LBT Q1 2008 Eng/SW Review IIF – Instrument Interface Jose Borelli.

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
The Systems Development Lifecycle Your_Name_Here.
Chapter 10: Monitoring and Controlling Change
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
Systems Development (SD) Presentation Michael Webb IT Director for Medicaid Utah Department of Health UDOH Informatics Brownbag August.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
J. Large Binocular Telescope (LBT) Operational Readiness
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 2 December
LBT Q Software Review GCS – Guiding and Active Optics.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
OHT 20.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The components of project progress control Progress control of internal.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
ASPERA-3 June 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 6_25/ Page 1 Monthly Status Report Report due 6/25/01 Schedule statused.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
Q u a l i t y 1 Austin Energy Electric Service Delivery Quality Management System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
3.9 Introduction to project management Strand 3 Karley Holland.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
Advanced S/w Eng - s/w productivity issues 1 Software Productivity Issues Why do software projects fail? Advanced Software Engineering COM360 University.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
Physical Views Component: A component is a physical unit of implementation with well-defined interfaces that is intended to be used as a replaceable part.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Project Communication Management Manage Communications - Inputs Inputs Communications Management Plan Work Performance Reports Enterprise Environmental.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Engineering Review ENGG – Engineering General.
Updating instrument firmware
Presentation transcript:

LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli

4-Apr-2008LBT Q Eng/SW Review Progress Interface documentation in progress √ Interface documentation in progress √ Installation of CentOS, development tools, TCS/IIF, etc. for the following projects: Lucifer, LBTI and DIMM √ Installation of CentOS, development tools, TCS/IIF, etc. for the following projects: Lucifer, LBTI and DIMM √ Debugging / Additional changes in progress (Support for the new command return “warning” state, replacement of global constants with classes, etc. ) √ Debugging / Additional changes in progress (Support for the new command return “warning” state, replacement of global constants with classes, etc. ) √

4-Apr-2008LBT Q Eng/SW Review Open Issues Technical Technical None None Schedule Schedule None None Budget Budget None None Resource Resource None None

4-Apr-2008LBT Q Eng/SW Review Planning (Q2/2008) Design and Implementation of AO commands (Apr-May) Re-iteration on the rotator commands (Apr) Update and correct the Interface documentation Additional changes to support the communication with the DIMM.