OPSM 301 Operations Management Class 5: Business process flows: Analysis Koç University Zeynep Aksin

Slides:



Advertisements
Similar presentations
Schedule of Cost of Goods Manufactured
Advertisements

Operations Management Process Analysis and Applications Module
Process Analysis and Applications Module
Flow Rate and Capacity Analysis
7Apx--1 College Accounting Heintz & Parry 20 th Edition.
Slide 1Time and Throughput Management & Improvement© Van Mieghem Bottleneck Management and Improvement  Time and Throughput: –Critical Path vs. Bottleneck.
Petty Cash Balance Sheet Debit Current Asset. Loss on Plant Asset Income Statement Debit Other Expense.
Lin/Operations/Process Analysis & Apps1 Process Analysis and Applications Module u Operational Measures: Time T, Inventory I, Throughput rate R »Link to.
OM&PM/Class 2b1 1Operations Strategy –Class 1a: Introduction to OM –Class 1b: Strategic Operational Audits 2 Process Analysis –Class 2a + 2b: Process Flow.
LOGO Process Flow Measures MM – OM Session 2a Henry Yuliando.
1 3. Process Flow Measures MBPF Inc.: Consolidated Income Statement.
Operations Management: Process Analysis and Applications Module
Process Analysis and Applications Module
The Financial Statements
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Chapter 3. SALES SALES - Cost of Goods Sold GROSS PROFIT GROSS PROFIT - Operating Expenses OPERATING INCOME (EBIT) OPERATING INCOME (EBIT) - Interest.
Cost Accounting Allocation of Overhead MB-664 May 2009.
Flow Rate and Capacity Analysis
For the year ended December 31, 2005
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
The Master Budget and Flexible Budgeting
1 Copyright  2010 & 2007 McGraw-Hill Australia Pty Ltd PPTs t/a Accounting: What the Numbers Mean 2e (revised) by Marshall, McCartney & Van Rhyn PowerPoint.
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Operations Managment Kristen’s Cookie - Lecture 4 (Chapters 4 and 5)
13-1 CHAPTER 13 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Accounting and Reporting Systems.
Based on the book: Managing Business Process Flows.
Accounting and Financial Decisions
2 Chapter Two Basic Cost Management Concepts and Accounting for Mass Customization Operations.
OPSM 501: Operations Management Week 6: The Goal Koç University Graduate School of Business MBA Program Zeynep Aksin
5 C H A P T E R Operating Budgets.
IE 475 Advanced Manufacturing Costing Techniques
Production, Marketing and Administrative costs Manufacturing companies convert materials into finished goods. There are two type of costs involved here:
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Cost Terms, Concepts and Classifications Chapter Two.
6 - 1 © 2005 Accounting 1/e, Terrell/Terrell Completing the Accounting Cycle and Preparing Financial Statements Chapter 6.
Analyzing Financial Statements For Investing and Credit Decisions.
The Financial Statements Presentations for Chapter 2 by Glenn Owen.
1 The types of companies: 1. Understanding The Business Service Company: A company that provides intangible services, rather than tangible products Merchandising.
OPSM 501: Operations Management Week 4: Process analysis Kristen’s Cookie Koç University Graduate School of Business MBA Program Zeynep Aksin
1 Understanding the Financial Statements Lecture No.35 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Chapter 17-1 Chapter 17 Statement of Cash Flows Accounting Principles, Ninth Edition.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Basic Cost Management Concepts and Accounting for Mass Customization.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Chapter 41 Cash, Short-term Investments and Accounts Receivable Chapter 4.
Chapter 17 Job Order Costing
OPSM 405 Service Operations Management
C H A P T E R 5 Operational Budgets. Learning Objective 1 Describe the importance of personal budgeting.
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
0 CHAPTER 3 Product Costing: Manufacturing Processes, Cost Terminology, and Cost Flows © 2009 Cengage Learning.
CORNERSTONES of Managerial Accounting, 5e © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
MGT 497 Financial Statements Prof. Rick Hayes, Ph.D., CPA.
PREPARE THE FOUR FINANCIAL STATEMENTS 1. INCOME STATEMENT 2. RETAINED EARNINGS STATEMENT 3. BALANCE SHEET 4. CASH FLOW STATEMENT.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
STATEMENT OF CASH FLOWS Prepared by James R. Reap
Key Learnings: Little’s Law
Job-Order Costing: A Microsoft Excel-Based Approach
Theoretical Capacity Theoretical capacity: The capacity (throughput rate) of a process under ideal conditions (units / time) Effective capacity: The capacity.
Introduction to Cost Accounting and the Job Order Cost Cycle
Accounting and Financial Decisions
Basic Cost Terminology
Standard Cost Systems: A Financial Reporting Perspective Using Microsoft Excel Appendix 10B.
Cost Accounting and Reporting Systems
Lecture 08.
Preparing the Statement of Cash Flows by the Direct Method
Cost Accounting-I Recording System.
MBPF Inc.: Consolidated Income Statement
Cornerstones of Managerial Accounting, 6e
Product Costing Session Five MBA 502B Managerial Accounting
Internal Planning and Measurement Tools
Budgeting for Planning and Control
The Master Budget and Flexible Budgeting
Presentation transcript:

OPSM 301 Operations Management Class 5: Business process flows: Analysis Koç University Zeynep Aksin

Office Hours  My office hours, slight modification –Mon  TA’s office hours –TA: Canan Uckun, IEOM Graduate Student –Tuesday-Thursday 15:30-17:00 ENG 218  My office hours modified –Monday 13:00-15:00

Announcements  First set of study questions  Benihana to be discussed on 13/10 Thursday –Read the case, be prepared to discuss –Mini-quiz as part of class participation grade  Kristen’s due 18/10 Tuesday  First quiz on 18/10

Example: Focusing Improvement Efforts  MBPF operations called for the purchase of both sheet metal (raw materials) and prefabricated bases (purchased parts). Garages were made in the fabrication area from sheet metal and then assembled with prefabricated bases in the assembly area. Completed garages were stored in the finished goods warehouse until they were shipped to customers  Analyze the firm’s income statement, balance sheet, and cost of goods sold to determine in which department process improvements have the greatest impact on working capital

Definition: working capital  Working capital requirements include the value of inventories in the process and the value of any accounts receivable. Any reduction in working capital reduces the firm’s interest expense and makes extra cash available for other investments.

Consolidated Statements of Income and Retained Earnings  NET SALES250.0  COSTS AND EXPENSES –Cost of goods sold175.8 –Selling, general and administrative expenses 47.2 –Interest expense 4.0 –Depreciation 5.6 –Other (income) expenses 2.1 –TOTAL COSTS AND EXPENSES234.7  INCOME BEFORE INCOME TAXES 15.3  PROVISION FOR INCOME TAXES 7.0  NET INCOME 8.3  RETAINED EARNINGS, BEG. OF YEAR 31.0  LESS CASH DIVVIDENDS DECLARED 2.1  RETAINED EARNINGS AT THE END OF YEAR 37.2  NET INCOME PER COMMON SHARE 0.83  DIVIDENDS PER COMMON SHARE 0.21

Consolidated Balance Sheet of Dec. 31, x Current Assets Cash2.1 Short-term investments at cost3.0 Receivables, less allowances of $0.7 mil 27.9 Inventories 50.6 Other current assets4.1 TOTAL CURRENT ASSETS 87.7 Property, Plant, and Equipment (at cost) Land 2.1 Buildings 15.3 Machinery and equipment 50.1 Construction in progress 6.7 Subtotal 74.2 Less accumulated depreciation 25.0 NET PROPERTY, PLANT, AND EQUIPMENT 49.2 Investments 4.1 Prepaid expenses and other deferred charges 1.9 Other assets 4.0 TOTAL ASSETS 146.9

Inventories and Cost of Goods Details Cost of Goods Sold –Raw Materials50.1 –Fabrications (Labor and Overhead) 60.2 –Purchased Parts (Labor and Overhead)40.2 –Assembly (Labor and Overhead)25.3 –TOTAL Inventory –Raw Materials (roof) 6.5 –Fabrications WIP (roof)15.1 –Purchased Parts (base) 8.6 –Assembly WIP10.6 –Finished goods 9.8 –TOTAL50.6

