SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

My Life Monday What do you know about overhead crane safety? Overhead crane safety may not be relevant to all staff but dont you think it would be interesting.
Electrical Safety.
Electrical Installation
How to use this presentation. How Power is Restored After a Severe Storm Presented by YOUR NAME YOUR TITLE.
1 Safety provisions in the Electricity Acts and Rules Presented by Chief Electrical Inspector (T&D), Orissa.
ELECTRICAL SAFETY / E N V I R O N H & S T R A I N I N G P R O G R A M ELECTRICAL SAFETY OSHA requires that electrical equipment be approved for use and.
1 SINGLE-PHASE METALLIC RETURN TECHNIQUE Presented by Moncef AISSA Senior Engineer STEG-Tunisia March 7, 2006 contributors - E. Cecelsky - A. Ounalli -
Cranes, Hoists and Truck Hoists
Chapter 2 ELECTRICAL POWER SUPPLY AND DISTRIBUTION IN BUILDINGS
EET Survey of Electronics
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Electrical Power Systems
DET 310 UNDERGROUND CABLES
ABS Ennin, George Coleman, David Dadson & Anthony Ansah
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Electrical Safety Safety Training Series
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Increasing the life cycle of existing grids to avoid high replacement costs of new systems By S.R.Sethi Member Delhi Electricity Regulatory Commission.
Electrical Safety INSTRUCTOR’S NOTES:
Electrical Safety. Defective Insulation To protect you, electrical wires are insulated by a plastic.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
APPLIED ELECTRICITY SS3
Electrical Safety INSTRUCTOR’S NOTES:
Grounding, bonding, and ground fault currents
ESTW/ Castor The company has to take care that: Equipment and switchgears are operated according relevant standards The errection, extension and maintenance.
Copyright  Progressive Business Publications Electrical Safety.
Electricity. Electricity Electric shock happens when a person becomes part of an electrical circuit and the current flows through their body. When an.
Page No. 1. Page No. 2 PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT KARACHI PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Submitted to: Submitted by:
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
Distribution Systems-General
Department of Electrical Engineering
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
132KV GSS PIPAR CITY JODHPUR
Compiler: Aler L. Pagente Lyn Clarie T. Booc. What is electricity? Electricity Electricity is one of the fundamental forces of nature. Wherever electricity.
Submitted To:- Submitted By:- Mr.
Electrical Safety, Subpart K
A PRESENTATION On 400KV GSS SURPURA JODHPUR
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
All About Workplace Electrical Safety
Residential Wiring Unit 3 – Installation and Planning.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
ELECTRICAL INSTRUMENTS ( service and utilization )
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
BASIC ELECTRICAL SAFETY. INTRODUCTION PURPOSE: To provide employees with safe work practices & procedures to prevent an electrical accident or injury.
Electrical Safety.
Sub Station.
“Success in Safety”.
SUB-STATIONS.
Electricity is produced at the power station.
What should we do to make sure we use electricity safely?
Basics of electrical engineering
Hazardous Areas & Hazards of Electricity
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Personal Protective Equipment
Installation And Estimation of Service Connection
ELECTRICAL POWER-II Electrical engineering sixth semester
Safety Meeting Topics Standby Generator Safety
Click anywhere to get started…
Objectives Learn about 3 Phase vs. 1 phase F&N vs. 1 phase F&F
Topic 1: Cables and conductors
Presentation transcript:

SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO

SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM FOR REDUCTION OF ACCIDENT THERE OF UNDER NESCO n Safety in power distribution system means prevention of loss of life, property, avoiding accidents and free from danger of self, co – workers, equipments and consumers. Lack of safety can lead to accidents and accidents lead to loss of property and life. All of us should put out sincere efforts to improve safety and implement safety measures to stop accidents. It is not one man’s job but it’s the collective responsibility of the management and its employees. n NESCO is getting power supply from three 220 KV interface points i.e. Duburi, Joda and PGCIL S/S at Kuchie.There are thirteen nos. of GRID S/S under NESCO and it cover supply area of 28,000 Km2.Total population covered by NESCO is above 90 Lakhs covering 5 nos. of districts,36 nos. of Tahsils,68 nos. of admin blocks,1430 nos. of Gram Panchayats,12131 nos. of villages,16 nos. of NAC/Municipality,4 nos. of distribution Circles,14 nos. of Distribution Divisions,41 nos. of Distribution Sub – Divisions & 141 nos. of Distribution Sections. n Maximum Demand of NESCO is 620 MVA with Power Transformer installed capacity of 704 MVA.Total nos. of 33/11 KV S/Ss in NESCO is 124 nos. with 260 nos. of Power Transformers.NESCO has 18,148 nos. of Distribution Sub – Stations with Distribution Transformer installed capacity of MVA.Total length of 33 KV line is Kms, total length of 11 KV line is Kms and total LT line length is 17, Kms. n Reported nature of accident of NESCO area :- n Sagging of line due to stay folding. n Snapping of conductor. n Tree branches touching with line. n Conductor falling on cross arm. n Earth faults due to damage of insulation etc. n Hooking of line. n Unauthorized use of electrical supply. n Age old conductor with lengthy LT lines. n Construction of buildings in Rural and Urban areas without having proper information and consultation with the Licensee regarding line and ground clearance.

PREVENTIVE MEASURES:- n NESCO as a responsible licensee is taking best care of implementation of preventive maintenance rather than forced maintenance for proper maintenance of lines and S/Ss in order to supply un interrupted power supply to its consumers ensuing maximum safety of its employees and consumers. n NESCO has a full fledged HT Maintenance Unit having five nos. AMs, five nos. of JMs. and ten nos. of ITI personals, taking care of the maintenance work of the Power Transformers, Breakers and Batteries of all 33/11 KV S/Ss. n Regular tree branch cutting, restringing of conductor, Pole straightening work is carried out in order to avoid accident and ensuing steady power supply. n Various types of supports & cross arms for distribution lines, Insulators & fittings on overhead linesStays,Guys,AB Switches & fuse Units, Lightening Arrestors,33 KV,11 KV Cable & Cable Boxes are installed for maintenance of the HT and LT line network. n Earthing lead of all metal supports, their tightness and firm connections are periodically checked. n Load balancing of LT lines of distribution transformers is regularly done. n Routine inspection of LT,11 KV and 33 KV lines,premonsoon maintenance and breakdown maintenance is carried out in daily,weekly,monthly,quarterly,half yearly and yearly basis. n Last but not the least all the workers, line man and Engineers are provided with good training of safety measures and safety equipments while working with electrical line and equipments for increasing their efficiency along with ensuing their safety. n In the last quarter the enclosed list of materials were released for ensuing proper maintenance of lines and S/Ss leading to build up of a healthy network. n (Annex – I)

Steps taken by NESCO to Prevent Electrical Accidents- Annesxure - I n Replacement of km of ageing conductor with new one under System Improvement and O&M head. n 2025 Nos. of PSC poles have been utilized for interposing, replacement of damaged poles and new lines. n 743 Nos. of damaged stays have been replaced by new one. n Inspection of LT/HT lines, Tree branch cutting, repairing of tilted poles, replacement of damaged poles is under progress. n 1736 Nos. of Earthing devices issued to all the divisions. n Installation new 13 nos. of 33 KV and 27 nos. of 11 KV VCBs have been completed n Boundary wall and gate for 161 nos. of sub-stations have been completed. n Other items like 11 KV LA nos., 33 KV LA – 52 Nos 33 AB switches – 28 Nos. 11 AB Switches (2 pole and 3 pole) – 352 Nos., 33 KV HG fuses - 6 Nos. have been installed n 425 Nos. Hand Gloves have been issued for safety of Electrical personnel. n Replacement of km of bare conductor by A B Cable.