Energy for the Future Belene Nuclear Power Plant Project Status.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Mag. Martin Oder, LL.M. OECD/SIGMA Concessions and Public.
Research Contracts and IP Services TRAINING WORKSHOPS ON HORIZON 2020 – 27 NOV 2014 The Grant Agreement Roger Wallace – Research Contracts & IP Services.
PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATION 19 OCTOBER 2010.
Enabling Private Sector Investment To Deliver Privatisation Bolanle Onagoruwa Director General Bureau of Public Enterprises Presidential Power Sector Workshop.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
Construction Industry Development Board development through partnership “Towards Uniform Conditions of Contract and Specifications in South Africa” South.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
Time for a new standard - AS General Conditions of Contract
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Business Acquisition Process Implementation & transition Closing Negotiation of the transaction Due Diligence Engagement TargetIdentification.
Structured Transaction Overview. FDIC serves as an equity partner in its Receivership capacity for a single or multiple institution transaction. Joint.
CAHF CEO Conference May 31, Genesis HealthCare Overview “Go Private” Transaction Overview OPCO/PROPCO – REIT Transaction Questions and Answers Today’s.
CH1 INTERNATIONAL TRADE CONTRACTS
1 IMPLIMENTATION OF CONTRACT CLAUSES Presentation by SRI. S. SREEKUMAR GM(ENGG), NER Dt
IMPLEMENTATION OF PROJECTS 25 July 2013 Lt Col (Retd) L Shri Harsha Project Management Consultant & Technical Arbitrator.
Key Provisions in Standard Contract Conditions Presented by Simeon A. Sahaydachny Kyiv, 20 April
Date: 16 April 2010 Adapting FIDIC Standard Forms for Local Conditions and Regulations TCDPAP Annual Conference - '‘New Approaches and Solutions for Consultancy.
Copenhagen, 5th March 2009 dansk byggeri - Export Section1 By Frank Kehlenbach Director of EIC.
H11.pE-3.0 Welcome Master of Project Management / International project contracts - r 1.1 – slide 1 International project contracts E.S.C.T
Public Procurement Procedure – Bidding Documents
TERM LOANS PROCEDURAL REQUIREMENTS. Obligations of assistance.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2013 till March 2014.
IMPLEMENTATION OF ACTION PLAN FOR SUMMARY CPV REGULATION & IMPLEMENTATION Using of CPV codes became mandatory in Europe from December 16, 2003.
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
1 Instructions to bidders  Eligibility  Procedure for clarifications  Bid preparation - form  Number of copies, addressee  Language  Pricing and.
Prokurimi Publik në Kosovë Public Procurement System in Kosovo Public Procurement activities for 2011 Mr. Safet Hoxha, President of PPRC Mr. Ilaz Duli,
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Anatomy of contract for the acquisition of distressed companies FHUI, Contract Drafting November 29 th, 2011.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Drafting and Documentation DOCUMENTING THE TRANSACTION FROM START TO FINISH.
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
Azerbaijan Deposit Insurance Fund «Mandate and powers of deposit insurance schemes» 29 April 2014 Azerbaijan Deposit Insurance Fund Mandate.
Contract Review: Practices and Pitfalls Cynthia A. Haines, Esquire Post & Schell, PC LeadingAge PA Annual Conference June 16, 2016.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Overview of Industry and Transaction Agreements Share Sale Agreement, Shareholder Agreement and Concession Agreement Nina Bowyer, Partner 29 November 2011.
1 ST Market Engagement Session 3 rd October 2014 RE-PROCUREMENT OF CUSTODIAL TENANT DEPOSIT PROTECTION SCHEME Presentation by Ruth Hayes.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
PROCUREMENT General Overview of Procurement Process on Dublin Waste to Energy Project.
Procurement and Contract Management Training
University of Calgary Continuing Education
Content of Tender Dossier - Instructions to Tenderers - Tenders
János Krutzler Hungarian Atomic Energy Authority
Particular Conditions of Contract & Appendix to Tender
WORLD BANK Harmonized SBD-Works
Evaluation Grids Evaluation Grids.
Contract implementation - Management of Suppliers -
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
NATIONAL PROCUREMENT IN LATVIA
Particular Conditions of Contract & Appendix to Tender
Makerere University Investors Conference
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
All Wales Safeguarding Procedures Review Project
THE EMPLOYER Right, of access to the site.
Enhancing Procurement Efficiency: Litigation Issues, Standard Bidding Documents and eGP Shakti Prasad Shrestha March 21, 2018.
Construction Contract Administration
Grant Implementation Agreement (GIA)
SUMMARY OF 2018 AMENDMENTS TO RULE 15c2-12
Presentation transcript:

Energy for the Future Belene Nuclear Power Plant Project Status

Energy for the Future Project Status General Data Reactor typePWR, Russian Design Plant supplierASE, AREVA NP/SIEMENS Reactor thermal power 2 x 3012 MW Electric output2 x 1060 MW Net efficiency35 % Capacity factor90 % Design Life Time60 years

Energy for the Future Final EPC Contract (Contract Agreement) Based on the FIDIC Silver Book (Conditions of Contract For EPC/Turnkey Projects) The Contract Agreement is signed on January 18 th, 2008 The Contract Agreement consists of: Terms and Conditions −Appendixes −Agreement between NEK and ASE dated November 29th,2006

Energy for the Future Main Principles of the Contract Agreement (1 of 5) General Provisions: –Applicable Law: Bulgarian law; –Language: English; –Definitions. General Rights and Obligations of the Employer (NEK): –Transfer of the Site; –Responsibility for the Permit and Licensing Process. General Rights and Obligations of the Contractor (ASE): –Responsibility for the Licenceability of the Project; –Subcontractors; –Quality Management, Care of Work & Safety; –Protection of the Environment; –Performance Securities; –Contractor’s Equipment; –Progress Reports; –Security of the Site.

