Follow-Up and Checkpoints of Harmonics in Collared Coils and Cold Masses E.Wildner AT-MAS-MA.

Slides:



Advertisements
Similar presentations
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Advertisements

STA305 week 31 Assessing Model Adequacy A number of assumptions were made about the model, and these need to be verified in order to use the model for.
© 2008 Masimo Corporation Includes a review on Carbon Monoxide Poisoning For Emergency Responders V.8 1 May 2011 Monitoring CO Poisoning with the Rad-57.
Statistics: Data Analysis and Presentation Fr Clinic II.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
USPAS June 2007, Superconducting accelerator magnets Unit 21 Magnetic measurements and tools to control the production Soren Prestemon and Paolo Ferracin.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
Higher Biology Unit 1: Cell biology Unit 2: Genetics & Adaptations
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 11 Regression.
ICESat TM 04/21/20031 MIT Activities Two main areas of activity: –Validation of atmospheric delays being computed for ICESat –Assessment of statistics.
C. HOA AT-MAS-MA 2/02/06 Status of “non standard” ACCEL measurements in MAS Database Content: ACCEL Data MAS SSS Database with ACCEL data Summary.
Field Quality Working Group-14/12/04 - Stephane Sanfilippo AT-MTM-AS Field Quality measurements at cold. Standard program v.s extended tests. Presented.
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Big Idea 1: The Practice of Science Description A: Scientific inquiry is a multifaceted activity; the processes of science include the formulation of scientifically.
Measurements and DB meeting 1 December, 2005, Elena Wildner AT/MAS 1 AC/GEO mole measurements Based on outcome from meeting 24/ and Installation.
P. Fessia, S. Krog-Pedersen F. Regis, L. Rossi
Quality Control Lecture 5
Make observations to state the problem *a statement that defines the topic of the experiments and identifies the relationship between the two variables.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
L. Fiscarelli, S. Izquierdo Bermudez, O. Dunkel, S. Russenschuck, G. Willering, J. Feuvrier 22 nd September 2015.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
July 31, 2003Tevatron Alignment Review JCT (Re-)Shimming of Tevatron Dipoles  Recent ‘cold lift’ measurements indicate ‘creep’ or shrinkage of the coil/cryostat.
MM planning for HiLumi-LHC L. Fiscarelli M. Buzio, O. Dunkel, T. Zickler 4 March 2015.
Workshop Chamonix XIV, Elena Wildner AT/MAS1 E. Wildner Geometry of the Main Bends and the Short Straight Sections.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
CHAPTER 27: One-Way Analysis of Variance: Comparing Several Means
UsersTraining StatisticsCommunication Tests Knowledge Board Welcome to the Knowledge Board interactive guide! We encourage you to start with a click on.
Improvement of the Monte Carlo Simulation Efficiency of a Proton Therapy Treatment Head Based on Proton Tracking Analysis and Geometry Simplifications.
Brainstorming on the field model: MAS activities P. Hagen, E. Todesco, J.P. Koutchouk CERN, 24 h March 2006 Field quality Working Group.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
WGA 8 June 2004Jerome BEAUQUIS AT/MAS 1 Derived Parameters from Dipole Geometric Measurements Introduction “Miscellaneous” parameters “Stability” parameters.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
BI Offline Algorithm Framework Some Examples of What It Can Do for Us.
Review of the Tests of Superconducting Magnets in SM18 14-January Measurements of Special SSS during production N. Catalan Lasheras Review of the.
Saw Tooth Pattern Dipole Axis Measurements. Vertical Plane Natalia Emelianenko February 2006.
Field Quality Workshop - Components - F. Bertinelli 1 Workshop on Field Quality Steering of the Dipole Production CERN, March 2003 Status and trends.
FJPPL-FKPPL ATF2 Workshop Jitter studies March 18, 2014 Beam jitter localization and identification at ATF2 Marcin Patecki Jürgen Pfingstner 18 th of March.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Expected field quality in LHC magnets E. Todesco AT-MAS With contributions of S. Fartoukh, M. Giovannozzi, A. Lombardi, F. Schmidt (beam dynamics) N. Catalan-Lasheras,
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
Announcements Topics: -Introduction to (review of) Differential Equations (Chapter 6) -Euler’s Method for Solving DEs (introduced in 6.1) -Analysis of.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
CIVE Engineering Mathematics 2.2 (20 credits) Statistics and Probability Lecture 12- Linear regression review Transforming data -Coursework questions?
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
E. Todesco RETRAINING AND DETRAINING IN THE LHC E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC Machine Advisory.
Monitoring Energy Gains Using the Double and Single Arm Compton Processes Yelena Prok PrimEx Collaboration Meeting March 18, 2006.
1 SOFTWARE FOR VERIFICATION OF HOMOGENEITY RESULTS FROM AUTOMATED URINE ANALYZERS IN REAL TIME Waldemar Volanski Ademir Luiz do Prado Geraldo Picheth et.
Electromagnetism lab project. Contents 1.Overview of the course 2.How to analyse errors in measurements 3.How to make graphical representations (plots)
Magnetic measurements on MBHSP104
24/11/2017 Performance of the room temperature Systems for Magnetic Measurements of the LHC Superconducting Magnets at CERN J. Garcia-Perez, J. Billan,
Computer aided teaching of statistics: advantages and disadvantages
Electromagnetism lab project
Integration of Mathematica in the Large Hadron Collider geometry database Jerome Beauquis Elena Wildner IMS06, 20 June, 2006, Elena Wildner.
MSCB(MS) inter-axis in SSS
DS11 T Transfer function, integral field and coil length
the MDP High Field Dipole Demonstrator
Pierre-Alexandre Thonet
Geometry: analysis and trend.
The Nature of Science Do Now: In your notes answer the following question What does science mean to you?
UPDATE ON DYNAMIC APERTURE SIMULATIONS
RSNA Meeting, Chicago, IL
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Quality Control Lecture 3
HQ01 field quality study update
Presentation transcript:

