IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
HGC4ILD - High Granularity Calorimeters for ILD WS 2-Feb-2015 LLR (Paris) 2-Feb-2015 Enrique Calvo Alamillo.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
Tracking Integration Challenges Y. meeting 2013/9/25.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
ENSA -Mar-2015 Santander 3 -Mar-2015 Enrique Calvo Alamillo.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
The HCAL barrel absorber structure
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
DCal-ALICE integration and installation plan and status A. Tauro.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Teleconf ACS – FREIA 28th March 2017
For the CMS Pixel detector
Status of GASPARD mechanics
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Enrique Calvo Alamillo DAEGU
HCAL preliminary analysis and results
Experimental hall design in Japanese site
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
PANDA Yoke of the Magnet
For the CMS Pixel detector
Preliminary Y-chamber specifications – First draft
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Update of experimental hall in Japanese mountain site
SDHCAL Integration Moi j’aime bien SAFARI
Detector hall in mountain regions
Sub-Detector Assembly Area Summary of discussion at ALCW2015
CALICE Collaboration Meeting at UT Arlington
Detector Technology Group
Pixel Detector System (Barrel & Forward)
Silvan Steuli Roland Horisberger Stefan König CMS Upgrade Workshop
Detector hall in mountain regions
For the CMS Pixel detector
Presentation transcript:

IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -

IPN Lyon ILD April 2012 Page 2 ILD mechanical structureContents Barrel Assembly Tooling Cooling Perspectives

IPN Lyon ILD April 2012 Page 3 Barrel design Stainless steel1 wheel (8 mod.)5 wheels Weight (t): 88 t440 t Detectors W. (t): 36.8 t184 t Total Weight (t) : t 624 t Ext. Diameter6770 mm Int. Diameter 4116 mm Lenght 4700 mm Thickness wheel face = 10 mm Thickness absorbers= 15 mm Ext. Diameter : 6770 mm Int. Diameter :4116 mm Lenght : 940 mm x8

IPN Lyon ILD April 2012 Page 4 Barrel design : wheel assembly & detectors integration Barrel Building & GRPC Detectors insertion Welding Method 8 Modules assembling for making a wheel on specific structure 180° rotation to weld both faces, 2 support structure Probably electron beam welding will be used 5 wheels assembled in industry

IPN Lyon ILD April 2012 Page 5 Barrel design : wheel assembly & detectors integration Barrel Building & GRPC Detectors insertion transport of GRPC with specific structure to surface building point 368 GRPC insertion around the wheel connection of gaz, HT, datas and cooling for each GRPC Services installation on each 8 spaces in zone A, ready to be connected Zone A Common services GRPC insertion with specific tool Damper transport structure

IPN Lyon ILD April 2012 Page 6 Barrel Building & services connecting Barrel design : wheel assembly & detectors integration transport and down drafting of barrel insertion structure alone 5 wheels going down separatly on specific structure 5 wheels linked together on the barrel insertion structure connection of services between the wheels Services issues on both sides of the barrel 1 – Barrel insertion structure coud be divided in 5 parts 5x 2 - Wheels down drafted P=200 t 3 - Wheels linked and services connection in 32 zones

IPN Lyon ILD April 2012 Page 7 Barrel Building & services connecting Barrel design : wheel assembly & detectors integration Barrel with 5 linked wheels inserted rails inside the yoke fixation inside the yoke on both sides services installation along the yoke to patch pannels Barrel insertion Services issues to patch pannels CMS « enfourneur »

IPN Lyon ILD April 2012 Page 8 Barrel Building & services connecting : Time estimation Barrel design : wheel assembly & detectors integration On surface : 5 wheels construction : 3 month 368 GRPC production : 1,5 year 368 Grpc Insertion & testing : 6 month In the tunnel : barrel building, connected & tested, insertion: 2 month Services installation from the barrel : 1 month

IPN Lyon ILD April 2012 Page 9 Endcap End caps design One module Module Weight : 50 t Detectors weight : 22.5 t Total weight : 72.5 t One endcap made of 4 modules Endcap Weight : 200 t Detectors weight : 90 t Total weight : 290 t Approximately the same scenario

IPN Lyon ILD April 2012 Page 10 Barrel Services Services : Barrel Gaz For GRPC : green / pink 2 loops by module: Ø14 for principal Ø4 for distribution alternative High Tension : Brown Ø14 for supply Data acquisition : Beige Ø14 for collecting Issues : 8 zones 168 x

IPN Lyon ILD April 2012 Page 11 Barrel Services Cooling Options – Low heat to extract – 3 W/m² for GRPC Big exchange surface – material with good conductivity Leak-less water cooling : no risk for electronic and other detectors, pressure between 0,8 and 1bar (cavitation), balanced network, pneumatic activators needed Bi-phasic gas like CO2 : High Pressure (100 bars), expensive connexions (no leak), small diameter tubes, important exchange coefficient Mono-phasic gas like C6F14

IPN Lyon ILD April 2012 Page 12 ILD mechanical structure. Perspectives Simulations have to be done in this configuration Thermal studies : cooling implantation Seismic studies Barrel insertion Design evolution Services optimization and integration Interfaces, support