Northern Integrated Supply Project NSPE-Colorado State Meeting February 2010.

Slides:



Advertisements
Similar presentations
J2 Regulating Reservoir Project
Advertisements

Presented by: Ronald O. Nichols LADWP General Manager
Overview History of the PDWG Three Steps to Renewable Water –Efficient Use –Sustainable Use –Reliable Use Conclusions.
1 San Joaquin River Exchange Contractors Water Authority WEF- Central Valley Tour April 23, 2014 Mission Statement : To effectively protect the Exchange.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
Kansas Westward Water Transportation: Setting the Stage Presented by: Mark Rude August 1, 2014 Kansas Water Congress.
Groundwater Management Districts Association
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
1 Overview of South Yuba River Hydrology Bob Center Presented to FERC Academy on December 10, 2005.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Slide 1 November 2005 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Phase 1 Recommendations Oakdale Irrigation.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
Bruce Moore, Manager Colorado River Division Southern Nevada Water Authority July 28, 2010.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Water in California: Self-induced Scarcity Waterscape International Group.
INTRABASIN, INTERBASIN AND TRANSMOUNTAIN WATER MOVEMENT TO MEET GROWING WATER DEMAND CASE STUDIES David Merritt, P.E., D.WRE Chief Engineer Colorado River.
CADIZ INC. Sustainable Land, Water & Agricultural Resources (NASDAQ: CDZI) June 2015.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Lake Columbia Water Supply Reservoir Project TWCA March 4, 2010.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Urban Water Institute Conference August 22,
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
Interdisciplinary Water Resources Seminar GS 592 Development of New Water Resources Wayne Vanderschuere.
Middle Fork Project Project Description April 25, 2006.
Gold Ray Dam Removal Today Review RFP process and dates Touch on contract / award issues Review a few key issues as you develop your proposals Provide.
HIC MEETING July 12, 2005 Streamflow Regulation Accounting by Tom Gurss Missouri Basin River Forecast Center National Weather Service Pleasant Hill, MO.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
City of Greeley Water & Sewer Department ● th Street, Suite 300 Greeley, CO ● (970) Making More Water Available.
How Do You Administer a Bird Call?. Sharing the Resource.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
SOUTH METRO WATER SUPPLY STUDY DECEMBER 2003 Stretching our Water Supplies South Metro Denver Area Gunnison Water Conference July 28, 2004.
La Grange Reservoir Turlock Lake Eastside Reservoir or Optional Canal West Satellite Reservoir Cattle Reservoir Turlock Lake South Pump Station Northwest.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Western Colorado vs. Eastern Colorado Where does your water go? Constance L. Danner 29 November 2005.
Slide 1 Infrastructure Plan − Improve Service Projects Oakdale Irrigation District August 17, 2005.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
11/31/08 South Feather Power Project (FERC Project No. 2088) PM&E Proposal January 31, 2008 Plumas National Forest, Oroville, CA.
SECURING THE WATER FUTURE OF THE HUNTER & CENTRAL COAST November 2006.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Slide 1 Oakdale Irrigation District Water Resources Plan “What We’ve Learned” October 2005.
California Water Jeffrey Kightlinger, General Manager
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
Water Supply Conditions February 28, 2014 Indian Valley & Sierra Valley.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
San Gabriel Valley From Stormwater to Supply
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
April This presentation contains forward-looking statements that are subject to significant risks and uncertainties, including statements related.
Meeting Colorado’s Future Water Needs: CWCB’s Role The Colorado Water Conservation Board.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
Water Resource Management Planning Update
Colorado Water 2016 Colorado Housing Council March 16, 2016
St. Louis District Biological Opinion RRAT
Summit County State of the River
North Georgia Water Resources Partnership Spring Annual Meeting/ Educational Seminar RUSSELL CREEK RESERVOIR April 25, 2018.
Water Resource Management Planning Update
Presentation transcript:

Northern Integrated Supply Project NSPE-Colorado State Meeting February 2010

Who is Northern Water?

NISP – A Participant Driven Project

C-BT Ownership Trends

Participant Supply and Demand

The NISP Proposal:

NISP Project Proposal 40,000 Acre-ft of New Yield 40,000 Acre-ft of New Yield Glade Reservoir Complex Glade Reservoir Complex South Platte Water Conservation Project South Platte Water Conservation Project Total Cost $490 Million Total Cost $490 Million Junior Water Rights Junior Water Rights

Glade Reservoir Hwy 14 Hwy 287 Proposed Glade Reservoir Location Approx. Dam Axis

Total storage = 170,000 af 260 feet deep 5 miles long 18 million CY of earthfill 1000 cfs diversion from Poudre River using existing Poudre Valley Canal 30,000 hp Pump Station Relocate Munroe Canal (6,000 ft Tunnel) Relocate HW 287 Glade Reservoir

S. Platte Water Conservation Project 60% of the 40,000 Acre-ft Yield 60% of the 40,000 Acre-ft Yield 1/3 NISP Cost 1/3 NISP Cost Repositions South Platte Water Repositions South Platte Water Partnership with Ag Instead of Buy and Dry Partnership with Ag Instead of Buy and Dry Substantially Reduces Storage to Yield from 10:1 down to 5:1 Substantially Reduces Storage to Yield from 10:1 down to 5:1

SPWCP Details 45,600 AF Galeton Reservoir 200 cfs Diversion from the South Platte 30 miles of pipeline 16,000 Hp Pumping Deliveries to New Cache & Larimer and Weld Ditch Systems Average 27,000 af/year

Phased Construction Schedule TASK Phase II Alt. Evaluation NEPA Galeton Res. Design/Constr SPWCP Pump & Pipe Design / Construct HW 287 Design HW 287 Construction Glade Design Glade Construction

NEPA Started: February 2004 Started: February 2004 Draft EIS: April 2008 Draft EIS: April 2008 Supplemental DEIS Complete: Mid-2011 Supplemental DEIS Complete: Mid-2011 Final Permit: 2012 Final Permit: 2012 Spent Approximately $8 Million to Date Spent Approximately $8 Million to Date Estimated EIS Cost of $10 Million Estimated EIS Cost of $10 Million

Environmental Issues Nearly All are Poudre River Related Nearly All are Poudre River Related Flow Reduction Flow Reduction Geomorphology Changes (Sediment) Geomorphology Changes (Sediment) Water Quality Water Quality Riparian (trees) Riparian (trees)

Lessons Learned NEPA Takes A LONG Time! NEPA Takes A LONG Time! Public Information Matters Public Information Matters Politics (the Yuck Factor) Politics (the Yuck Factor) Be Flexible-Are Enhancements Possible? Be Flexible-Are Enhancements Possible? Keep Your Sense of Humor!!!!!!! Keep Your Sense of Humor!!!!!!!