Follow-Up and Checkpoints of Harmonics in Collared Coils and Cold Masses E.Wildner AT-MAS-MA

20 th March 2003E. Wildner, AT-MAS-MA2 What do we control Field quality in the dipole specification Warm magnetic measurements How we control The holding point The holding point tools Results obtained so far Overview Data validation: Measurement problems Data analysis: Quality control Conclusions Contents

20 th March 2003E. Wildner, AT-MAS-MA3 What do we control Field quality in the dipole specification Warm magnetic measurements How we control The holding point The holding point tools Results obtained so far Data validation: Measurement problems Data analysis: Quality control Overview Conclusions Contents

20 th March 2003E. Wildner, AT-MAS-MA4 Field Quality in the Dipole Specification The philosophy of the specification: A magnet can be refused if we can prove that the assembly procedure has not been followed correctly The firms are not responsible for the field quality required for beam dynamics, but CERN will indicate the corrective actions Statistical control important in holding the point procedure also to detect assembly problems

20 th March 2003E. Wildner, AT-MAS-MA5 Magnetic measurements to monitor production Measurements carried out in the firms by CERN/Firm personnel Magnetic measurements at 300 K 0.75 m rotating coils, 20 positions along the longitudinal axis Quality control of the magnet - early detection of problems Not all problems can be detected (1005, cold welds in sc cables) Many of them can be detected (2002, faulty assembly, 1021 doubts on assembly procedure) Steering field quality towards beam dynamics limits (using correlations to measurements at 1.9 K, at CERN)

20 th March 2003E. Wildner, AT-MAS-MA6 What do we control Field quality in the dipole specification Warm magnetic measurements How we control The holding point The holding point tools Results obtained so far Data validation: Measurement problems Data analysis: Quality control Overview Conclusions Contents

20 th March 2003E. Wildner, AT-MAS-MA7 How do we control: The Holding Points Two Holding Points for magnetic field: Collared coil assembly, before proceeding to cold mass assembly Cold mass assembly, before shipping to CERN Results of Holding Point: OK: approval OK-W: approval, but a warning on specific problems is given to project engineers, technicians, and to the firm OK-c.a.: approval, but a corrective action will be taken on the cold mass (collared coil only) HOLD: not approved, collared coil or cold mass hold for analysis

