Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
George Read Hall The University of Delaware
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Joe Sharkey Structural Option Christiana Hospital 2010 Project Newark, DE.
Mathew Nirenberg AE Senior Thesis Structural Option.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
Tom yost BAE/MAE - structural option granby tower norfolk, virginia senior thesis presentation 14 april 2008 introduction overview proposal goals depth.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Senior Thesis 2006 The Pennsylvania State University
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Discovery Communications Headquarters Silver Springs, MD Josh Woolcock Structural Option Architectural Engineering Pennsylvania State University.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Inpatient Facility Boardman, Ohio Faculty Advisor: Dr. Linda Hanagan.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Student Health Center Jacob Brambley - AE (structural option)
The Executive Tower NW Washington DC Sean T Howard Structural Emphasis Advisor: Dr. Linda Hanagan æ Class of 2006 (Roof of the Federal Building, Chicago.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
One South Dearborn Chicago, Illinois.
Presentation transcript:

Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option

Presentation Outline Project Overview Depth Study Breadth Studies –Mechanical: duct design –Construction Management: scheduling and cost estimates. Cost Analysis Conclusions GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

PROJECT INFORMATION GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Project Information-Key Players Buccini/Pollin Group Gilbane Gensler Engineers –Landmark Engineering –Duffield Assoc., Inc. –BALA Consulting Engineers, Inc. –O’Donnell Naccarato & MacIntosh GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Project Information-Overview Location: 500 Delaware Ave. 15 stories + mechanical penthouse (210’-6”) –1 st level: retail space & lobby. –14 floors office space for tenant fit-out. July 2005-December 2006 $52 million (17% structural system) 387,000 ft 2 5-story parking garage in rear Tinted glass curtain wall façade GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Project Information: Existing Conditions Composite steel framing Concrete filled steel pile foundations with pile cap 6-¼” slab on deck 30-1/4” floor depth. Concentrically braced frames. N GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006 Service Core STAIRS REST- ROOMS MECH. ROOM ELEVATOR LOBBY

Project Information: Existing Conditions N GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring ’-6”x30’-0” and 36’-0”x30’-0” typical bays. 52’-6” x 30’-0” bay 36’-0” x 30’-0” bay

DEPTH STUDY GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Depth Study-Post-tensioned Concrete Floor Design Objectives: –Preserve long span bays. –Limit floor depth to 24”. Feasibility Factors: –Cost –Schedule –Impact on foundations GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Depth Study-Post-tensioned Concrete Floor Design: One-way post- tensioned concrete slab with post-tensioned beams framing along column lines. Criteria: –6000 psi concrete –8” thick slab –52.5’ long beams: 24”x 36” beams GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Depth Study-Post-tensioned Concrete Floor Tendon Layout GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Depth Study-Post-tensioned Concrete Floor Final Design: –Initial jacking force: 1303 k in slab and 1040 k in beams. –(6)-½” dia banded tendons in slab. –Tendons spaced 6’ apart. –39 tendons in longitude beams. –20 tendons in latitude beams. GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Depth Study-Post-tensioned Concrete Floor Initial Service Loading GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Depth Study-Post-tensioned Concrete Floor Sustained Service Loading GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Depth Study-Lateral System GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006 Problems: –Increased weight impacted seismic. –Eccentricity created torsion. –Limiting drift to H/600 = 4.21” Solutions: –Added 1 shearwall between mechanical room and elevator lobby. –Considered concrete frames to resist lateral load. –Maximum drift was 3” (H/840).

Depth Study-Lateral System Shearwalls: 12” thick 4000 psi with 14” o.c. N GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006 Additional shearwall

Depth Study-Lateral System GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006 Seismic Loads in east-west direction: 0.9D E Wind Loads in north-south direction: 1.2D + 1.6W + L L r

Depth Study-Impact on Foundation Increase foundation loads by an average 38%. Change foundations to end- bearing caissons. –Minimum size: 3.5’ diameter –Maximum Size: 6.5’ diameter GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

BREADTH STUDIES GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

MECHANICAL STUDY GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Mechanical Study Check for proper indoor air quality. Design ductwork. GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Mechanical Study Existing system: –Rooftop cooling tower. –Heat pump and air conditioning unit in each mechanical room. –26”x96” main supply duct on each floor. 24”x24” supply and return diffusers. Ceiling plenum return. GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Mechanical Study GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006 Typical open office floor plan for 6 tenants.

Mechanical Study GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006 Supply diffuser layout with 16’ air throws. 650 cfm per diffuser.

Mechanical Study Supply ducts with return stub ducts. –Largest: 68”x20” –Smallest: 10”x10” Exhaust LouverReturn grill GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

CONSTRUCTION MANAGEMENT STUDY GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Construction Management Study Schedule Comparison Cost Comparison Rough estimate of foundation costs and comparison. GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Construction Management Study-Scheduling Duration: 156 days –Columns (F/R/P): 2 days Forming Tying Reinforcement Pouring and curing –Construct/Erect shoring and formwork: 3 days –Tie reinforcement for slab and beams: 1 day –Rough-in for MEP: 1 day –Concrete (for each section): Pour and finish: 1 day Cure: 2 days –Strip formwork & reshore: 2 days –Jack the post-tensioning tendons: 1 day GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Construction Management Study-Estimates GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Construction Management Study-Estimates GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Construction Management Study-Estimates GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Construction Management Study GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

CONCLUSIONS GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Conclusions Post-tensioned system is viable based on cost and schedule, not on foundations. Achieved savings of 6.25”/floor=100” total. GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

Acknowledgements O’Donnell Naccarato & MacIntosh Peter Paton, Structural Engineer Gilbane Craig Hedlund, Construction Manager Dr. Linda Hanagan RAM Concept Technical Support Chad Illig Anthony Lucositic David J. Melfi Justin Mulhollan Steven Puchek  GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006

QUESTIONS? GATEWAY PLAZA Wilmington, DE Elizabeth Hostutler – Structural Option – Spring 2006