M4 - 1 BU ILDING STRONG SM Multi-Purpose Projects Module M4: Telling the Plan Formulation Story.

Slides:



Advertisements
Similar presentations
Critical Reading Strategies: Overview of Research Process
Advertisements

Module 2 Sessions 10 & 11 Report Writing.
Identify Problems, Planning Objectives and Constraints.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
F4B - 1 BU ILDING STRONG SM Flood Damage Reduction Module F4: Reformulation – Optimization, Incremental Analysis and Selection of the NED Plan.
F1B - 1 BU ILDING STRONG SM Flood Risk Management Module F1: Authorities and Policies.
The Systems Analysis Toolkit
Screen 1 of 24 Reporting Food Security Information Understanding the User’s Information Needs At the end of this lesson you will be able to: define the.
Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved. Business and Administrative Communication SIXTH EDITION.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Reviewing the work of others Referee reports. Components of a referee report Summary of the paper Overall evaluation Comments about content Comments about.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
Technical Writing Function. The purpose of having guidelines is to make the document more readable. Standard guidelines govern – Format – page layout,
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
REPORT WRITING AND COST ESTIMATING CE 3372 Lecture 09.
Draft RMP/EIS. Objectives Write a draft land use plan and EIS. Issue a draft land use plan and EIS for public review.
©2015, College for Financial Planning, all rights reserved. Session 16 From Recommendations to Monitoring – Sample Presentation & Client Communication.
1 Building Strong! THE ECONOMIST’S ROLE Ken Claseman Senior Policy Advisor for Economics Office of Water Project Review HQUSACE
Ecosystem Restoration Module ER4: Cost Effectiveness/Incremental Cost Analysis and the NER Plan BU ILDING STRONG SM.
SMART Feasibility Study Process
#AIEC2015 PowerPoint Template and Guidelines Screen ratio: 16:9.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
BUILDING STRONG SM Plan Formulation: General Module G-1: What is plan formulation?
IENG 471 Facilities Planning
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Lecture for Senior Design Classes By Dr. Pam Estes Brewer Associate Professor, TCO Mercer University School of Engineering Brewer (Adapted from presentation.
Designing Written Reports Presentation for Senior Design Classes by Dr. George Hayhoe Professor, Technical Communication Mercer University School of Engineering.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
1 VLGAA Telling Your Story Measure What You Manage thru Performance Reporting Julie V. Bryant, MBA, CPA, CGFM AGA: Director of Performance Reporting May.
Civil Works Transformation Foundations of SMART Planning
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
Project Report. Suggested TOC Executive Summary Project Background and Assumptions Vision and Mission Statements Objectives SWOT Analysis Recommended.
INFO 424 Team Project Practicum Week 2 - Launch report, Project tracking, Review report Glenn Booker Notes largely from Prof. Hislop.
16-1 Chapter 16 Analyzing Information & Writing Reports   Analyzing Data   Choosing Information   Organizing Reports   Seven Organization Patterns.
6/3/2016 IENG 471 Facilities Planning 1 IENG 465 – Final Design Project Report & Presentation Requirements.
US Army Corps of Engineers BUILDING STRONG ® Planning Products & Milestones Planning Principles & Procedures – FY11.
IS Analysis and Design. SDLC Systems Development Life Cycle Break problems into management review stages Control cost and time Works best with well understood.
Learning Objectives Copyright © 2004 John Wiley & Sons, Inc. Communicating the Research Results CHAPTER Fourteen.
Chapter Fourteen Copyright © 2006 John Wiley & Sons, Inc. Communicating the Research Results.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Chapter Fourteen Communicating the Research Results and Managing Marketing Research Chapter Fourteen.
Harbors Module NH3: Formulation – Measures, Strategies and Plans.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
BUILDING STRONG ® TELLING THE PLANNING STORY Planning Principles & Procedures – FY11.
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
CE 3372 WATER SYSTEMS DESIGN Lecture 09: Report writing and cost estimating.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® U.S. ARMY CORPS OF ENGINEERS CIVIL WORKS TRANSFORMATION: SMART PLANNING AND RESCOPING CHARETTES.
10 Informal Reports.
1 Module 8 Reporting Results. 2 Learning Objectives At the end of this session participants will:  Understand key points to effectively present results.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
2/27/2016 IENG 471 Facilities Planning 1 IENG 464 – Conceptual Design Project Report & Presentation Requirements.
US Army Corps of Engineers BUILDING STRONG ® Step 6: Selection Of The Recommended Plan Planning Principles & Procedures – FY11.
CONVEYING PRIORITIES THROUGH POLICY BRIEFS This session will cover: 1.The purpose of policy briefs 2.Understanding the audience 3.Characteristics of policy.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Information Systems Project Management
Working in Groups in Canvas
Presenter Name Presentation Date
Proposals and Progress Reports
Presenter Name Presentation Date
Report Writing.
Presenter Name Presentation Date
Classified Evaluation System
Presenter Name Presentation Date
Chapter 21 Formal Reports
Classified Evaluation System
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
Presenter Name Presentation Date
Presenter Name Presentation Date
Presentation transcript:

M4 - 1 BU ILDING STRONG SM Multi-Purpose Projects Module M4: Telling the Plan Formulation Story

M4 - 2 BU ILDING STRONG SM Student Learning Objectives The Student will be able to:  Identify a report’s audience.  To list some characteristics of a GREAT report.

M4 - 3 BU ILDING STRONG SM TELLING THE PLAN FORMULATION STORY  When you “finish” Plan Formulation and Select the “Recommended Plan”, Your Job’s Still Not Done  If You Produce a Good Report That Clearly lays out what you did, You make it much easier for the decision makers to agree and support the recommendation

M4 - 4 BU ILDING STRONG SM TELLING THE PLAN FORMULATION STORY  You must be able to clearly relate:  Who?  What?  Where?  When?  Why?  How?

M4 - 5 BU ILDING STRONG SM TELLING THE PLAN FORMULATION STORY  Audience  Content

M4 - 6 BU ILDING STRONG SM WHO READS THE REPORT?  Who’s your intended audience?  Who really reads the entire report?  What are important sections of the report?

M4 - 7 BU ILDING STRONG SM WHO’S YOUR INTENDED AUDIENCE?  Project Delivery Team, Vertical Team, and the Sponsor  Independent Technical Reviewers  Stakeholders, Publics, Agencies, Groups, Tribes, etc.  Higher Authority—MSC‘s & HQ  ASA(CW), OMB, Congress  Others, such as Individuals

M4 - 8 BU ILDING STRONG SM WHAT ARE THE CONCERNS OF READERS?  PDT, VT, Sponsor — Report & EIS that Leads to Project Implementation  IT Reviewers — Portions Dealing with Their Technical Expertise  Stakeholders -- Portions Dealing with Their Concerns  Publics — Recommended Plan & Adverse Impacts of Interest to Them  Agencies — Impacts on Resources Under their Authority  Groups — Impacts on Factors of Concern to Them

M4 - 9 BU ILDING STRONG SM WHAT ARE THE CONCERNS OF READERS?  Tribes — Impacts on Resources Affecting Tribal Land and Activities  Corps Higher Authority — Compliance with Applicable Laws and Policies  ASA(CW) and Office of Management & Budget — Compliance with the Program of the President  Congress — Helping Constituents Solve Their Water Resources Problems  Others — such as Individuals With Personal Interests

M BU ILDING STRONG SM WHAT ARE IMPORTANT PARTS OF THE REPORT?  Executive Summary  Conclusions  Recommendations  The “real” decision makers often only read these portions of the report  These parts must be short, clear, and tell the story. The remainder of this discussion will focus on the main report. Generally, let the technicians write the appendices, but be sure to check for consistency.