Energy for the Future Main Principles of the Contract Agreement (2 of 5) Design: –General Responsibility of the Contractor –Technical Standards and Regulations Plant, Materials, Workmanship: –Manner of Execution & Safety –Inspections and Testing –Rejection –Remedial Work Time for Completion: –Extension of Time for Completion & Suspension –Project Schedule and Delays Liquidated Damages Retention Money –Suspension

Energy for the Future Main Principles of the Contract Agreement (3 of 5) Commissioning: –General Responsibility of the Contractor; –Guarantee Tests. Defects Liability: –Warranty Period; –Remedy of Defects & Removal of Work. Provisional and Final Acceptance: –General Responsibility of the Contractor; –Early Take-over; –Certificates. Variations: –Procedure; –Notices.

Energy for the Future Main Principles of the Contract Agreement (4 of 5) Contract Price: –Procedure & Payments. Termination by the Employer: –Rights, Claims & Procedure. Termination by the Contractor: –Rights, Claims & Procedure. Insurance: –General Obligations of the Employer; –General Obligations of the Contractor. Force Majeure: –Procedure, Notices & Actions

Energy for the Future Main Principles of the Contract Agreement (5 of 5) Hazardous Materials: Radiological Protection: Nuclear Liability: Disputes and Resolution: –Amicable settlement; –Coordination Meetings; –Arbitration Procedure. Representations and Warranties:

Energy for the Future Strategic Investor Involvement On 2nd of May 2007 NEK invite candidates for participation in the tender procedure for Strategic Investor; On 6th of June 2007 NEK received Letters of Intent from 10 companies – CEZ, ATEL, ENEL, RWE, E.ON, EDF, Electrabel, EGL, Endesa and Kumerio Med; On 17th of July 2007 NEK’s Board of Directors took the decision to separate the candidates in two groups (A and B) according to the percentage indicated in their application to participate in the Project – group A includes 6 candidates (CEZ, ENEL, RWE, E.ON, EDF and Electrabel) willing to acquire 49%; From the beginning till now (1 of 3)

Energy for the Future Strategic Investor Involvement In the periods as from 13th till 31st of August 2007 and as from 12th till 22nd of September 2007 for the Strategic Investors there were organized project data room access and meetings with NEK’s management and experts ; On 17 th of October 2007 the candidates (5 of them) submitted to NEK their preliminary unbinding offers; In the period as from 5 th November till 7 th of December there were organized presentations, Q&A sessions and two rounds of negotiations with Strategic Investors; On 9 th of January 2008 five candidates (CEZ, ENEL, RWE, E.ON, and Electrabel) submitted to NEK their final unbinding offers; From the beginning till now (2 of 3)

Energy for the Future On 10 th of March 2008 the Board of Directors of NEK EAD approved Electrabel (Belgium) and RWE Power (Germany) as “preferred bidders” with whom to continue in phase 2 of tender procedure for External Investor in Belene Power Project; In the period as from 7 th of April till 13 th of May 2008 for the Strategic Investors there were organized second extended project data room access, meetings with NEK’s management; As from 23 rd of April NEK organise for candidates various meeting with different experts from different institutions. Strategic Investor Involvement From the beginning till now (3 of 3)

Energy for the Future Strategic Investor Involvement Preliminary binding offers submission from the Preferred Bidders; Negotiation process; Signing of Shareholders’ Agreement. From now till the end of the process (1 of 1)

Energy for the Future Strategic Investor Involvement Timeline

Energy for the Future On 6 th of July 2007 NEK announced a tender for Lead Structuring and Arranging Bank; On 24 th of September two banks (Societe Generale and BNP Paribas) requested to participate; NEK examined the submitted requests to participate in the tender and on 11 th of October 2007 invited both candidates to submit initial offers; On 31 st of October the candidates submitted to NEK their initial offers; Lead Structuring and Arranging Bank Tender process (1 of 2)

Energy for the Future As from 11 th of December 2007 till 5 th of March 2008 NEK entered into 3 round negotiation process with the candidates. On 21 st of April 2008 NEK’s Board of Directors took a decision and ranked BNP Paribas on 1 st place and Societe Generale on 2 nd place. Lead Structuring and Arranging Bank Tender process (2 of 2)

Energy for the Future Lead Structuring and Arranging Bank Timeline

Energy for the Future Project Belene Timeline

Energy for the Future Phase I – Structuring –bankability review; –consultants due diligence; –risk matrix preparation; –development of project financing base case; –preliminary market test; –financial plan delivery. Phase II – Fund raising –optimisation of financial plan; –market test; –term sheet finalisation; –MLA choice. Phase III - Documentation –loan document negotiation; –financial close. Lead Structuring and Arranging Bank Scope of work

Energy for the Future Debt Raising & Equity Partner Process Time Schedule