Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
27/10/ PHOS Cooling status (1-27 Oct) Brief History: 28 Sep start cool down. Steps (by liquid) was: +17, +5, -3, -10, -15,
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
Brian Martlew 6 th June 2006 Controls Ground Rules Brian Martlew.
Russ Rucinski, FNAL VLPC Cryocooler cryostat Status – June 7, 2006.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
Provisional Hytec Electronic Ltd Hytec 1U IOC Darrell Nineham Hytec Electronics Ltd.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Vacuum and cryogenic systems in R5.2 for MICE Presentation to the MICE/ISIS Operations meeting on 16/03/2015.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
DSS Advisory Board Christoph Schäfer Rack Safety System.
Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Tracker Summary Alan Bross MICE CM October 10, 2007.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
MICE Phase 1 Koji Yoshimura KEK June
André Augustinus 9 October 2006 Interlocks update.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Adrian Oates Graham Cox Daresbury Laboratory MICE Control System DL Contribution June 09.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Electrical Configuration and System Protection
MICE Hall Summer Workplan
SCADA for Remote Industrial Plant
AIP /02 P Bellomo - QE Magnet Power System Upgrade
Hideyuki Sakamoto CM22, RAL 19/10/08
SC1R Cold Box PDR Controls
The Online Detector Control at the BaBar experiment at SLAC
KAGRA PLC System Overview
Hardware integration and interfaces
Vacuum Control System for Monolith Vacuum
Presentation transcript:

Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker control system John Webb from DL electrical engineering group has taken the basic hardwired “cosmic ray” interlocks and developed a more comprehensive system that is now based around standard I/O modules, VME control and EPICS software The system is also expanded for use with the spectrometer (not shown here)

Existing connections between FNAL tracker rack and cryostats These connections are for controlling suitable operating conditions.

New connections between Interlocks VME crate and tracker equipment These connections are for monitoring and safety shutdown control

Motorola MVME 5500 single board computer

2&4 slot VME carrier boards equipped with various IP (Industry Pack) I/O modules Motorola MVME 5500 single board computer Ch ADC

2&4 slot VME carrier boards equipped with various IP (Industry Pack) I/O modules Motorola MVME 5500 single board computer Terminal board I/O connections between IP modules and tracker equipment

Connected Equipment for Interlocks RS232 modules connect with:- Oxford temperature controllers MKS Vacuum gauge Wiener cryostat PSU's? ADC (&DAC) modules connect with:- Cryo compressor external connectors Cryo lid temperature control boxes Cryostat insulation vacuum control connector Vesda smoke detector Tracker rack smoke alarm

Interlocks Programming EPICS control/interlocks software to be written by Adrian Oates at DL GUI will run on PC in MLCR Alarm  Action logic mostly agreed upon although this needs to be confirmed Flexible hardware/software architecture allows for easier development in the future Additional non-resetting mains power breakers will be used on equipment to avoid IC QA rig situation

Vesda Smoke Detector Senses smoke above AFEIIt boards. Alarm signal connected into interlocks system. Presently have one Vesda smoke detector covering 2 cryo’s. Need to purchase another and investigate if we need greater airflow rate due to length of pipework. Plan to ask Fire Suppression Ltd to validate design and installation in the hall. They will also provide short training course with the monitoring software.

Summary Hardware design and drawings are nearing completion Assembly of electronics rack likely to start at DL next month Programming to start as soon as above is available Some detail of action logic to be confirmed Need to provide mains breakers in the hall Need to validate smoke detection system John Webb’s alarms-actions list follows. It was last discussed in August 08 and it needs some amending. I don’t suggest you think about it now unless you are in front of schedule!

Alarm/Trip Action/InterlockControl Room Cryo Smoke Alarm (Vesda)Power off all electronics Alarm Indication Cryostat Lid Temperature HighPower off all electronics Alarm Indication Cryostat Lid Temperature Low?Alarm Indication Cryostat Lid Moisture Detected?Alarm Indication Cassette Space Pressure Low (Helium)Power off Magnets Alarm Indication Cryostat Insulating Vacuum Fault?Alarm Indication Tracker Rack Smoke Detector?Alarm Indication Compressor Power FaultPower off Compressor & CryostatsAlarm Indication Compressor Water Cooling Trip Power off Compressor & CryostatsAlarm Indication ALARM & ACTION REQUIREMENTS