ORAP ® New User Orientation March 4, 2007 Carlos Garcia Strategic Power Systems, Inc.

Slides:



Advertisements
Similar presentations
3PM, 11th February 2004 Patio Hotel, Aberdeen Inaugural forum
Advertisements

Energy Service Fossil Product Portfolio
Accel Computerized Maintenance Management System.
Sunday Business Systems Asset Tracking Database Control Calibrated Equipment Manage Preventive Maintenance Maintenance Tracking.
NERC/GADS Reporting Requirements John Yale Hydro Plant Engineering Manager Chelan County PUD 1.
MAINTENANCE DEPARTMENT Presented by: John Argabright, Maint. Supervisor Muskingum River Plant APP Site Visit October 30 – November 4, 2006.
Powerpoint Templates Page 1 Powerpoint Templates Page 2 Something you own that has value There can be assets that gain value over time…. What is an Asset?
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
An off the shelf system for Downtime and OEE Reporting.
© ABB Group May 15, 2015 | Slide 1 The MotorAdvantage – how to save UK industry Steve Ruddell, Division Manager, Discrete Automation and Motion, ABB Ltd.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Improving Boiler Water Chemistry Regional Seminar Series Cincinnati.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Measuring and reporting outcomes for your BTOP grant 1Measuring and Reporting Outcomes.
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
SE 450 Software Processes & Product Metrics 1 Defect Removal.
NGEC - SFTF Structure and Finance Task Force Eric Curtit, MODOT Section 6 Project Update.
Introduction to SAP R/3.
Operations Management
Introduction and Course overview by S. O. Duffuaa.
Maintenance and Reliability
North American Power Plant Services Markets Changing Operation Philosophies and Outdated Service Agreements Impair Pace of Growth of Power Plant Services.
Problems with reuse – Increased maintenance costs; lack of tool support; not-invented- here syndrome; creating, maintaining, and using a component library.
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
North American Power Generation Rentals Market Rental Prices Continue to Slide while Revenues Begin to Recover after Sharp Downturn “With the power rental.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
Motor Management Basics What Needs to be Managed Motor Life Cycle Measuring Motor Reliability Managing Condition Information Data Mining for the big Reliability.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
Clockwork Solutions, Inc. Clockwork Solutions, Inc. 1 SPAR Technology Achieving Life Cycle Performance and Cost Risk Reduction Through Advanced Sustainment.
Fleet Performance and Reliability in Generation Utilities
2013 Northwest Hydro Operators Forum Hydro Reporting to NERC GADS Steve Wenke Avista May 7, 2013.
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2006 Thomson Business & Professional Publishing. All rights reserved.
Software Estimation and Function Point Analysis Presented by Craig Myers MBA 731 November 12, 2007.
S Q A.
Copyright © 2007 OSIsoft, Inc. All rights reserved. Ekho - MES Applications that leverages AF 2.0 Yannick Galipeau Inexcon Technologies Patrick Ramsey.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
© Copyright 2002 Frost & Sullivan. All Rights Reserved. North American Transient Voltage Surge Suppressors (TVSS) Markets Possible Business Losses Force.
Service Management Series (to perform Work Order Management)
Analytical Reliability Centered Maintenance
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
I2 U Intelligent Supply Chain Management Course Module Seven: Inventory Planning.
CM Tools Data Management Trends Wednesday, June 4, 2008 Laurent Perkins Enterprise Informatics.
June 2015 Unrestricted © Siemens AG All rights reserved. Page 1siemens.com/asset-analytics Machine Tool Analytics Plant Data Services – Asset Analytics.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
Maintenance Management [14]
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
Putting Performance in Context Keys to Closing The Performance Gap Maureen Coveney, OSIsoft Todd Spencer, SmartSignal Michael Saucier, Transpara.
© Copyright 2002 Frost & Sullivan. All Rights Reserved. North American Power Quality Services Markets Demand for Reliable Power Spurs Market “Users are.
© Copyright 2004 Frost & Sullivan. All Rights Reserved. Asian Power Plant Services Markets A Potentially Lucrative Market Energy Markets Group “The lure.
IBM Maximo Asset Management Doug Wood, Architect Tivoli CTO’s Office COBie CMMS/CAFM Challenge121-Dec-11.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Central Issuance Registry Presentation for End-Users November, 2008 Special Note: This presentation includes information on Datacard Group’s long range.
Chapter 11 Information Systems Within the Organization.
© Copyright 2003 Frost & Sullivan. All Rights Reserved. North American Switchgear Markets Retrofitting and Value-Added Services Add Fresh Impetus to Growth.
© Copyright 2003 Frost & Sullivan. All Rights Reserved. North American Cogeneration Equipment Market Sporadic Nature of Orders Adversely Impacts Manufacturers.
OWNER BY MFG OUTPUTS Incoming Supplier Quality Audits ( Supplier feedback System) Continuous Improvement plans Yields Cycle Time Problems solving as needed.
© Copyright 2004 Frost & Sullivan. All Rights Reserved. North American Markets for Mechanical Prime Movers in the Oil and Gas Industry High Costs of Crude.
Maintenance Management Software SPUDWEB TECHNOLOGIES PRIVATE LIMITED SPUMAINT Presented By :-
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling.
LubeWatch® Oil Analysis Program
SAP Business One – Maintenance Management
2012 Line Information System Coca-Cola Refreshment
Operations Management
Operations Management
PREVENTIVE MAINTENANCE
EQUIPMENT RELIABILITY AT KOEBERG
Operations Management
Presentation transcript:

