Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.

Slides:



Advertisements
Similar presentations
The Unit Owners Association of the Madison, A Condominium Building Revitalization (Work Completed & Upcoming Work)
Advertisements

Construction Industry
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
Capital Improvement Task Force Update
St Swithun’s Open Meeting 30 th June What is the state of the church? ( Hint, look around you) The architect’s report identified some urgent issues.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
o Why are we meeting?  Repair of steeple o Current problems o Recent history of repairs o Why must steeple be repaired? o Where do we go from here? o.
PUR Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”
What Is EIFS Exterior Insulation and Finish Systems (EIFS) is a multi-layered exterior wall system that is composed of foam board insulation that.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
Jason A. Coffin, CFEI, CVFIOCIFire.com Marcus O. Durham, PhD, PEThewayCorp.com Robert A. Durham, PhD, PEThewayCorp.com.
Developing a Strategic Inventory Management Program Panel: Gil Carlson, Unirisc Cindy Mulhall, Encana Julie O’Halloran, Canadian National Railways Barb.
Objectives : ANALYZE home maintenance techniques.
Southeastern OSHA Training Institute Education Center Fall Prevention in the Construction Industry 29 CFR 1926: Subpart M.
Curb Appeal: Small Investments with Attractive Returns August 21,2014.
The general design concept A new sanctuary at the East end of our campus A lower level beneath that sanctuary Renovations to the existing West wing to.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
PASSIVE SOLAR DESIGN. Design Techniques
3. The Roof Has Problems If the roof has water damage, it may be caused by old or damaged shingles, or improper flashing. It's cheap and relatively easy.
Company Profile. EMPIRE SOLUTIONS EXPERIENCE With more than 10 years of experience dedicated to the roofing, energy conservation, corrosion control, painting.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Proposal For Fire Station No. 2 Presented to: Lawrence City Commission April 11, 2006.
Meg Thornton/IMPC-FWA-PWE/(907) 11/04/2008 UNCLASSIFIED 1 OF 18 Army Cost Analysis for Stabilization and Demolition of.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
BOND REFERENDUM PRESENTATION EASTCHESTER SCHOOL DISTRICT Dr. Walter Moran Superintendent of Schools.
Objective 9.01: EXPLAIN the benefits of interior home care.
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
10/19/20151 Building a Legacy Rebuilding Providence Public Schools 2008 Q1 Report Volume III.
Freeman Athletic Center – Bacon Fieldhouse – North Elevation Scope, Typical for north, south and west elevations: Remove all existing horizontal and vertical.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
Light Search and Rescue Operations CERT Basic Training Unit 5.
Cladding attachment.
Competency: Draw exterior elevations
Inspection photo requirements Following this procedure will ensure that you get paid for the work completed. All rights to this document are reserved by.
9.02 Exterior Maintenance and Cleaning. Roof, Gutters, Downspouts Check roof for leaves and twigs as they contribute excess moisture that can cause rot.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Stone Avenue Train Station Renovation Project Board Workshop June 7, 2010.
Address: East 23rd St. S Independance, MO Phone: Fax:
BOMES THEATER INFORMATIONAL MEETING Department of Planning & Development City of Providence October 24, 2013.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Chimney Repointing Services - Timber Hawk Home Builders
Exterior Maintenance and Cleaning
City of Charlottesville
Education and Training.. Education and Training.
The journey so far… Over the past few years the congregation, council, and building committee have been thinking about the physical structure of our church.
Jefferson County SA Red Rocks Site Approval
Big French Creek Slide Timeline of Events
Fall 2017 Update: Physical properties and sinking fund
Stained Glass Window Restoration Project
Objectives : ANALYZE home maintenance techniques
Objectives : ANALYZE home maintenance techniques
College II Tank Interior Recoating Award of Construction Contracts
Condominiums Association
Competency: Draw exterior elevations
Thank you to our Sponsors
Steam Plant Rehabilitation Building and Smokestack
Minuteman Vocational Technical Regional High School Progress
Facilities Projects Update
2007 Hurricane Season Preparedness Briefing
Mount Vernon Community School
Minuteman Vocational Technical Regional High School Progress
Exterior Maintenance and Cleaning
The projects in the following pages have been identified by our Building & Grounds Commission made up of local architects, engineers, contractors and finance.
Presentation transcript:

Informational Meeting

The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior to that was done in 1961 The worst damage is visible in the north and east faces Water freely penetrates when it rains (more than 700 gallons of water were collected in the severe storms in April 2010) Exterior bricks have loosened to a dangerous level

Water damage is starting to impact inside of building, as visible in the Narthex and Balcony An untenable maintenance problem for our Property Manager and a potential safety issue.

Major work to be done on exterior Re-point all four facings of the upper section. Re-point 100% of the north and east facings of the lower section and 20% of the south and west facings. Knee wall on east side Additional options being considered Re-point 100% of all sections on all facings vs. only the 20%. Install new lead flashing along sanctuary roof knee. Apply masonry sealant to all of the re-pointed surfaces. Repair interior walls. Repaint and caulk all louvers, windows and wood trim.

Other considerations Furnish and install all scaffolding, protection materials, debris netting, etc. Remove materials periodically to keep area safe. All surfaces will be washed down upon completion. All work will be done in accordance with industry standards and OSHA safety requirements.

Working with the Board of Elders and Property Manager; Art Middleton is serving as Project Manager. Art has obtained three qualified bids from three qualified masonry restoration contractors. The proposals are being analyzed and compared for compliance with our proposed Scope of Work. A contractor recommendation will be made to the Congregation next week. The proposals range in cost from approximately $114k to $140k

August 22 and August 29 – Informational meetings September 19 – Congregational Meeting and vote to approve the plan October 17 – Pledge cards distributed October 24 – Bell Tower Pledge Day