S. Brambilla, “Recent DAQ integration test at L.N.L. 05-09 May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008 7 th AGATA Week Uppsala, 8-11 July 2008 Recent.

Slides:



Advertisements
Similar presentations
Roma, P. Camarri DAQ & on-line monitoring at X5 (G. Aielli, P. Camarri) DAQ realization and performance for RPC tests at X5-GIF. Adds and changes.
Advertisements

1 iTOP Electronics Effort LYNN WOOD PACIFIC NORTHWEST NATIONAL LABORATORY JULY 17, 2013.
Slink TX Slink merger Teststand setup Slink merger firmware and testing Firmware features - DAQ RAMs for saving out input and output data - Possible to.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
EGAN FEE synergy Working Group PROMETEO Workshop on Front-End Electronics for gamma and complementary detector systems November 2011I IFIC – Valencia.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Time stamping with CAEN V1290N Bled, 26 th – 28 th March 2008 Dušan Ponikvar, Dejan Paradiž Faculty of Mathematics and Physics Ljubljana, Slovenia.
DDL hardware, DATE training1 Detector Data Link (DDL) DDL hardware Csaba SOOS.
E906/Drell-Yan: Monte Carlo, Data Acquisition and Data Analysis Paul E. Reimer Expected Rates and Monte Carlo (WBS 2.5.1) Data Acquisition (WBS 2.4) –CODA.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
UCN-nEDM DAQ DAQ and Slow Control L.Lee 1 July 3, 2013.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Coupling Neutron Detector array (NEDA) with AGATA The AGATA Front-End processing Electronics & DAQ The AGATA Trigger and Synchronization (GTS) Coupling.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Agata Week – LNL 14 November 2007 Global Readout System for the AGATA experiment M. Bellato a a INFN Sez. di Padova, Padova, Italy.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
CMS ECAL Week, July 20021Eric CANO, CERN/EP-CMD FEDkit FED Slink64 readout kit Dominique Gigi, Eric Cano (CERN EP/CMD)
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
AGATA The Advanced Gamma Ray Tracking Array Ancillary Detector and Integration W.G. Status of the Working Group and Tasks A.Gadea.
W.Skulski APS April/2003 Eight-Channel Digital Pulse Processor And Universal Trigger Module. Wojtek Skulski, Frank Wolfs University of Rochester.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
Domino Ring Sampler (DRS) Readout Shift Register
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
1 Level 1 Pre Processor and Interface L1PPI Guido Haefeli L1 Review 14. June 2002.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Ba A B B1 FADC B2 SD_FP FLEX_I/O ROC VME64x A: [ HELICITY, HELICITY_FLIP ] (NIM or ECL) Port 1 Port 2 a: [ HELICITY, HELICITY_FLIP ] (LVDS) B: [ HELICITY_TRIGGER,
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
FPGA based signal processing for the LHCb Vertex detector and Silicon Tracker Guido Haefeli EPFL, Lausanne Vertex 2005 November 7-11, 2005 Chuzenji Lake,
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
DeLiDAQ-2D ─ a new data acquisition system for position-sensitive neutron detectors with delay-line readout F.V. Levchanovskiy, S.M. Murashkevich Frank.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
CCS Hardware Test and Commissioning Plan
Recent R&D Milestones at GRAPES-3
ETD meeting Electronic design for the barrel : Front end chip and TDC
The DZero DAQ System Sean Mattingly Gennady Briskin Michael Clements
Hall A Compton Electron detector overview
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
Front-end electronic system for large area photomultipliers readout
New Crate Controller Development
Example of DAQ Trigger issues for the SoLID experiment
AGATA WEEK Uppsala 7-11 July 2008
The CMS Tracking Readout and Front End Driver Testing
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
TELL1 A common data acquisition board for LHCb
Presentation transcript:

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent DAQ integration test at L.N.L May 2008 S. Brambilla I.N.F.N. Sezione di Milano

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008 Test Goals: VME test bench from I.N.F.N. Milano has been used check the AGAVA CBLT functionalities at realistic trigger rates probe the compatibility of the AGAVA production release with the new version of the GTS (GTS release 2), based on the Virtex 4 FPGA STRUCK SIS1100/SIS3100 PCI/cPCI to VME interface AGAVA board release 1 and 2, GTS release 1 and 2 CAEN V channel TDC CAEN V channel ADC CAEN V538A 8 channel NIM-ECL/ECL-NIM Translator CBLT sequence: Agava, TDC, ADC NIM Repetitive pulser at 20KHz

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008 Software environment: Kmax dedicated application was used to control the VME modules. STRUCK board is equipped with DSP, memory and NIM and ECL I/O - Readout has been performed by the DSP (SHARC ADSP-21062L) Events stored and presorted in circular buffers (800 events x buffer) - Buffers readout and online sorting by kmax software DSP Acquisition logic: wait local trigger (Struck Lemo1 input) wait validation (Struck Lemo2 input) wait AGAVA, TDC and ADC data ready (single vme access) CBLT or standard readout of AGAVA, TDC and ADC modules Integrity check of the event (header, data and trailers) Check event counter alignment for TDC and ADC Buffer handling

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008 Test summary: Acquisition rate ≈ 10KHz both in single and in CBLT access System stability: 8 hours test without any problem (repetitive) All the ≈ 300 Ml. of events were good and well formatted VME standard compatibility tests and functionality of the AGAVA_2 module with the GTS_2 has been proved Information concerning event trigger and event validation were passed correctly between the AGAVA_2, GTS_2 and external LEMO connector Consistency of Local Trigger Tag / Validation Tag has been verified (new GTS firmware was giving only validation)

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008 Front End based on CAEN modules: V775: 32 channels TDC V879: 32 channels TDC V785: 32 channels ADC V878: 32 channels ADC V792: 32 channels QDC V812: 16 channels CFD V560: 16 channels scaler Readout : VME CPU Optical link PCI to VME interface PCI to VME interface: CAEN V2718 STRUCK SIS1100/SIS3100 L.N.L. LINCO CMS board Hardware:

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008 Tests with CAEN V2718 PCI to VME controller have been planned Next tests: Use of a dedicated PCI I/O board - Local trigger, validation-reject trigger.. - data ready, reset, fast clear... Extended tests with high rate random pulser or detectors, both with STRUCK SIS1100/SIS3100 and CAEN V2718 pci-to-VME interface

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008 Thank you !

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008 Test with the Struck SIS1100/SIS3100 PCI to VME interface (optical link) PC SetUp: Pentium 4 PC, 3.00 GHz, 1Mb RAM, SIS1100 pci board XP environment and Kmax software VME SetUp: SIS3100 with DSP (ADSP21061L), 512MB memory, NIM-ECL Interface One 32 channel VME TDC (V879) One 32 channel VME ADC (V878) Local latency 1  s for local trigger and GTS latency 6  s for Trigger_Validation and Trigger_Reject from AGAVA board have been simulated using NIM EG&G GG800 Trigger_Request, Trigger_Validation and Trigger_Reject have been carried to the SIS3100 NIM inputs

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008 DSP is controlled by Kmax using common shared memory DSP receives triggers and organise data into memory in 4 buffers of longwords Local events are composed of 12 longwords (8 data plus headers and trailers) Buffers are read by Kmax as single memory blocks Trigger_Reject has been done by 2 single broadcast DSP VME cycle Test done both in single accesses and in CBLT mode

S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July 2008