ORAP ® New User Orientation March 4, 2007 Carlos Garcia Strategic Power Systems, Inc.

3/4/07 p.2 Who is Strategic Power Systems (SPS)?  Information Technology and Reliability Engineering Co. –Compiling Reliability, Availability and Maintainability (RAM) data  Focus –Gas and Steam Turbine Plants Power Generation Oil and Gas  Industry Methodology –Common coding structure (EBS & KKS) –IEEE and ISO standards –NERC and WEC compliant –Strong support from EPRI

3/4/07 p.3 SPS & WTUI SPS Supports WTUI GE Aero ORAP Contract Legend SPS Installs 1 st ORAP LINK™ at CP&L SPS Introduces ORAP Parts Tracking™ SPS Introduces 1 st PC Based Entry Tool SPS Introduces ORAP Interactive™ web-based reporting SPS moves to Charlotte, NC Introduced Parts Tracking & Configuration Management Module in ORAP SPS Incorporated Albany, NY SPS Introduces ORAP Cycles Tracking™ WTUI Founded SPS notetakers at WTUI

3/4/07 p.4 Base ORAP Base ORAP ®  Proprietary database –Operating and maintenance information on total plant equipment  Benchmarking –Customer and market reports  Participants submit data on a monthly basis  Quarterly reports provided to participants

3/4/07 p.5 Data Requirements  Event Data: - Begin Date/Time/End Date - Outage Type (Forced, Scheduled, Unscheduled, Derating) - Component (Equipment that caused the Event) - Outage Mechanism (Failure or Maintenance Reason) - Detailed Narrative (Symptom, Corrective Action Performed and Root Cause of Outage)  Operational Data: - Service Hours - Reserve Hours - Attempted and Successful Starts - MW Hrs Generated or Hp, ETC  Counter Reading Data: - Total Service Hours - Factored Hours/Equivalent Hours - Total MW Hrs Generated - Total Starts, ETC

3/4/07 p.6 Data Output Compares plant component data on a yearly basis Compares all your unit(s) maintenance factors and % on a per year basis RAM Benchmarking

3/4/07 p.7 ORAP Benefits  Preventative Maintenance –Trends across the Fleet –Breakdown by components and sub-components (total plant) –Availability –Reliability –Service Factor –Starting Reliability –Outage Factors –Mean Time Values  Benchmarking –Your unit vs. total Fleet in ORAP –Your unit vs. Best in Class Performers in ORAP  Forecasting… e.g. Hot Section Overhauls

3/4/07 p.8 Revenue Opportunity  Extended Intervals Between Maintenance & Engine Removals  Determine Source of Downtime… Frequency & Duration  Define Parts Life Limits Empirically  ORAP Provides Critical Information That Helps You Better Understand Your Business  ORAP Will Help Your Business Be Profitable  Industry Expectations… Return on Investment Must Result In… –5% reduction in inventory… –5% reduction in planned maintenance… –25% reduction in unreliability… –10% reduction in RO costs…

3/4/07 p.9 Who Uses ORAP… Just a Sample

3/4/07 p.10 Why ORAP?  Largest and Most accurate RAM database –All OEM Gas and Steam Turbines –All markets  Benchmarking –Your unit vs. the Fleet and Best in Class  Close Relationship with OEMs –ORAP supports design and quality efforts with many OEMs  Customer Focus –Value-added service supporting participants and OEMs  Open minded

3/4/07 p.11 Questions?

3/4/07 p.12 Visit our Booths! – 517 & 616  Register to WIN an Apple iPod Nano and a AMEX gift Card!  Join ORAP here at WTUI –We will send everything you need to your $100 American Express Gift Card

3/4/07 p.13 Detailed ORAP Screenshots

3/4/07 p.14 Event Data

3/4/07 p.15 Input - Events Screen

3/4/07 p.16 Input – Counter Data

3/4/07 p.17 Input – Operational Data