Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PARCA: Contractual Overview TX Workgroup 27 th February 2013 Steve Pownall.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
© Energy UK April 2012 Transmission Workgroup – 4 th April Financial Commitment for Incremental Capacity Presentation by Energy UK
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Review Group 221: Option 3 – security provided after allocation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
European Developments Transmission Workgroup 3 rd May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Exit Capacity Release Methodology Statement
An alternative approach…..
Transmission Planning Code – Draft Document
Exit Capacity User Commitment – Transmission Workstream update
Transmission Planning Code
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
Capacity Methodology Statements
Mod 0452 (PARCA) – Further thoughts
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Draft Capacity & Connection Plan
Transmission Planning Code Review
Long Term Non Firm Capacity Update
PARCA Timeline.
Proposed Transitional Gas Exit Arrangements
Open Letter - Summary of Responses
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Capacity Access Review
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Cap/Con Update TX workgroup – 6 th December 2012

2 Purpose  Provide regular updates to Transmission workgroup on progress of cap/con  Including high level overview of key discussion points  Detail on next steps and plan to progress

3 Refresher 1 NG NTS cap/con objectives include:  Develop an industry wide consensus of approach to modify the regime considering the impacts of the Planning Act (2008)  Work together with our customers to ensure we meet their requirements  Flexible lead times to adapt to specific projects  Some projects may require a DCO for both NG and the customer  Some projects may require a DCO for just the customer  Some projects may not require a DCO at all etc.  Define a transparent capacity and connection process that provides greater certainty and flexibility to our customers

4 Refresher 2 Key aspects of the PARCA contract include:  Developers and/or Users are able to reserve Quarterly NTS Entry and/or Enduring NTS Exit (Flat) Capacity through a PARCA  Underpins work required to investigate build / no build options to provide the required capacity  Phased User Commitment up to point of capacity allocation  PARCA stages provide natural break points  Reserved unsold returns to market  PARCA signatory funds revenue allowance to cover spend / committed spend  Capacity financially committed to upon allocation to the User associated to the PARCA  Allocation subject to terms and conditions of the PARCA (e.g. relevant demo info provided)

5 Refresher 3  Potential changes to existing Entry Capacity release mechanisms include:  March QSEC  Incremental release not guaranteed  Demand for incremental may be met through substitution, existing capability or through non-obligated release  Ad-hoc QSEC  No longer for new ASEPs  National Grid NTS invite Users to book unsold capacity that may otherwise be reserved through a PARCA

6 Refresher 4 Potential changes to existing Exit Capacity release mechanisms include:  Enduring applications  Incremental release not guaranteed  Demand for incremental may be met through substitution, existing capability or through non-obligated release  Additional ad-hoc process  National Grid NTS invite Users to book unsold capacity that may otherwise be reserved through a PARCA

7 Key discussion points  User commitment – potential to introduce a reservation fee  Ad-hoc PARCA triggered QSEC / Enduring exit processes  Adds complexity to the solution - are these needed?  Establishing a stable need case  Fine tuning - when should a customer finalise their capacity requirement?  Multiple scenarios to consider  EU compliance  EU incremental in early stages of discussion  Transparency vs. confidentiality  The process needs to be transparent to both the PARCA signatory and industry, but customer confidentiality needs to be considered  Demonstration information  What happens if a date is not agreed? default date applies or dispute process introduced?  Break points / hiatus / deferment time frames  Funding

8 What changes are currently in scope? The changes we currently envisage include:  UNC  Introduction of the PARCA (in the same way ARCAs are currently referred to in UNC) and changes to the existing release mechanisms  PARCA contract  Break out points, funding, security, demonstration requirements, schedules etc  Capacity Methodology Statements  To align with UNC changes, PARCA contract principles and potential licence changes  Licence changes  Potentially as per National Grids RIIO-T1 business plan – two stage revenue drivers, lead time of 24 months, lead time incentive review / change  Revenue driver methodology  To align with licence  Determination of revenue drivers linked to the release of incremental entry and exit capacity  Charging  Potentially targeted versus socialised for stage 1 revenue driver, managing impact of revenue lag from capacity sales,  Others?  Potential changes to generic NeXAs, NEAs, Storage Connection Agreements, CSEP agreements?

9 High level view of progress needed over next 6 months  Our Aim is to have a solution that is implementable for April 2014 Dec-12 Further Review of Business Rules & Processes Draft PARCA contract framework produced and discussed Jan-13 Funding - Security / Charge and Revenue Drivers Principles Feb-13 Demonstration Info and Dates / Publication of Information finalised Contract Mechanics e.g. termination / Confidentiality / Transferability Mar-13 Development of Incentives CAP/CON Mod Drafted Draft UNC Businesses Rules agreed Draft UNC legal text produced Draft PARCA contract produced Apr-13 Formal UNC CAP/CON Mod submitted to panel for workgroup development Formal UNC Businesses Rules produced for workgroup development PARCA document developed May-13 Development of Final End to End Processes Discuss Methodology Statement changes Licence changes discussed