JRA2 - IDEA Zaragoza, 7.11.2005 Andrea Giuliani University of Insubria (Como) and INFN - Milano.

Slides:



Advertisements
Similar presentations
Results from CUORICINO and Prospects for CUORE (Cryogenic Underground Observatory for Rare Events) S. Cebrián, on behalf of the CUORE Collaboration Università
Advertisements

Boulby Canfranc Modane (Fréjus) Gran Sasso Pyhalsami “ILIAS-next” is a proposed FP7 Integrating Activity that will represent at the highest level the Underground.
Surface Sensitive Bolometers (SSB): last development MARISA PEDRETTI INFN - Milano.
Stefano Pirro, IDEA Meeting –Milano November Status of the scintillating bolometer program Scintillating Bolometers Background rejection capabilities.
Progress of TG-1 activities (refurbishment of Phase-I detectors) Stefan Schönert on behalf of TG 1 GERDA general meeting Tuebingen, Nov. 9-11, 2005.
GERDA: GERmanium Detector Array
Erice, Kai Zuber1 Status of the COBRA Experiment K. Zuber, TU Dresden.
JRA1 7th General Meeting. Zaragoza, Nov 2007 JRA1 web page 1 Zaragoza, 23th November 2007 JRA1 7th General Meeting Low background.
WP3: R&D on ultra low-level WP3: R&D on ultra low-level detectors and facilities JRA1 general meeting, Paris, Feb. 14 th 2006.
WP3: R&D on ultra low-level detectors and facilities WP3: R&D on ultra low-level detectors and facilities status and outlook Matthias Laubenstein JRA1.
JRA1 6th General Meeting. LNGS, May 2007 JRA1 web page 1 LNGS, 28th May 2007 JRA1 6th General Meeting Low background techniques.
WP3: R&D for ultra-low background techniques and facilities in the EU underground labs Dr. Matthias Laubenstein Laboratori Nazionali del Gran Sasso ITALY.
From CUORICINO to CUORE: To probe the inverted hierarchy region On behalf of the CUORE collaboration DUSL Meeting, Washington DC November 2,-4, 2007 Frank.
Daniel Lenz, University of Wisconsin, Madison 11/05/ APS DNP Cryogenic search for neutrinoless double beta decay Daniel Lenz on behalf of the CUORE.
JRA1 3rd General Meeting. Paris, February 2006 JRA1 web page 1 Introduction: Status of the activity, tasks and deliverables.
Neutron background measurement at LNGS: present status Measurement carried out in collaboration between LNGS ILIAS-JRA1 and ICARUS groups.
Proposal for high sensitive measurements of 238 U and 232 Th with NAA Ezio Previtali INFN Sez. Milano Milano-Bicocca University ILIAS: JRA1 3rd General.
Outline  WG2 (bank of pure isotopes)  WG3 (theory)  WG3 (Neodimium project - preliminary tests on Nd crystals)  WG4 (cosmogenics - code survey - exposure.
LNGS Capelli Silvia on behalf of CUORE Collaboration
Stefano Pirro LRT-2004 Sudbury December 13, 2004 Cleanliness backgrounds and surface contaminations in Cuore Stefano Pirro INFN-Milano.
CUORICINO and CUORE Chiara Brofferio Università di Milano – Bicocca and INFN, Sez. di Milano NOW 2004 – Otranto 12 – 17 September 2004 On behalf of the.
Solar Cell Fundamentals Lab All safety rules to be followed at all times Full gowning is required when working in the clean room The clean room will only.
Underground Crystal Growth Natural division TeO 2 growth Ge growth A. Giuliani / J. Morales  For Ge, cosmogenics is very critical  For Te, role of cosmogenics.
LUCIFER a potentially background-free approach to the search for 0  Claudia Nones CSNSM/CNRS-Orsay NOW2010 – September 4 th - 11 th, 2010 – Conca Specchiulla,
From Cuoricino to CUORE: towards the inverted hierarchy region Andrea Giuliani On behalf of the CUORE collaboration University of Insubria (Como) and INFN.
Status of COBRA 6 th SNOLAB Workshop, Picture courtesy
Stefano Pirro, IDEA Meeting Como April, Nd Project Why not 150 Nd experiments so far ? Bolometers requirements Nd crystals Time schedule Working.
Stefano Pirro, IDEA Meeting -Zaragoza November 7, Nd Project High Temperature Thermistors News about NdGaO 3 Scintillating Bolometers Conclusions.
