ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, 17-19 June 2014 ACA planning Manabu Watanabe, George Kosugi NAOJ.

Slides:



Advertisements
Similar presentations
Telecommunications & Networking
Advertisements

Networking at Home the Office and Globe
Implementation of cellular type approval software for an open source embedded device Thesis presentation Author: Mathias Nyman Supervisor: Professor.
1 Software Engineering Lecture 11 Software Testing.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
Linux Migration GBT e2e Software Review May 3, 2005 Ramon Creager Melinda Mello
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 15 Finalizing.
The importance of switching in communication The cost of switching is high Definition: Transfer input sample points to the correct output ports at the.
Target Electronics 27 th November Overview Current System is composed of many discrete units with separate processors that do not talk to each other.
DP Cabinet.
SGI Confidential Application Processor. SGI Confidential Application Processor Overview Application Field Replaceable Units The Application.
Session 13 Page 11 ECE361 Engineering Practice Verification & Test Plan.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
1 CSc Senior Project Software Testing. 2 Preface “The amount of required study of testing techniques is trivial – a few hours over the course of.
Word Processing, Web Browsing, File Access, etc. Windows Operating System (Kernel) Window (GUI) Platform Dependent Code Virtual Memory “Swap” Block Data.
Building Information Systems lesson 26 This lesson includes the following sections: The Systems Development Life Cycle Phase 1: Needs Analysis Phase.
SimPhonics, Inc. SimPhonics SMx Audio System. SimPhonics, Inc. V+ Visual Programming Language SMx Audio System Various I/O Drivers VComm Networked Audio.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
S1.6 Requirements: KnightSat C&DH RequirementSourceVerification Source Document Test/Analysis Number S1.6-1Provide reliable, real-time access and control.
Hands-On Microsoft Windows Server 2003 Administration Chapter 2 Managing Windows Server 2003 Hardware and Software.
Grob Systems, Inc., the customer, requires an industrial computer system that will have a function of acquiring raw data, processing the data, presenting.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
DMM4020 Digital Multimeter Fact Sheet Measurements with the Push of a Button Features Featuring:  5.5 digit resolution  Basic V dc accuracy of up to.
ALMA Integrated Computing Team Coordination & Planning Meeting #4 Santiago, November 2014 Reporting Software Principles M Chavan, ESO R Soto, ALMA.
Prison Solutions: RF Jamming Active & Reactive RF Jamming to combat Contraband Cellular Phones in Prisons and Government Facilities.
1 Weblite Product Introduction. 2 Control Equipment via the Internet 8 Universal Inputs 8 Universal Outputs software selectable as analog or digital signals.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 ACA plan Manabu Watanabe National Astronomical Observatory.
Software Status Sonja Vrcic Socorro,
The Next Generation of Sub- Millimeter Receiver Control Steward Observatory Symposium Feb 26-27, 2008 Steward Observatory Symposium Feb 26-27, 2008 Thomas.
©UNT in partnership with TEA1 Telecommunications & Networking Unit Subtitle: Modems.
Samantha. What is it? –It is a Wi-Fi interface for the Lego Mindstorms –It replaces the Bluetooth connection for running matches It is mostly for running.
Module 2 Part I Introduction To Windows Operating Systems Intro & History Introduction To Windows Operating Systems Intro & History.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
Configuration Mapper Sonja Vrcic Socorro,
CCSDS SOIS Working Group Meeting – Berlin, Germany 14th of October 2008 Prototyping of CCSDS SOIS services on 1553 Bus Sev Gunes-Lasnet, Olivier Notebaert.
ICALEPCS 2005 Geneva, Oct. 12 The ALMA Telescope Control SystemA. Farris The ALMA Telescope Control System Allen Farris Ralph Marson Jeff Kern National.
WHQL Code Coverage Prototype Program Andy Wen. 2 Agenda What is Code Coverage Prototype Program? What is Code Coverage Prototype Program? A prototype.
ESO, 17 April 2007ESAC meeting1 ALMA offline User Test 5 Silvia Leurini, ESO.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Benchmark 2 progress report and future directions Sergey Lyskov
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 Online system tools and Control's scope expansion Rafael Hiriart.
Business-logic Layer Presentation Layer Network Layer Digital Signal Processing Layer SmartHome API SmartHome Software Architecture SH mobile application.
Toward Geant4 version 10 Makoto Asai (SLAC PPA/SCA) For the Geant4 Collaboration Geant4 Technical Forum December 6 th, 2012.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
How to Recover Deleted Photos from Android Cell Phone? Android is keeping on improving their products and make sure to provide the best software service.
Wyoming Technology Readiness February Agenda Wyoming Training - Feb Technology Readiness  Schedule of events  Components and System Requirements.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 17 Supporting Modems.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ALMA Correlator.
Windows Vista Configuration MCTS : Installing and Upgrading.
Constructing a system with multiple computers or processors 1 ITCS 4/5145 Parallel Programming, UNC-Charlotte, B. Wilkinson. Jan 13, 2016.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 Observation with ACA correlator for Cycle3 Manabu Watanabe NAOJ.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
Installing Windows 7 Lesson 2.
ACA TP Spectrometer Manabu Watanabe (NAOJ)
Chapter 15 Finalizing Design Specifications
Chapter 15 Finalizing Design Specifications
NSG 4070 Signal generator and immunity test system Dr. Heinrich
SRA Memory Grabber Product Description.
TOPIC 6: SYSTEM START-UP AND CONFIGURATION
Simulation Requirements
Linux Operating System Architecture
Network management system
Chapter 15 Finalizing Design Specifications
Software Development Process
Building Information Systems
Building Information Systems
Presentation transcript:

ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 ACA planning Manabu Watanabe, George Kosugi NAOJ

ICT-CPM June 2014 n build of ACACORR is passed both on RH5.5/32-bit and on RH6.5/64-bit for n ACACORR runs on RH6.5/64-bit without failure, but…  The data structure and numbers in the BDF for RH6.5/64-bit are different from those for RH5.5/32-bit.  Now, we are trying to find the origin of the differences. n We currently have dual test environments, one for RH5.5/32-bit and the other for RH6.5/64-bit.  Until when should the dual environments last? Porting RH6.5/64-bit to ACACORR

ICT-CPM June 2014 n Current Fujitsu RX300S3 will be replaced with new Fujitsu RX100S8.  COJ-CC-1, COJ-CPM-1, COJ-CPN-0xx will be upgraded.  COJ-DMC-1 will not be upgraded. n G9XE, a custom made PCI-X/PCI-express conversion box, should be installed at the same time.  G9XE is stably working since February 2014 in Japan.  4 G9XEs for 4 quadrants. n A prototype system for 1Q was setup in NAOJ  The feasibility of the plan will be established by proof before deployment at AOS. Replacement of ACA computers (1)

ICT-CPM June 2014 Prototype for 1Q in NAOJ (front)

ICT-CPM June 2014 Prototype for 1Q in NAOJ (rear)

ICT-CPM June 2014 n COJ-CC-1 (real-time OS)  RX100S8 runs on kernel rtos  RX100S8 receives 48ms TE signals with PEX (a new RS485 IF card) which is installed on a PCI-express bus and RX100S8 runs in HARD mode.  RX100S8 runs with an external network interface card (E1G42ET) which is installed on a PCI-express bus. n COJ-CPM-1/COJ-CPN-0xx (Standard OS)  RX100S8 runs on kernel (RH5.x/32-bit)  RX100S8 receives spectral data stably from the ACA correlator through G9XE. n Integration test with HW begins in NAOJ this month. Test status of the new computers

ICT-CPM June 2014 n Operation of ACA correlator at AOS should be stopped for deployment and testing of the new system.  It takes 5 days by a provisional estimation.  Is February 2015 best time to do?  RH5.x/32-bit or RH6.x/64-bit at that time? n Further details are described in the plan document.  The document will be available in a couple of weeks. Replacement of ACA computers (2)

ICT-CPM June 2014 n 4-bit linearity correction for : ICT-3118ICT-3118  CDP makes a correction for the nonlinearity at the 4-bit quantizer in the ACA correlator. n 3-bit linearity correction will be upgraded in Feb  The ACA correlator will have a type of the digital baseband power meter inside which publishes the baseband power detected at DTSRs every 16ms or hopefully every 1ms.  Then CDP uses the baseband power to make 3-bit linearity correction per integration: CSV-2810CSV-2810 n CDP may take over FPS (Frequency profile synthesis)  depending on the discussion of the next session…. n hastings, the log message analysis tool, is under study. hastings Software development