Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Slides:



Advertisements
Similar presentations
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Advertisements

Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
ACCOUNTING INFORMATION SYSTEMS
MODERN AUDITING 7th Edition
© Copyright 2011 John Wiley & Sons, Inc.
MEM 612 Project Management Chapter 3 Planning the Project.
Introduction to Information Technology, 2nd Edition Turban, Rainer & Potter © 2003 John Wiley & Sons, Inc Introduction to Information Technology.
Chapter 18: Controlling – Processes and Systems
Chapter 101 Information Technology For Management 6 th Edition Turban, Leidner, McLean, Wetherbe Lecture Slides by L. Beaubien, Providence College John.
MEM 612 Project Management
Chapter 171 Stabilizing the Quality System Chapter 17 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published by.
Evaluating and Terminating the Project
Chapter 8 Evaluating and Terminating the Project
Managerial Accounting by James Jiambalvo Chapter 1: Introduction to Managerial Accounting Slides Prepared by: Scott Peterson Northern State University.
Management, 6e Schermerhorn Prepared by Cheryl Wyrick California State Polytechnic University Pomona John Wiley & Sons, Inc.
Management, 6e Schermerhorn Prepared by Cheryl Wyrick California State Polytechnic University Pomona John Wiley & Sons, Inc.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design Copyright 2000 © John Wiley & Sons, Inc. All rights reserved. Slide 1 Systems.
Information Technology Project Management
Information Technology Project Management by Jack T. Marchewka Power Point Slides by Jack T. Marchewka, Northern Illinois University Copyright 2006 John.
Systems Analysis and Design with UML Version 2
“Copyright © 2001 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
Organizing Projects Text by Stanley E. Portny, Samuel J Mantel, Jack R. Meredith, Scott M. Shaffer, Margaret M. Sutton with Brian Kramer. PowerPoints by.
Defining Project Management Today Text by Stanley E. Portny, Samuel J Mantel, Jack R. Meredith, Scott M. Shaffer, Margaret M. Sutton with Brian Kramer.
Chapter 31 The Value of Implementing Quality Chapter 3 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published.
MODERN AUDITING 7th Edition Developed by: Gregory K. Lowry, MBA, CPA Saint Paul’s College John Wiley & Sons, Inc. William C. Boynton California Polytechnic.
Chapter 7 The Project Schedule and Budget Copyright 2012 John Wiley & Sons, Inc. 7-1.
Chapter 101 The Design Process Chapter 10 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published by John Wiley.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.4-1.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 13 – Project Termination.
Chapter 111 Information Technology For Management 6 th Edition Turban, Leidner, McLean, Wetherbe Lecture Slides by L. Beaubien, Providence College John.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
Chapter 16 Information and Operations Management 1e Management 1e - 2 Management 1e Learning Objectives  Explain how managers use controls.
1 Evaluating and Terminating the Project Key Concepts EvaluationMeasurement Auditing the Project.
Information Technology Economics
© 2007 John Wiley & Sons Chapter 15 - Organizational Issues PPT 15-1 Organizational Issues Chapter Fifteen Copyright © 2007 John Wiley & Sons, Inc. All.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
2 - 1 Introduction to US Health Care Text by Dennis D. Pointer, Stephen J. Williams, Stephen L. Isaacs & James R. Knickman with Tracy Barr PowerPoints.
Involving the Right People In Projects Text by Stanley E. Portny, Samuel J Mantel, Jack R. Meredith, Scott M. Shaffer, Margaret M. Sutton with Brian Kramer.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.1-1.
MEM 612 Project Management Chapter 7 Monitoring and Controlling the Project.
MODERN AUDITING 7th Edition Developed by: Gregory K. Lowry, MBA, CPA Saint Paul’s College John Wiley & Sons, Inc. William C. Boynton California Polytechnic.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation Alan Dennis, Barbara.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation Alan Dennis, Barbara.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Project Management in Practice
Project Management in Practice, Fourth Edition
Copyright 2012 John Wiley & Sons, Inc. Chapter 12 Project Auditing.
Information Technology Project Management – Fourth Edition By Jack T. Marchewka Northern Illinois University Power Point Slides by Gerald DeHondt Grand.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.2-1.
Chapter 9 Substantive Procedures and the Financial Statement Audit Prepared by Richard J. Campbell Copyright 2011, Wiley and Sons.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 10 Supplement Roberta.
Project Management in Practice Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
I- 1 Prepared by Coby Harmon University of California, Santa Barbara Westmont College.
A- 1. A- 2 Appendix B Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
K-1. K-2 Appendix K Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
Slide 11-1 Chapter 11 Terms Information Resource Management Strategies Introduction to Information Systems Judith C. Simon.
I-1. I-2 I ACCOUNTING FOR SOLE PROPRIETORSHIPS Accounting, Fifth Edition.
H-1 Prepared by Coby Harmon University of California, Santa Barbara Westmont College.
“Copyright © 2001 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
Chapter 41 People and Quality Chapter 4 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published by John Wiley.
The Project Schedule and Budget
Evaluating and Terminating the Project
liquidation of a partnership.
Accounting Information Systems: Essential Concepts and Applications Fourth Edition by Wilkinson, Cerullo, Raval, and Wong-On-Wing Module 1: Decision Making,
The Production Process
Systems Analysis and Design with UML Version 2
Project Management in Practice Second Edition
MACROECONOMICS AND THE GLOBAL BUSINESS ENVIRONMENT
Information Technology Project Management
Presentation transcript:

Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1 Mantel, Meredith, Shafer, and Sutton Copyright  John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information herein. 8 – Evaluating and Terminating the Project

 Appraises the progress and performance of the project relative to (a) the goals and objectives set for it during the selection process and (b) the initial or revised plan.  Projects should be evaluated at key points in the project life cycle.  Purpose is to improve process of carrying out future projects. Copyright 2007 John Wiley & Sons, Inc.8-2

 Original criteria for selecting and funding project  Success to date  Business/Direct Success such as the level of commercial success for external projects and reduced throughput time for internal projects  Future Potential  Contribution to Organization’s Goals  Contribution to Team Member Objectives Copyright 2007 John Wiley & Sons, Inc.8-3

 Measuring performance against planned budgets and schedules relatively straightforward  Measurement of actual expenditure and earned values more complicated Copyright 2007 John Wiley & Sons, Inc.8-4

 The timing of the audit depends on the purpose  An audit can be conducted at three levels: general detailed technical Copyright 2007 John Wiley & Sons, Inc.8-5

 Familiarize audit team with requirements of project  Conduct audit on site  Write up audit report  Distribute report Copyright 2007 John Wiley & Sons, Inc.8-6

 Audit team must Have free access to anyone with knowledge of the project Make sure the project team is aware of the audit Avoid judgmental comments Understand the politics of project team Confirm all information ( wherever possible) Understand that project team members rarely trust auditors Copyright 2007 John Wiley & Sons, Inc.8-7

 Introduction description of project and its goals  Current Status comparison of work completed and planned  Future Project Status conclusions regarding project progress recommendations for changes for subsequent projects Copyright 2007 John Wiley & Sons, Inc.8-8

 Critical Management Issues issues senior management should monitor  Risk Analysis and Risk Management potential for project failure and monetary loss  Final Comments caveats, assumptions, limitations Copyright 2007 John Wiley & Sons, Inc.8-9

 Sunk Cost - The extent to which the organization is willing to invest the additional time and cost required to complete the project given the investment already committed  The degree to which the project qualifies against a set of factors associated with success or failure Copyright 2007 John Wiley & Sons, Inc.8-10

 Project Extinction project activity suddenly stops or has successfully completed or has a high expectation for failure  Termination by addition when an in-house project is successfully and is institutionalized as a new formal part of the organization  Termination by integration the output of the project becomes a standard part of the operating system of the sponsoring firm or the cli ent  Termination by starvation occurs when it is impolitic to terminate a project but it’s budget can be squeezed, as budgets always are, until it is a project in name only Copyright 2007 John Wiley & Sons, Inc.8-11

 Decision should be made by a broad based committee of senior managers  Termination process should be specified in project plan  A termination manager should be appointed Copyright 2007 John Wiley & Sons, Inc.8-12

Copyright 2007 John Wiley & Sons, Inc.8-13

 Project Performance what was achieved and reasons for resulting performance  Administrative Performance review of how well administrative practices worked  Organizational Structure identify modifications to help future projects  Project Management Techniques recommendations for improvements in future projects Copyright 2007 John Wiley & Sons, Inc.8-14 Any ?s