M BU ILDING STRONG SM HOW LONG SHOULD THE FEASIBILITY MAIN REPORT BE?  _____ 0-25 pages.  _____ pages.  _____ pages  _____ more than 100 pages?  _____ 10 Kg paper?

M BU ILDING STRONG SM What About the Rest of The Report? EXHIBIT G-7 - FEASIBILITY REPORT CONTENT (ER )  1. Study Authority.  2. Study Purpose and Scope.  3. Concise Discussion of Prior Studies, Reports and Existing Water Projects.  4. Plan Formulation.  5. Description of the Selected Plan.  6. Plan Implementation.  7. Summary of Coordination, Public Views and Comments.  8. Recommendations.

M BU ILDING STRONG SM Where Can You Get Help on Report Format? “MODEL REPORTS”  905(b) Analysis  PMP (Project Management Plan)  Integrated Feasibility Report Click on “Planner’s Library” and planning templates See also the Publications Website at IWR

M BU ILDING STRONG SM WHAT MUST BE CLEARLY EXPLAINED?  How Did You:  Identify Problems and Opportunities.  Develop Planning Objectives and Constraints.  Determine Existing and Without Project Condition  Screen Measures to Create Alternatives  Evaluate & Compare Alternatives  Why Did You:  Reformulate  Select the Recommended Plan

M BU ILDING STRONG SM ITEMS OFTEN NOT CLEARLY EXPLAINED  How were the Planning Objectives & Constraints used to develop Measures?  What strategies were used to combine Measures into Alternatives?  What Criteria were used to screen Measures and Alternatives?  How did the screening develop the Final Array of Alternatives?  How does the Final Array of Alternatives respond to the Planning Objectives and Constraints?  What are the important trade-offs between the Alternatives in the final array?  Why is a given plan the Recommended Plan?

M BU ILDING STRONG SM TIPS TO CREATE GREAT REPORTS  Keep the PDT on track and involved – don’t spend extensive study dollars doing detailed analysis of dead end alternatives.  Be aware. Technical support staff is generally uncomfortable with providing estimates of limited detail.  Don’t downplay O&M cost estimates. They can have a big impact on total annual costs and net annual benefits.  Explain all influences that played a role in identifying plans to carry forward to the next level.

M BU ILDING STRONG SM TIPS TO CREATE GREAT REPORTS  Write down your decisions as you go.  Better yet, write the plan formulation portion of the report as you go.  The formulation story should track, with no “leaps of faith”  Resource Agency involvement throughout the process.  Keep the Local Sponsor engaged in the report development process.

M BU ILDING STRONG SM TIPS TO CREATE GREAT REPORTS  Don’t re-invent the wheel. Use a good report as a template.  Avoid Fancy Fonts. Report should be clearly legible. (The most important readers may be over 50!)  Use relatively easy-to-read language.  Tables, graphs, and charts are the preferred methods for providing similar data and easy comparison.  Some color is useful, but avoid extensive use of color. Tables and figures can remain grayscale with no degradation in quality.  For authorization reports, be prepared to produce a purely black and white print copy of the report.  Level of Analysis Detail should parallel formulation process.

M BU ILDING STRONG SM TIPS TO CREATE GREAT REPORTS Point in Formulation Process Suggested Level of Design Detail 905(b) Purely Conceptual -- An idea, investigated sufficiently to determine merits and possible Federal Interest. Preliminary Screening Broad Assumptions utilizing experiences of the PDT - Keep those that make sense. Eliminate the obvious. Array for Evaluation First use of estimated quantities, with focus on major cost controlling features Final Array, Optimization Continued Refinement, identifying additional details Recommended Plan Feasibility level, as defined in ER. Must support Cost Estimate appropriate for a decision document

M BU ILDING STRONG SM Now that you have endured a week with us discussing Plan Formulation….. Go Forth Formulate Great Projects Write Great Reports