Jenny Linnerud, 27/10/2011, Cologne1 ESSnet CORE Common Reference Environment ESSnet workshop in Cologne 27th and 28th of October 2011.

Slides:



Advertisements
Similar presentations
National Institute of Statistics, Geography and Informatics (INEGI) Implementation of SDMX in Mexico.
Advertisements

1 The ESSnet project GEOSTAT Vilni Verner Holst Bloch Coordinator of ESSnet project GEOSTAT 1A Statistics Norway Representing Census data in a European.
Using UML, Patterns, and Java Object-Oriented Software Engineering Royce’s Methodology Chapter 16, Royce’ Methodology.
ESSnet on Small Area Estimation Stefano Falorsi ISTAT International conference on Indicators and Survey Methodology, 2010, Wien
1 CES IASSIST 2002, June 2002 University of Connecticut MetaNet: Standardising Statistical Metadata Methodology Karen Brannen University of Edinburgh,
International Seminar on Modernizing Official Statistics:
ESSnet on SDMX phase II Dario Camol
CORE: a concrete implementation of the CSPA architecture Marco Silipo ISTAT (Italian National Statistical Institute) Joint work with: Rolando Duma, Mauro.
Decentralised and Remote Access to Confidential Data in the ESS (ESSnet DARA) Overview and State of the Art Maurice Brandt Destatis FIRST EUROPEAN DATA.
Qatar Planning Council 1 Best Statistical Information to Support Qatar’s Progress Statistical Capacity Building for Information Society in Qatar.
ESS-VIP ICT Project ESSnet Workshop, Rome, 3-4 December 2012.
1 The GEOSTAT project Vilni Verner Holst Bloch MSc. landscape ecology and natural resources Statistics Norway Otervegen 23 N Kongsvinger Tel : ++47.
Cooperation based on the GSBPM Max Booleman (Statistics Netherlands) and Jenny Linnerud (Statistics Norway)
CORE Rome Meeting – 3/4 October WP3: A Process Scenario for Testing the CORE Environment Diego Zardetto (Istat CORE team)
VSS supports knowledge management Knowledge based organizations and improving the absorption capacity.
Donatella Fazio BLUE-ETS project coordinator Maria Grazia Calza BLUE-ETS senior researcher ISTAT BLUE-ETS BLUE – Enterprise and Trade Statistics 2012 ESSnet.
Introduction and key issues identified in the papers UNECE Conference of European Statisticians June 2015 Second Seminar, Session I.
Vincenzo Del Vecchio Banca d’Italia Statistics Collection and Processing Department 2012 ESSnet Workshop – 4 December.
ESSnet Workshop Rome December Rome 2012 Memobust: harmonisation and integration issues Rob van de Laar Division of Process development, IT and Methodology.
CASE STUDY: STATISTICS NORWAY (SSB) Jenny Linnerud and Anne Gro Hustoft Joint UNECE/Eurostat/OECD work session on statistical metadata (METIS) Luxembourg.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
11 CORE Architecture Mauro Bruno, Monica Scannapieco, Carlo Vaccari, Giulia Vaste Antonino Virgillito, Diego Zardetto (Istat)
ESS-net DWH ESSnet DWH - Metadata in the S-DWH Harry Goossens – Statistics Netherlands Head Data Service Centre / ESSnet Coordinator
Eurostat The impact of the Memobust project results.
The MEMOBUST project Ágnes Andics EESW Nürnberg 1.
Explaining the statistical data warehouse (S-DWH)
Luxembourg January CORE ESSnet (COmmon Reference Environment) final meeting Carlo Vaccari Istat - Italy.
1 The ESSnet project GEOSTAT 1A/B Vilni Verner Holst Bloch Coordinator of ESSnet project GEOSTAT 1A Statistics Norway Representing Census data in a European.
