proposal Project Approval Develop Initial Version Membership/Public Review Final Approval Publication Maintenance Reach Initial Consensus Preliminary Questionnaire New Work Item approval Working Draft Enquiry Final Vote Publication (EN) Maintenance CEN Process New Work Item Proposal

10 Note for Slide “HL7 Process” Based on the JIC process document and personal experience. Therefore probably needs checking! TSC = Technical Steering Committee HL7 does not have an equivalent of the Preliminary Project Assessment

11 Preliminary Project Assessment Project Proposal Project Approval Develop Initial Version Membership/Public Review Final Approval Publication Maintenance Reach Initial Consensus Project Scope Statement TSC Approval Working Group Development Committee Ballot Full Member Ballot TSC Approval Publication Maintenance HL7 Process

12 Note for Slide “ISO Process” Based on the JIC process document and the ISO web site page “Stages of the development of International Standards”, – ISO stages of development are the default process – Each TC operates with any number of agreements which effects document timeline and number of ballots – Depending on the document, level there may be 2 or more different agreements for one document

13 Preliminary Project Assessment Project Proposal Project Approval Develop Initial Version Membership/Public Review Final Approval Publication Maintenance Reach Initial Consensus Preliminary Work Item Approval Working Draft Committee Draft Draft International Standard Final Draft International Standard Publication (IS) Maintenance ISO Process New Work Item Proposal

14

15 Note for Slide “Alignment” The previous slides show each SDO’s process aligned with the generic one. It allows for aspects of the process to be highlighted. The next side puts all of the processes along side each other to allow for a simple comparison to be made.

16 Preliminary Project Assessment Project Proposal Project Approval Develop Initial Version Membership/Public Review Final Approval Publication Maintenance Reach Initial Consensus User Requirements Project Proposal Business Requirements Gathering Standards Development Architecture Reviews Gen Spec Change Notice Post to Web Annual Maintenance GS1 Process Call To Action

17 Project Scope TAC Approval Team Development TLC & Expert Review TLC Approval Pub. to Web Site Maint. TSC Approval Working Group Development Committee Ballot Full Member Ballot TSC Approval PublicationMaint. Preliminary Project Assessment Project Proposal Project Approval Develop Initial Version Membership/ Public Review Final Approval PublicationMaintenanceReach Initial Consensus Project Scope Statement PWI Approval Working Draft Committee Draft (CD) Draft Intl Standard (DIS) Publication (IS) Maint. NWIP Approval Final Draft Intl Standard (FDIS) NWIPl Approval Enquiry Final Vote Publication (EN) Preliminary Questionnaire Maint. Working Draft

18 Note for Slide “Where the Time is Spent” Slide This slide is to show where the relative effort is The circles represent months of elapsed time Assumes that a technical standard takes 12 months to write but obviously this could vary widely depending on complexity and other factors Where two colours are used the darker colour indicates the minimum time for the activity with the lighter colour being used to indicate that the activity might well take longer depending on the complexity of the standard, number of comments received etc. Symbols – The small clock icon indicates that the activity has time constraints such as review cycles (must start at the beginning of a cycle or can only be completed at a F2F meeting). This is important as this can have major impact on timelines (e.g. An NWIP can only be approved at a F2F ISO TC 215 meeting, is that true?) – The small question mark indicates an optional stage. – The small diamond used in place of the circles indicates that the stage is usually a few days in duration – Black circle with an “N” indicates that the stage is Not Applicable to that SDO Slide is not complete, needs extra info on stage durations and also I think some of the stages have time/cycle constraints (ISO & CEN NWIP/ballots happening around F2F meetings) Does not, currently, take into account the HL7 DSTU status, which can be 2 years. CEN and ISO total duration time for the entire process needs to be entered. CEN quotes 3 years. ISO has 3 tracks, 2, 3 and 4 years.

19 Where the Time is Spent ? ? Preliminary Project Assessment Project Proposal Project Approval Develop Initial Version Membership/ Public Review Final Approval PublicationMaintenanceReach Initial Consensus 12 ? ? 2 2 ? ? ? N N 19 ? ? 21

20 Where the Time is Spent - Questions ? ? Preliminary Project Assessment Project Proposal Project Approval Develop Initial Version Membership/ Public Review Final Approval PublicationMaintenanceReach Initial Consensus 12 ? ? 2 2 ? ? ? N N 19 ? ? 21

JIC Alignment Having worked through the above we see the SDO’s processes in “isolation” Further issues can arise when JIC tries to co- ordinated work across SDOs such as: – Alignment of ballots/review – Documentation format issues – Others? It may be worth doing some work trying to assess these impacts and describing them on a slide