Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.

Slides:



Advertisements
Similar presentations
Columbia River Treaty Review 1 WA Association of Counties April 25, 2013.
Advertisements

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Condition Update Spring Operations Review Forum June 15, :00 – 2:00 p.m. To participate.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing an Over-Supply of Generation October 12, 2010 Public Meeting.
BC Hydro Generation system operation
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Northwest Electricity The Council An interstate compact of ID, MT, OR and WA, not a federal or state agency. An interstate compact of ID, MT, OR and.
Columbia River Inter-Tribal Fish Commission 1 Tribal Perspectives on the Columbia River Treaty Jim Heffernan, CRITFC Policy Analyst – Columbia River Treaty.
Columbia River Inter-Tribal Fish Commission 1 Columbia River Treaty 2014/2024 Review Paul Lumley, Yakama, CRITFC Executive Director Northwest Hydroelectric.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
Modeling Flood Control Flexibility using the GENESYS Hydro Model Kyle Martin Mainstem Hydrologist Columbia River Inter- Tribal Fish Commission Portland,
Optimized Flood Control in the Columbia River Basin for a Global Warming Scenario 1Dept. of Civil and Env. Engineering, UW 2CSES Climate Impacts Group,
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
1 Columbia River Forum Columbia River Treaty A Federal Perspective David Burpee Natural Resources Canada November 9, 2005.
Colorado River Overview February Colorado River Overview Hydrology and Current Drought Management Objectives Law of the River Collaborative Efforts.
Federal Columbia River Power System Operations Planning.
FBC Resources 1 Dan Egolf Manager, Power Supply & Planning.
COLUMBIA RIVER SYSTEM OVERVIEW
Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005.
NORTHWEST POWER POOL Reliability through Cooperation
U.S. Army Corps of Engineers TMT Annual Review Weather and Water Summary Presented by Karl Kanbergs USACE, Water Management Division December 7, 2011.
Introduction to Bonneville Power Administration
Designing effective national incentive and subsidy schemes in industrial policy (energy and water) Jerson Kelman Brazil Round Table Comparative Analysis.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Columbia River Treaty Review British Columbia Perspective Northwest Hydroelectric Association 2013 Annual Conference Portland, Oregon February 20, 2013.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
BUILDING STRONG SM 1 Columbia River Salmon and Federal Columbia River Power System Rock Peters Senior Program Manager.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
1 Columbia River Treaty Overview of Columbia River system water management presented at Canadian Columbia River Forum 30 May 2007 Kelvin Ketchum BC Hydro.
US ARMY CORPS OF ENGINEERS NORTHWESTEN DIVISION PORTLAND, OREGON WELCOME BY COL. FASTABEND Division Commander.
1 BC Generation Overview Central Asia Delegation 30 January 2013 Doug Robinson Canadian Entity Secretary BC Hydro - Generation.
Hydro Power 102. Hydroelectric Models in the Northwest.
Trans-boundary issues in the Pacific Northwest.
Dam of the Day Bonneville Dam Duffy Dessalines September 27, 2001.
The Columbia River Basin Where we’ve been. Where we’re going. October 18, 2005.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
July 17, 2013 Wenatchee, WA Kevin M. Nordt Grant PUD 1.
2014/2024 Review Columbia River Treaty Bonneville Power Administration - U.S. Army Corps of Engineers Briefing for the Central Asian Delegation January.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 BPA Overview May 2009.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Northwest Power and Conservation Council slide 1 The Columbia River Treaty John Shurts General Counsel Northwest Power and Conservation Council Portland,
April Columbia River Treaty Overview of Columbia River Treaty.
Proposed Contract to Perform Regional Sustained Hydro Peaking Capability Study Mary Johannis PNW Resource Adequacy Steering Committee January 29, 2008.
Columbia Basin Regional Advisory Committee Provincial Columbia River Treaty Review September 11, 2014 Nelson, BC Kathy Eichenberger BC Ministry of Energy.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
HYDROPOWER NWD HAS LION SHARE (75%) OF COE HYDRO NWD HAS LION SHARE (75%) OF COE HYDRO PACIFIC NW’S DOMINANT POWER SOURCE PACIFIC NW’S DOMINANT POWER.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING IV U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
Alan F. Hamlet Jeffrey Payne Dennis P. Lettenmaier Richard Palmer JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington.
Experiences From the Columbia Basin British Columbia, Canada Commission for Environmental Cooperation of North America Joint Public Advisory Committee.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Reclamation and Hoover Dam It’s All About The Water.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Modeling the Hydroelectric System in GENESYS Resource Adequacy Forum Technical Committee Meeting July 25, 2007.
GENESYS Current Functionality
Presentation transcript:

Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water Management Portland, Oregon October 2001

SYSTEM COORDINATION NEEDS:  Joint planning requirements for inter-system transfer, and bilateral agreements  Efficiency of single ownership with individual autonomy;  Firm commitment  Fair headwater benefit payment  Optimize use of storage for system flood control

Columbia River Treaty Organization

Columbia River Treaty Signed 1961; ratified 1964 Three Candian Reservoirs: Mica, Keenleyside, and Duncan FLOOD CONTROL FLOOD CONTROL:  8.45 Maf for flood control for 60 years from 1964;  Additional 7 Maf TS and 5 Maf of Non-Treaty Storage on call  $64.4 million to Canada (1/2 of estimated present worth of future flood damages prevented) ( 1 Maf=1.23 Km 3 )

Columbia River Treaty POWER POWER:  $254 million to Canada (1/2 of estimated present work of future power generation)  This payment enabled Canada to build three Treaty storage projects  The Columbia River Treaty allowed the U.S. to build the third powerhouse at Grand Coulee ( 1 Maf=1.23 Km 3 )

Columbia River Treaty Hydropower: Hydropower: 5.5 maf of Can. Stor. for optimum power generation in the U.S. and Canada. Power Benefits Power Benefits : Dependable Capacity and Average Annual Usable Energy Canada Entitlements Canada Entitlements : 1/2 of the increased MW generated downstream in the U.S. due to the operation of Canadian Treaty Storage. Calculated 6 years in advance, based on 1961 Base Hydro System; Independent of Actual operation and runoff year. Downstream Power Benefits : Downstream Power Benefits : remain in country where they are generated.

Treaty Project Data Treaty Non-Treaty Installed Hydraulic Completed Storage Storage Capacity Capacity MICA maf 5.0 maf 1740 MW 40 Kcfs ARROW maf.25 maf 170 MW* 139 Kcfs DUNCAN maf None None 10 Kcfs 15.5 maf LIBBY maf 604 MW 25 Kcfs *under construction online date - Fall of 2001 (1 Maf=1.23 km 3 )

Non-Treaty Storage (NTS) In addition to the 15.5 maf of Treaty storage, Canada built 5 Maf of non-Treaty storage in Mica.  BPA and BC Hydro are parties to the NTS Agreement to use this storage for power generation purposes.  The Corps monitors weekly Non-Treaty storage activity as it pertains to overall Canadian storage. We are not active in the use of the storage. (1 Maf=1.23 Km 3 )

Treaty Challenges Current: Libby Coordination Agreement Biological Opinion request for 1 maf & other storage at Arrow Meeting Canadian Needs: fish, recreation, & dust storm control Long Term Strategy for Developing Assured Operating PlansPotential: Need for additional Canadian storage operation for U.S. fish Within month flexibility of Treaty storage operation Adopting Alternative Flood Control (called VARQ) Additional Endangered Species Act Listings (burbot)

Coordination Agreement Agreement for Coordination of Operations among Power Systems of the Pacific Northwest, signed 1964 Members: Corps, BPA, USBR & generating utilities Parties agree to coordinate the operation of their respective Systems... so as to : Make available to each System its optimum Firm Load Carrying Capacity, Provide optimum Firm Load Carrying Capability for the Coordinated Systems, and Produce the optimum amount of usable secondary energy for each System Outlines water storage and power transfer rights and obligations

PNCA CONCEPTS  Set of operating rules and “Rule Curves " that govern the amount of firm energy each project can produce during particular months, as if all projects operates like a single system.  Developed by representatives from each participating utility as part of the Northwest Power Pool, which also helps coordinate operation and transmission concerns.  Many other smaller agreements among utilities to promote Cooperation (when desirable) and Competition (when appropriate).

PNCA at a Glance CONTRACT: 26 sections, 5 Amendments PARTIES: 16 in 1964; 17 after 1984; Hydro projects coordinated: 102 in 1964; 120 in 1992 ACTUAL ENERGY REGULATION: (1) Unified, twice/month continuous simulation using actual & forecasted Q for current operating year; (2) Determines actual rights & obligations CRITICAL PERIOD (NOT AVERAGE YEAR) PLANNING: Must meet Firm Energy Load Carrying Capacity (FELCC) during most adverse 60-year historical stream flows (permitted reservoir elevations) OBLIGATIONS: store or discharge water, deliver energy, make payments, and demonstrate refill capability if drafting below targets.