20 th March 2003E. Wildner, AT-MAS-MA8 How do we control: The Holding Hoints (2) How is the holding point managed ? Measurements carried out in the firms by CERN/Firm personnel Analysis at CERN - answer to the manufacturer through AT-MAS- MD (ok necessary for CERN invoicing to firm) In case of problems, an informal “unit of crisis” (project engineers and technicians, analysts) is immediately activated How is the analysis done ? A macro using information based on statistical analysis of previous magnets sets alarms for multipoles and positions Green (ok), yellow alarm (warning), red alarm (special care) Control limits are not related to beam dynamics specifications: this is a check of production homogeneity

20 th March 2003E. Wildner, AT-MAS-MA9 Alarm Classification Green: Up to 3.5 standard deviation of a Gaussian Distribution which corresponds to 1 alarm on the whole production Yellow: From 3.5 to 7 standard deviation of a Gaussian Distribution Red: From 7 standard deviation of a Gaussian Distribution We have more alarms which means that the distribution is not Gaussian

20 th March 2003E. Wildner, AT-MAS-MA10 The holding point analysis For a “normal” magnet we need to: Download measurements file (mail) Analyze the data: data validation, macro results, interpretation, comparison with previous cases Store file in repository and upload to Oracle Update graphs that make comparison to beam dynamics ranges Put them on the web Write answer to AT-MAS-MD At maximum production speed: 8 cold masses per week 16 measurements per week (cc and cm, 100% or more tested)

20 th March 2003E. Wildner, AT-MAS-MA11 The holding point data storage Measurement data: immediate (.txt,.xls) The Oracle Database (J.Beauquis) is filled with all measurements Data of each dipole: Repository on the web (Excel) Plots of multipoles: Field Quality Observatory on the web (Excel) When Dipole shipped: Analyzed data in MTF

20 th March 2003E. Wildner, AT-MAS-MA12 The statistical filters, philosophy Macro designed for collared coil and adapted for cold mass Data measured on 20 positions along the axis Magnetic length Straight part positions from 2 to 19 Head CS Position 1 Coil positioning Variation from straight part average for each position from 2 to 19 Straight part average Head NCS Position 20

20 th March 2003E. Wildner, AT-MAS-MA13 Collared coil Cold mass analysis example: b 2 Similar Pattern Difference is more appropriate Cold Mass Difference

20 th March 2003E. Wildner, AT-MAS-MA14 Macro/Analysis by E.Todesco, S. Pauletta, E.Wildner Excel Program with Macro for computation of alarm limits Similar analysis for collared coil and cold mass -> similar Excel macro BUT for the cold mass the difference between collared coil and cm is analysed-> use cold mass or difference according to smallest standard deviation For cold mass: additional yoke laminations taken into account for the tests of magnetic length Holding Point: Analysis of collared coil & cold mass

20 th March 2003E. Wildner, AT-MAS-MA15 The holding point result

20 th March 2003E. Wildner, AT-MAS-MA16 What do we control Field quality in the dipole specification Warm magnetic measurements How we control The holding point The holding point tools Results obtained so far Data validation: Measurement problems Data analysis: Quality control Overview Conclusions Contents

20 th March 2003E. Wildner, AT-MAS-MA17 Quality Control Data validation: Measurement problems (calibration, signs, problems with measurement device etc.) Data format (units, delimiters, etc) Analysis of measurement results (1200 parameters per collared coil or cold mass): Statistical evaluation to detect elements out of statistics and to detect trends The analysis should permit to detect problems in assembly

20 th March 2003E. Wildner, AT-MAS-MA18 81/81 collared coil measured [100%] 14 cases of multiple measurement [17%] 4 faulty measurements, 2 measurements confirmed field anomalies 8 special measurements asked 2 decollarings asked: 2 assembly problems found [2%] 21 warnings given to firms [25%] 13 warnings for large multipole variations (curing mould at Firm 1) 9 warnings for anomalies in multipoles 4 corrective actions: additional laminations to correct low B [5%] 43/44 cold masses measured [98%] 3 cases of faulty measurements [7%] 1 unwelding for high variations of field direction [2%] Quality Control: Summary