1 ESSnet on Small Area Estimation Stefano Falorsi Istat
1-2 Training of Process Facilitators 3-1. Training of Process Facilitators 1- Provide an overview of the role and skills of a Communities That Care Process.
The Memobust Handbook on Methodology for Modern Business Statistics Sander Scholtus Rob van de Laar Leon Willenborg
Systems Analysis and Design in a Changing World, Fourth Edition
ESSnet Workshop Cologne 2011 ESSnet on measuring global value chains.
GREG CAPPS [ ASUG INSTALLATION MEMBER MEMBER SINCE:1998 ISRAEL OLIVKOVICH [ SAP EMPLOYEE MEMBER SINCE: 2004 GRETCHEN LINDQUIST [ ASUG INSTALLATION MEMBER.
© Federal Statistical Office, Research Data Centre, Maurice Brandt Folie 1 ESSnet Projects “Decentralised Access to EU microdata” Maurice Brandt Research.
United Nations Economic Commission for Europe Statistical Division High-Level Group Achievements and Plans Steven Vale UNECE
CORE Final Meeting – 11 January CORE Demo Scenario Diego Zardetto, Istat & CBS CORE team.
Me thodology for mo dern bu siness st atistics = Memobust Leon Willenborg (Statistics Netherlands)
Background Nature and function Rationale Opportunities for TB control Partnering process.
Workshop: RIA for Prime Ministry Experts 13 October 2009 EuropeAid/125317/D/SER/TR Session 3 RIA Consultation for Public Sector and Government.
Budapest Benefits of sharing good practices with other NSI’s - from the perspective of a new EU member state Marko Krištof – Director General.
ESS-net DWH ESSnet on microdata linking and data warehousing in statistical production Harry Goossens – Statistics Netherlands Head Data Service Centre.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
1 CORE Bringing the GSBPM to life! J. Linnerud & J.-P. Kent.
ESS-net DWH ESSnet on microdata linking and data warehousing in statistical production.
On Implementing CSPA Specifications for Editing and Imputation Services Donato Summa, Monica Scannapieco, Diego Zardetto, Istat, Italy Istituto Nazionale.
Harry Goossens Centre of Competence on Data Warehousing.
Final Presentation, European Cooperative House Brussels, 16 Dec.2009 Training +45 “Teachers Facilitating Learning among Elders” WP5 Test and Evaluation.
Carlo Vaccari – ITDG 2010 Luxembourg1 CORA ESSNet final results.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
Adopting CSPA and CORE in Istat: the role of Enterprise Architecture Mauro Bruno, Monica Scannapieco, Marco Silipo Istituto Nazionale di Statistica - Istat.
Carlo Vaccari – CORA final meeting1 CORA ESSNet final results.
Plan and Safeguard Service Package for SAP S/4HANA
The ESS vision, ESSnets and SDMX
(COmmon Reference Environment)
Eurostat D2 – Regional Indicators and Geographical Information
ESSnet on SDMX phase II Laura Vignola
Management Group on Statistical Cooperation
OBJECT-ORIENTED APPROACH TO OFFICIAL STATISTICS
Essnet on Methodology for Modern Business Statistics
ESSnet Training General Introduction P. Jacques
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
ESSnet Projects P. Jacques
X-DIS/XBRL Phase 2 Kick-Off
CORA ESSNet COmmon Reference Architecture starting ...
The basics ESSnet on SDMX prepared in 2008/2009
SOA initiatives at Istat
COmmon REference Environment - CORE:
GISCO working group meeting 2015
ESSNet SERV 2 Implementing Shared SERVices
Presentation transcript:

Jenny Linnerud, 27/10/2011, Cologne1 ESSnet CORE Common Reference Environment ESSnet workshop in Cologne 27th and 28th of October 2011

Jenny Linnerud, 27/10/2011, Cologne2 Background The ESSnet CORE (COmmon Reference Environment) continues the work of a previous 10 month ESSnet called CORA (COmmon Reference Architecture). CORA produced the definition of an architectural model together with proof-of-concept software prototypes.

Jenny Linnerud, 27/10/2011, Cologne3 Duration & Participants The duration of the ESSnet CORE is 10 months (dec 2010 – Jan 2012) and it involves Istat (Italian National Institute of Statistics) as coordinator, INSEE (Statistics France), CBS (Statistics Netherlands) SSB (Statistics Norway), INE (Statistics Portugal) and SCB (Statistics Sweden), as participants.

Jenny Linnerud, 27/10/2011, Cologne4 Overview of the presentation Project oriented 1. A brief explanation of objectives to be achieved. 2. What are main achievements/results which prove the benefit of the ESSnet approach (or show the contrary) 3. What are critical success/fail/hampering factors? 4. What should be the next developments to be launched in the coming years in the project's area ESSnet oriented 1. What could contribute to improvement of the functioning of ESSnets 2. Why is the ESSnet the proper organizational form to achieve the proposed objectives 3. How the ESSnet concept can be developed further

Jenny Linnerud, 27/10/2011, Cologne5 Project oriented A brief explanation of objectives to be achieved Environment for the definition and execution of statistical processes – Definition of a process in terms of services selected by an available repository – Execution of the composed workflow

Jenny Linnerud, 27/10/2011, Cologne6 Project oriented What are main achievements/results which prove the benefit of the ESSnet approach (or show the contrary) CORE goes in the direction of fostering the sharing of tools among NSIs. - A tool developed by a specific NSI can be wrapped according to the extended CORA model (e-CORA) and thus easily integrated within a statistical process of another NSI. -Having a single environment for the execution of entire statistical processes can provide a high level of automation in process execution.

Jenny Linnerud, 27/10/2011, Cologne7 Deliverables Information Model Requirements Generic statistical information model Mapping methodology Selected case studies Technical Environment Specifications vs1, vs2 Lessons learned on the use of SDMX within data processing Evaluation grid used to evaluate different process management tools. Recommendations on process management tools. Description of CORE implementation in.NET and in Java CORE implementation in.NET and in Java Integration Cost Reporting

Jenny Linnerud, 27/10/2011, Cologne8 Process scenario for testing START Compute Strata Statistics Allocate the Sample Select the Sample Compute Estimates and Sampling Errors Calibrate Survey Data Collect Survey Data Check and Correct Survey Data Store Estimates and Sampling Errors Convert to SDMX STOP ALLOCATION ESTIMATION

Jenny Linnerud, 27/10/2011, Cologne9 Project oriented What are critical success/fail/hampering factors? People from different countries need to work closely together in order to ensure the achievement of the project’s objectives, establishing a common language and exchanging knowledge and expertise. Risks identified under planning: 1.Withdrawal of a key partner 2. WP/tasks leader changes 3. Project execution risks - delays and dependencies 4. Agreement risks

Jenny Linnerud, 27/10/2011, Cologne10 Dependencies

Jenny Linnerud, 27/10/2011, Cologne11 Project oriented What should be the next developments to be launched in the coming years in the project's area Scheduled: Testing data and service integration issues with concrete implementations Delivery a proof-of-concept software prototype of CORE Usage of CORE in a representative statistical production process Possible future work: Detailed technical requirements for a professional implementation of CORE Professional implementation of CORE Usage of CORE in real statistical production processes

Jenny Linnerud, 27/10/2011, Cologne12 ESSnet oriented What could contribute to improvement of the functioning of ESSnets Further reduce the administration

Jenny Linnerud, 27/10/2011, Cologne13 ESSnet oriented Why is the ESSnet the proper organizational form to achieve the proposed objectives Focuses on issues that answer to a European interest: Stronger cooperation between European NSIs, sharing of solutions and improvement of existing solutions will result in turn result in more effective and harmonised statistical processes at the European level. Starting from the diversity of the ways in which statistics are produced in the European NSIs, the main focus of CORE is the implementation of a reference architecture for both the business and technical aspects of the NSIs’ statistical production.

Jenny Linnerud, 27/10/2011, Cologne14 ESSnet oriented Why is the ESSnet the proper organizational form to achieve the proposed objectives Cost effectiveness: ESSnets can build on existing approaches, methods and experiences of the participating NSIs, who are often already trying to rationalize and harmonize their statistical processes for internal purposes. The main objective of CORE is to bring together these efforts, to produce a common reference environment, with the aim of minimizing duplications and maximizing cost-effectiveness.

Jenny Linnerud, 27/10/2011, Cologne15 ESSnet oriented How the ESSnet concept can be developed further Increase ESSnet training courses Continue to have ESSnet workshops Improve the possibilities to update the ESSnet website