THE CUORE EXPERIMENT: A SEARCH FOR NEUTRINOLESS DOUBLE BETA DECAY Marco Andrea Carrettoni on behalf of the CUORE collaboration 2 nd International Conference.
Underground Crystal Growth Marisa Pedretti. Participants INFN (ITALY) LNGS Como Milano-Bicocca Contractor Lawrence Berkeley National Laboratory University.
SICCAS visit - Background in TeO2 powder - Crystal dimension accuracy
Topical Workshop in Low Radioactivity Techniques, Sudbury, Canada, August 28-29, 2010 Surface cleaning techniques B. Majorowits a, M. Wójcik b, G. Zuzel.
Present status of CUORE / CUORICINO Andrea Giuliani Università dell’Insubria and INFN Milano 3rd IDEA meeting, Orsay, April 14 – 15, 2005.
1 IRMM actions in IDEA Mikael Hult Institute for Reference Materials and Measurements (IRMM) Geel, Belgium
Operation of bare Ge-diodes in LN/LAr 1 st IDEA meeting Como, April 8 (2004) Stefan Schoenert.
LIGO-G D LIGO R&D1 Advanced LIGO R&D Review The PSL Peter King & Rich Abbott October 8, 2002.
JRA2 - IDEA Prague, 20/04/2006 Andrea Giuliani University of Insubria (Como) and INFN - Milano.
Status of Surface Sensitive Bolometers University of Insubria – Como, Italy INFN – Milano, Italy Prague, Chiara Salvioni.
ILIASN4 Cascina, November 3rd, 2005Dominique Lalanne.
The CUORE experiment Thomas Bloxham Lawrence Berkeley National Lab PHENO 2011 May 9th 2011.
M. Wójcik for the GERDA Collaboration Institute of Physics, Jagellonian University Epiphany 2006, Kraków, Poland, 6-7 January 2006.
Half Day IoP Meeting: Neutrinoless Double Beta Decay, University College London, Great Britain The GERDA Experiment at Gran Sasso Grzegorz Zuzel.
M. Wójcik Instytut Fizyki, Uniwersytet Jagielloński Instytut Fizyki Doświadczalnej, Uniwersytet Warszawski Warszawa, 10 Marca 2006.
Cracow Epiphany Conference on Physics in Underground Laboratories and its Connection with LHC Cracow, Poland The GERDA Experiment at Gran.
Bank of Pure Isotopes Ezio Previtali INFN Sez. Milano Department of Physics University of Milano Bicocca.
Stefano Pirro – NuMass 2010 Stefano Pirro Double beta decay searches with enriched and scintillating bolometers - Milano - Bicocca The Future of Neutrino.
Rare Isotopes (Enriched Isotopes for Astroparticle Physics) Ezio Previtali INFN and University of Milano Bicocca Aspera meeting on “R&D and Astroparticle.
Results obtained with large mass surface sensitive detectors Zaragoza -November 7, 2005 University of Insubria - Como, Italy INFN - Milano, Italy.
1 Study of 48 Ca Double Beta Decay by CANDLES T. Kishimoto Osaka Univ.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
1 Underground Gamma-ray Spectrometry in HADES Mikael Hult Institute for Reference Materials and Measurements (IRMM) Geel, Belgium
Solid State Synthesis Czochralski Method
Proposals for FP7 Zaragoza November 2005, IDEA meeting F. Piquemal (CEN Bordeaux-Gradignan)
1 DarkSide Collaboration APC Paris, France Augustana College, USA Black Hills State University, USA Fermilab, USA IHEP, China INFN Laboratori Nazionali.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
ArchPbMoO4 scintillating bolometers as detectors to search for neutrinoless double beta decay of 100Mo Serge Nagorny INFN – Gran Sasso Science Institute,
New Mask and vendor for 3D detectors
The CUORE experiment Marisa Pedretti INFN Milano Bicocca.
Pulse-shape discrimination with Cs2HfCl6 crystal
Agenda A. Caldwell overview 15'
Introduction to IDEA Outline Andrea Giuliani What is IDEA ?
From Cuoricino to CUORE: approaching the inverted hierarchy region
Serge Nagorny – GSSI-INFN
The SABRE Crystals Frank Calaprice.
INFN Sezione di Roma, ITALY
Summary of TG2-Meeting New Detectors for GERDA Phase-II
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
PWO Crystal Production and Quality Control at SIC
Bunker Project Schedule/Budget
Integrated Double-beta-decay European Activity
Presentation transcript:

JRA2 - IDEA Zaragoza, Andrea Giuliani University of Insubria (Como) and INFN - Milano

IDEA: presentation of the tasks  I1 - Isotope enrichment  P Se project  P Nd project  B1 - Cosmogenic induced activity  B2 - Underground crystal growth  B3 - Rejection of surface radioactivity  B4 - Ge diodes in liquid nitrogen promising nuclides background control

Milestones/deliverables to be achieved within 31/3/2006

Financial situation requested prefinancing for second 18 months [Apr Sept 2006] and expenses in [Apr Sept 2005] CNRSINFNUNIZARCTUJYUMPIKEKUTMiniGRAILFMFI-UKUCLIRMM requested- prefinancing direct costs personnel equipment consumable travel total ratio (%) total/prefin (d.c.)

B2 – Underground crystal growth New contractor: IRMM

B2 – Ge crystal growth IRMM (Geel) New contractor UMICORE (Olen) Largest producer of Ge in the world CANBERRA (Olen) Company specialized in semiconductor detector development HADES (Mol) uderground lab (230 m of rock) steps for Ge detector realization: 1. reduction of GeO 2 (10 ppb impurities) 2. poly- and mono-zone refinement (1 and 0.01 ppb) 3. pulling (0.001 ppb) 4. diode fabrication crystal growth in principle, all the steps can be made underground in practice, too expensive good alternative: minimize CR exposure between steps

CANBERRA UMICOR IRMM HADES ~ 10 km B2 – Ge crystal growth

B2 – TeO 2 crystal growth 4 detectors from CTI with final CUORE size will be ready in Feb 2006 They will be operated in a clean environment after surface treatment Recent effort  to study the possibility of replacing Bridgman method (SICCAS) with Czochralski method (CTI, IPI) get rid of Pt impurities from the crucible ( 190 Pt is radioactive) A 3x3x3 cm crystal procured from CTI company The crystal was operated as a detector for two runs in Gran Sasso (Hall C refrigerator - R&D for DBD bolometers) The technical bolometric performance was excellent High surface radioactivity  not possible to set meaningful limits on the bulk impurities (U, Th, Pt)

B2 - R&D Contract between LLNL and CTI  Phase 1 : Redesign of CTI furnace to grow 75 mm diameter TeO 2 crystals (completed)  Phase 2:Production of one TeO 2 crystal large enough for 5x5x5 cm cube (target date: 30/9 – 31/12)  Phase 3:Delivery of 4 each 5x5x5 cm finished TeO 2 crystals (target date: 31/12/05 – 31/3/06)  Phase 4 : Successful test of 5x5x5 cm TeO 2 crystals as bolometers at LNGS (within 10 weeks of delivery) Important stimulus from IDEA: - visit to CTI company and preliminary agreement - discussion on crystallization procedure - purchase of a 3x3x3 cm 3 crystal

Need to work with them to develop clean procedures for crystal production  clean materials  strict procedures  clean room operation Visit planned for Nov. 14  prepared list of topics to be discussed  tour new production facility B2 - SICCAS (Shanghai) option

B2 - SICCAS (Shanghai) discussion plan

Web site in progress