Presented by: Judy Ausick April 24, 2012 Rural Water Users’ Training www.waterrights.utah.gov.

Slides:



Advertisements
Similar presentations
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
Advertisements

Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
If my body were a car, this is the time I would be thinking about trading it in for a newer model. I've got bumps and dents and scratches in my finish.
Filing Proofs or Affidavits 2010 Utah Water Users Workshop March 16, 2010 Jared Manning Division of Water Rights.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Hot Topics in Water Rights August 31, 2011 Kent L. Jones, P.E. State Engineer.
Guidelines for accepting Report of Water Right Conveyance Forms (100%) 1.Terminology 2.Questions to ask yourself when reviewing a report of water right.
Community Patent Robert Clarke – Deputy Director Office of Patent Legal Administration
Water Rights: Use and Economics By Travis Hoesli.
Steven Clark Smile Business Products  Network Services Manager  Managed IT Clients vCIO  MCITP: Server Administrator  MCITP: Support Tech & Virtualization.
RWAU Training – April 27 & 28, 2015 Water Rights Teresa Wilhelmsen, P.E. Utah Lake / Jordan River Regional Engineer.
ERSEA Training April 17, /17/2015
If my body were a car, this is the time I would be thinking about trading it in for a newer model. I've got bumps and dents and scratches in my finish.
KENTUCKY BOARD OF NURSING APRN Licensure Application Process What you need to know to navigate through the licensure process. June 22, 2015 Ruby King Credentials.
410th COR Training COR Files Maintenance.
Supply Chain Workshop Islamabad 24th – 28th June 2013
Upper Colorado River Basin Current Water Rights Issues Division of Water Rights April 2005.
Pam Mills (Kit Carson), Jim Covington (Lincoln), Deb Cooper (Washington), Dee Ann Stults (Yuma) Pam Mills (Kit Carson), Jim Covington (Lincoln), Deb Cooper.
Proof Professionals Training July 15, 2010 Salt Lake City, Utah.
Utah Division of Water Rights June 21, 2004 Current Water Right Issues Rural Water Users Association Boyd Clayton
AUTHORIZATION STEPS Fingerprinting Authorizations Responsibilities School Bus Driver Inservice
1 Permits, Licenses and Inspections Regional Project Introductions: Home Builders & Remodelers Association of Cape Cod State Project Sponsor & Technical.
1 MyLicense Log in/Register Login to the MyLicense application with an existing User Account. OR Create a new User Account with the Register link at the.
1 Value Stream Mapping: Future State (Current Permitting Process) Joanna French October 26, 2006.
1. The applicant, as an alternative to submitting applications in the usual manner in the concerned office, can submit the application to a CHO i CE Agent.
OPT Workshop RIT International Student Services Spring Semester, 2015.
Bureau of Land Management John Mann, P. E. Assistant State Engineer November 16-17, 2010 Bureau of Land Management John Mann, P. E. Assistant State Engineer.
New Form Approval Process. Background New Process is effective April 1, 2014 Changes Chapter 4 in the Library Manual (the reissued 2014 manual will be.
Utah Division of Water Rights Blake W. Bingham, P.E. Adjudication Program Manager Utah’s Perspective on Forfeiture and Abandonments.
HL7 Registration of Terminology Systems (Proposal)
United Nations Procurement Division
Cost Policy Training Sponsored Project Training Program April 30, 2012 Beverly Blakeney & Jennifer Gagnon April 30, 2012Sponsored Project Training Program1.
Public Water Supplier Considerations Rural Water Association of Utah April 25, 2013 April 25, 2013 Utah Division of Water Rights Kirk Forbush, P.E. Regional.
Surveying principles 1 Public Water Suppliers S. Ross Hansen P.E., L.S. Region Engineer 4/10/2014 Rural Water Certification Class.
Division of Water Rights WaterRights.utah.gov. Proof of Beneficial Use of Water (proof) Frank Quintana, P.E. Thursday, April 25 th, 2013.
1 Water Right Conveyances Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March.
Year Two Teachers Mentoring and Induction License information.
HIPAA PRACTICAL APPLICATION WORKSHOP Orientation Module 1B Anderson Health Information Systems, Inc.
Declaring Beneficial Use in Water Use Groups R
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Letters of Permission Ontario Regulation 142/08 (Letters of Permission) and Applications for Letters of Permission Policy/Program Memorandum 147 Teaching.
WATER RIGHT CURRENTS Utah Division of Water Rights September 2009.
BENEFICIAL USE Declarations & Apportionment Water Rights Addenda Passed in 2010; effective Applies to deeds that – Convey fee simple.
Water Rights Training for Proof Professionals June 1, 2009 Salt Lake City.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) April 2013.
Water Right Issues of the State Engineer Utah Water Users Workshop March 17, 2015 Kent L. Jones, P.E. State Engineer.
Water Use Groups Rural Water Association of Utah Water Rights Certification Training April 10 – 11, 2014.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March 2012.
Water Right Transfers OAR Chapter 690 Divisions 380, 382, 385, 77 CWRE Workshops – October, 2012 Susan Douthit District Analyst.
Declaring Beneficial Use in Water Use Groups R
Municipal Water Rights…… Water Law & Policy Seminars March 12, 2012 Kent L. Jones, P.E. State Engineer.
Weber / Western Region Update for Title Professionals Vance Twitchell Assistant Regional Engineer April 20, 2011.
Water Rights Website (Toolshed Tour) RWUA Water Rights Workshop April 29, 2008
Upper Colorado River Basin Current Policy and Issues Utah Division of Water Rights September 2009.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Legal Status Task Force Report CWS/4/8, CWS/4 BIS/5 Geneva, Switzerland March 2016 Young-Woo YUN Head, Standards Section.
Supplier Corrective Action Request (SCAR) Supplier Training
Utah Division of Water Rights June 21, 2004 From Application to Certification Clark Adams--April 2016 The Application Process.
Intellectual Property Office is an operating name of the Patent Officewww.ipo.gov.uk UK EXAMINATION SYSTEM: RELATIVE GROUNDS EXAMINATION Mark Jefferiss.
Explorer Post Renewal Instructions
Chapter 6 – Cash Control Systems
End User Process Help - (Canada)
End User Process Help - (Canada)
Utah Division of Water Rights
Lesson 1-4 Preparing a Chart of Accounts
Chapter 6 Cash Control System.
STEM OPT Extension Tutorial
Annual Attachment O Stakeholder Meeting
Annual Attachment O Stakeholder Meeting
Annual Attachment O Stakeholder Meeting
Presentation transcript:

Presented by: Judy Ausick April 24, 2012 Rural Water Users’ Training

Supplemental Water Rights Declaration of Beneficial Use How to Fill Out the Form Problems Completing the Declaration

 When more than one water right provides water to a single use  Together the water rights are “supplemental”

WR #1 WR #2 WR #3

30 ACRES 15 ACRES 55 ACRES

Total Acres = 55 acres NOT = 100 acres ( ) 55 ACRES

 A DOBU, may declare the beneficial use amount of one or more water rights in a water use group.  Water right owners must quantify, by agreement, the beneficial use for each water right within the Water Use Group.

 Rule R  Enacted April 7, 2010

 Identify the water use group to be clarified  Have all interested owners agree to a specific water use for each water right  All owners must sign the form

 The Regional Office will evaluate the request for consistency with the State Engineer’s records.  The database will be updated.  A memo to file and any supporting documents, indicating the uses will be scanned and placed on the water right file.

 If the applicant has exhausted all reasonable efforts without successfully completing a DOBU.  The applicant may request the State Engineer to apportion the beneficial uses in the water use group.  Complete the “Apportionment of Beneficial Use Amounts” form and supply supporting documents.

 A Change Application, Segregation, Proof of Beneficial Use, Title update or other administrative action involving a group may need to be defined before action can be taken by the state engineer.  ANY QUESTIONS?

Background for Extensions Finding the Extension Form Lapsing Notices Extensions Beyond 50 years/40-year plan

 Requests for extension of time must be submitted in the office on or before the proof due date. › Post marked envelopes are not acceptable and maybe viewed as lapsed.  The State Engineer can extend the time for the applicant to submit proof before 50 years if the applicant shows reasonable and due diligence in completing the appropriation or show reasonable cause for delay.

 Before 14-year requires a $50.00 filing fee  After 14-year requires a $ filing fee › Statute requires advertising in the local newspaper as well as a 20-day protest period before action can be taken.

 Enter Water Right, Change, or Exchange Number  Answer questions  Generate form  Print and sign  Filing fee

 If a Water Right, change, or exchange has lapsed, the applicant will have 60- days from the date of the lapsing letter to reinstate the right.

 Applies to Public Water Suppliers or Wholesale Electrical Cooperatives ONLY  Statute requires a 40-year plan to be submitted with an extension request

 It is recommended by the state engineer that this information should be prepared under the direction of a licensed engineer.  It should be comprehensive in nature and describe all projected uses and sources of water available.