Process Flows Raw materials Purchased Parts Fabrication AssemblyFinished goods $50.1/yr $40.2/yr $60.2/yr$25.3/yr $6.5$15.1$110.3/yr $8.6 $40.2/yr $10.6$9.8 $175.8/yr

Detailed look at Inventories and Flow times Raw materialsFabrication Purchased parts AssemblyFinished goods $6.5$15.1 $8.6 $10.6 $9.8 $175.8/yr $60.2/yr $25.3/yr $50.1/yr $40.2/yr 6.75 week 7.12 week 3.14 weeks2.90 weeks weeks 110.3/yr

Inventory Value Representation CT (week) TH (mil/week) Purchased Parts Raw materials Fabrication Assembly Finished goods Accounts Receivable

Operational Measure: Flow Time Driver: Activity Times, Critical Activity  (Theoretical) Flow Time  Critical Activity  Flow Time efficiency =

Most time inefficiency comes from waiting: E.g.: Flow Times in White Collar Processes

Critical Path & Critical Activities  Critical Path: A path with the longest total cycle time.  Critical Activity: An activity on the critical path. AB C D

X-Ray Service Process  1. Patient walks to x-ray lab  2. X-ray request travels to lab by messenger  3. X-ray technician fills out standard form based on info. From physician  4. Receptionist receives insurance information, prepares and signs form, sends to insurer  5. Patient undresses in preperation of x-ray  6. Lab technician takes x-ray  7. Darkroom technician develops x-ray  8. Lab technician checks for clarity-rework if necessary  9. Patient puts on clothes, gets ready to leave lab  10. Patient walks back to pysicians office  11. X-rays transferred to physician by messenger

Example startend 25% 75% transport support Value added decision Measured actual flow time: 154 minutes 8

Levers for Reducing Flow Time  Decrease the work content of critical activities –work smarter –work faster –do it right the first time –change product mix  Move work content from critical to non-critical activities –to non-critical path or to ``outer loop’’  Reduce waiting time.

Operational Measure: Capacity Drivers: Resource Loads  (Theoretical) Capacity of a Resource  Bottleneck Resource  (Theoretical) Capacity of the Process

X-Ray revisited Resource Pool Res. Unit Load Load Batch Theoretical Capacity of Res. unit No of units in pool Theoretical capacity of pool Messenger40 min/patient 11.5 patients/hr 69 Patient/hr Receptionist51121 X-ray technician X-ray lab Darkroom technician Darkroom Changing room

Utilizations given an observed throughput of 5.5 patients/hr Resource poolTheoretical capacity Patients/hr Capacity utilization Messenger Receptionist X-ray technician X-ray lab Darkroom technician Darkroom Changing room

Levers for Increasing Process Capacity  Decrease the work content of bottleneck activities –work smarter –work faster –do it right the first time –change product mix  Move work content from bottlenecks to non-bottlenecks –to non-critical resource or to third party  Increase Net Availability –work longer –increase scale (invest) –increase size of load batches –eliminate availability waste

Increasing Process Capacity in the Smiley Factory  Focus on the bottleneck –“ ensure the bottlenecks’ time is not wasted” increase availability of bottleneck resources eliminate non-value added work from bottlenecks –reduce/eliminate setups and changeovers synchronize flows to & from bottleneck –reduce starvation & blockage –“ the load of the bottlenecks (give it to non-bottlenecks)” move work from bottlenecks to non-bottlenecks need resource flexibility – unit capacity and/or #of units. invest

The role of variability 6/hr 4 or 8/hr 2 or 10 0 or 12 As variability increases, throughput (rate) decreases

Compounding effect of variability and unbalanced task times 6/hr4/hr 4 or 8/hr 2 or 6/hr 2 or 100 or 8 4/hr 3.5/hr 2.5/hr

Summary of fundamental process principles  identify and eliminate bottlenecks  reduce as much variability as possible  eliminate handoffs, improve communication to minimize resource interference