1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)

Slides:



Advertisements
Similar presentations
STAR MRPC TOF: Project Overview BNL January 26, 2006 Geary Eppley Rice University.
Advertisements

Walls crates cables gas chambers electronics CERN adb.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
ZTF Interconnecting Scheme Stephen Kaye
CsI Photocathode Production and Testing
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes  Full scale HBD  Readout board  FEM Final detector  HBD Design.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
Preliminary Results from a Trial Beam Test of the Small HBD Prototype at LEGS Bob Azmoun BNL HBD Working Group Meeting May 10, 2005.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Itzhak Tserruya IEEE 2007, October 29, 2007, Hawaii Itzhak Tserruya Weizmann Institute of Science, Rehovot, Israel for the HBD group: for the HBD group:
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.
CLAS12 Drift Chamber Prototyping
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Installation of the T600 at Fermilab CSN2, September 22,
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
1 Update from the Tent Thomas K Hemmick for the Tent People.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Mini-drawers, FE-ASIC , Integrator
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)

2 HBD global schedule

3 HBD plans for Run 6 We plan to test the HBD in run-6. The best would be to test it first with p+p collisions and then with Au+Au. But if run-6 starts with Au beams then we will reverse the order. In that case the plan is to install the HBD toward the end of the Au+Au period, in April From our present assessment, we should have ** at least ** one of the two HBD boxes partially instrumented. The precise configuration will depend on the availability of readout electronics: - minimum configuration: one box with one detector module - maximum configuration: one box fully instrumented

4 Back-up Full-scale Prototype status Safety Review Detector box construction GEM production Stony Brook test and assembly facility Gas system Analog electronics Digital electronics (As presented at the Upgrades meeting yesterday)

5 Full scale prototype status Gas tightness test at WI: leak rate 2.3 cc/min ~4 ppm of water (2 ppm from gas pipes) Triple GEM detector installed and tested inside the prototype in CF 4 with Fe 55 source. Shipped to BNL: leak during transport? leak rate now ~20 cc/min Plans: Install readout board on back of prototype Install preamps (old design) and do electrical tests to study signals with test pulse, noise, etc. Prepare and install a CsI photocathode into the detector Test GEMs with Fe-55 and UV-lamp

6 HBD Safety Review Took place on September 15 No major issues. Additional documentation requested for: - HV PS - signal cables (appropriate flame and cable tray ratings) - aramid honeycomb is the same as nomex - SHV connectors Provide plan to limit the HV PS to 5KV

7 HBD construction status All raw materials (FR4 sheets, honeycomb, HV resistors, HV connectors) ordered and most of them in house Detector box design fully completed Jig design underway Small parts (insert, pins, screws, HV holders..) in the shops Detector construction to start Nov. 1st PCB design almost complete Detailed construction schedule foresees shipment of boxes to SUNY in January 2006.

8 Constraint on maximum number of pads: 1152 pads per arm or 192 pads per panel Would be much easier to have a round number like 1200 pads per arm or 200 pads per panel  not possible We found a solution in which each panel has 192 pads and yet all six panels are identical. PCB design

9 GEM production GEM final order placed: - no changes wrt to pilot production - 65 standard GEMs - 35 Au plated GEMs frames First batch (app. 1/3 of the total) - 20 standard + 10 Au plated + 30 frames completed at CERN and shipped to WI. Gluing to frame, mounting HV resistors, and test of triple GEM modules with Fe-55 ready to start at WI First shipment of tested triple GEM modules to SUNY in 2 nd half of November. Last shipment in mid-February 2006

10 SB assembly and test facility status Clean tent ready new filters/light in services (3-phase power, water, valve pressure) ready Glove box specifications defined bid process started a few weeks ago Glove box and evaporator from Jeff Lab are being moved to SB.

11 GLOVE BOX Specifications  Type: Dry Nitrogen Glove Box –  H2O <10pmm,  Particle Level <100/m3,  Dehumidification Column with HEPA filtration,  Monitoring Instruments H2O, O2, Pressure  Pressure Range +- 10milbar,  N2, leakage 0.05%vol/h,  N2 Flow +250 l/Hr N2 From Boil off From Liquid N2, with Backup Cylinders Automatically engaged  Overpressure Vent, 4 Swagelock Fittings on each end to control gas Flow According to work.  Size (Interior): length 3m min., width 1.2m max., height 1.3m min.  3 working sections Storage [Middle] Gem Working area [Next to airlock] HBD Assembly [Hatch]  Air lock [or Transfer Chamber]  46 cm to 60cm Dia., GEM Shipping Box, and CsI Deposition Transfer Case can Pass Thru.  Maybe Pumpable, if not then a Pump Through System maybe used]  Fitted with N2 Feed, Exhaust, KF-40mm Vacuum, and H2O Measurement  Feedthroughs Panels: Located at Box ends and at center position  120VAC- 2 quad outlet Boxes with Power Strips,  Signal & HV, Gases on replaceable Panels  Gases on replaceable Panels  Lighting: Exterior and Interior Spot lighting  Glove Ports – Sealable,  8 Pairs of Glove ports, 6 pairs set evenly along the length of the Box, the 7th and 8th set above the 2 pairs next to the hatch, which is were we will assemble the HBD

12 Jefferson Lab

13 Total detector volume: ~ 626 l (313 l each side) Flow rate: ~ 60 l/hr ( ~ 150 l/hr purge) HBD Gas System Pure CF 4 Simplified Single pass system for Run 6 Extensive gas monitoring to maintain O 2 and H 2 O levels to a few ppm R.Pisani Gas pipes installed Most components ordered or in house

14 Gas Monitoring McPherson 234/302 VUV spectrometer - uses pure argon as reference gas (no vacuum) - completely enclosed 30 W D 2 lamp H 2 0 O 2 VUV transmission Gas monitoring near detector (under stairs by labyrinth) D.Lynch

15 New Preamp Design ~ ½ the area of the previous version of the preamp (0.76” x 0.57 “) Uses small Samtec connector Uses new op amp with lower bandwidth which is less prone to oscillation  Considerable reduction in radiation length from 1.6% to 0.6%

16 Schedule for New Preamps Basic design done by Joe Harder (while home recuperating from surgery !) Small prototype order (~ 200 pieces) placed (should take ~ 3 weeks) Test prototypes for oscillation, noise, etc (~ 1 week) Final design could be sent out within 1month New readout board design in parallel small changes to accommodate the new connectors should be ready in 3-4 weeks from now

17 Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse (7 blank boards, 4 crates+ 1 spare+ 2 test stands) (4 blank boards, 1 needed + 1 spare+ 2 test stands) (25 blank boards. We have major of the parts for 5 boards)  For Clockmaster, clock fanout, ADC and backplane, we either have (or will have in 1-2 days) the blank boards. These boards will be assembled soon.  Optical out – Design is done (not submitted)  New DCM daughter card design is underway. C.Y. Chi