20 th March 2003E. Wildner, AT-MAS-MA19 Measurement problems Sign of multipoles: 1018, 1023 cold mass: cabling of measurement coil inversed Data points inversed: 1023 collared coil and 1015 cold mass : data sent with connection side replacing non connection side and vice versa: wrong measurement procedure Field colinearity: If different measurement coils are used for the two apertures the colinearity cannot be measured (missing software for calibration of field direction, no manpower) 1 mm off on x and y 2016 collared coil: one position had a bad mole positioning in the tube Higher normal multipoles out of statistics: 2020 cold mass: Inversed calibration of the two measurement coils

20 th March 2003E. Wildner, AT-MAS-MA20 Faulty assembly (see [R. Gupta et al., MT-15 ] for experience at RHIC) 2002 had big spikes in c 1 (40 u.), b 2 (24 u.), and anomalies in b3. Decollared, it has been found that it was erroneously assembled with two coil protection sheets (0.5 mm more !) on a 1-m section This case showed that control limits for the production and beam dynamics limits are and must be independent (the magnet field quality was ok for beam dynamics) Assembly collared coil 2002

20 th March 2003E. Wildner, AT-MAS-MA21 Assembly collared coil 1027 Faulty assembly (see also [R. Gupta et al., MT-15 ] ) 1027 had a spike in b 2 (5.5 u.), and anomalies in b 3 and a 2. Strong numerical evidence of a missing shim (0.8 mm) along 1 m Decollared, a missing shim was found in the foreseen position

20 th March 2003E. Wildner, AT-MAS-MA22 Twist of cold mass Trend of twist of cold mass main field vector ?

20 th March 2003E. Wildner, AT-MAS-MA23 Magnet 1021 unwelded: problems with welding press Magnet remeasured after reweld: Result ok! Trend stopped Check of correlation between geometric and magnetic twist: Large twist large correlation Twist of cold mass: relation to geometry G.Gubello M.Bajko

20 th March 2003E. Wildner, AT-MAS-MA24 Twist of cold mass: result for rewelded magnet

20 th March 2003E. Wildner, AT-MAS-MA25 The standard deviation of multipoles along the axis are best fitted with parabola worked out through simulations (random movement of blocks) We extract the amplitude of the random movement giving that pattern of the standard deviation (usually around microns) Quality Control: Coil waviness from measurements

20 th March 2003E. Wildner, AT-MAS-MA26 Firm 1 showed in several collared coils a coil waviness along the axis above what obtained from Firm 2 and 3 (up to 80  m instead of  m) - actions on curing mould - problem not yet solved - not critical for beam dynamics, but bad quality of assembly Quality Control: Warning to firms (coil waviness)

20 th March 2003E. Wildner, AT-MAS-MA27 Problem: how to recognize if a new measurement refers to a magnet already in the database (This already happened) ? An elegant solution based on coil waviness (S. Pauletta): difference of two measures - extraction of ‘differential’ coil waviness - if less than 10 microns, then it is the same magnet Coil waviness: Magnet Fingerprint Works also between collared coil and cold mass A program (G.Bevillard) extracts all measurements from the database and calculates the differential coil waviness

20 th March 2003E. Wildner, AT-MAS-MA28 Conclusion We have a method for dealing with statistical control and trend analysis of the dipole production: Magnetic field of collared coil and cold mass Data in relational database to make rapid checks and log We have been able to detect measurement problems and problems with assembly: Remeasurements and reassembly We believe our procedures will permit to check and steer production of the dipole (magnetic field)

20 th March 2003E. Wildner, AT-MAS-MA29 Acknowledgements J. Billan, V. Remondino, P. Galbraith, G. Molinari, R. Moresi, A. Musso, G. Peiro, M. Zehner (measurements at 300 K) J. Beauquis, G. Bevillard, G. Gubello, S. Pauletta, W. Scandale, E. Todesco, C. Vollinger (database and data analysis)