Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.

Slides:



Advertisements
Similar presentations
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
LHC CMS Detector Upgrade Project P05 – Trigger Upgrade: Wesley Smith, U. Wisconsin L2 Manager, WBS August 26, August 2013, Wesley Smith.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Proposal Wesley Smith, U. Wisconsin Fermilab Directors’ Review 16 July 2013 Fermilab Director's.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Wesley SmithMay 12, 2008 Trigger Budget Review - 1 US CMS Mid-Year Budget Review Trigger Wesley Smith May 12, 2008 Outline Overview of Activities FY 08.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Track Finder Crate, Backplane and Parts
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Fred’s Input to Rice Workshop
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview of Activities FY 11 Budget  M&S  Labor Summary

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 2 Overview of US CMS L1Trigger Activities – FY 10 & 11 Operating Regional Calorimeter Trigger Maintenance of Regional Calorimeter Trigger Evolution/Adjustment of Regional Calorimeter Trigger R&D on Calorimeter Trigger Upgrade* Simulation Studies for Calorimeter Trigger Upgrade* Operating CSC Muon Detector Trigger Maintenance of CSC Muon Detector Trigger Evolution/Adjustment of CSC Muon Detector Trigger R&D on CSC Muon Trigger Detector Upgrade* Operating CSC Muon Track-Finder Trigger Maintenance of Endcap Muon Track-Finder Trigger Evolution/Adjustment of CSC Muon Track-Finder Trigger R&D on CSC Muon Trigger Track-Finder Upgrade* Simulation Studies for Endcap Tracker-Muon Trigger Upgrade* * Covered as part of upgrade presentation

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 3 FY 2011 Budget - Labor Details on next slides Engineer Tech Total Labor Total FTE InstituteCostFTECostFTE Florida60, , ,0001 Rice40, , Wisconsin87, , ,0001 Grand Total187, , ,

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 4 FY 2011 Budget – Labor: Comments The plan for FY11 is to continue the extended data run. We are learning how to operate the trigger system under beam collisions with synchronized interactions and collision data flow in cards, links and backplanes We have to be ready for surprises in all hardware areas, particularly as the luminosity and data-flow increase.  As the luminosity climbs, we can expect the changing occupancy to present a changing hardware situation as well We need the expert engineering team ready to respond to analyze & diagnose aspects of how the hardware behaves. We need to be ready for additional repairs, adjustments or even modifications based on what we learn. Finally, we will have a heavy ion run where the trigger may also behave differently and need more diagnostics/modifications…

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 5 FY 2011 Budget – Labor: Cal, Mu Trig scope RCT (Wisc.) consists of 2000 high speed electronics cards, 340 of them are large form factor (9U VME) cards with thousands of components in 18 custom backplane crates and rest are high-speed link (4 Gbaud) mezzanine cards. Also custom clock distribution & high-power control system. All in USC55, accessible 24X7 RCT is mostly programmed through memory lookup tables (LUTs), but has some firmware mostly in controls, timing. On detector CSC Trigger Electronics consists of 80 Muon Port Cards (MPC) & clock/control cards (CCC) (Rice) which operate in peripheral crates on the disks. These are large high-speed boards (9U VME) with a large FPGA. They are not accessible during beam but can have firmware revisions Off detector CSC Track-finder crate has a custom backplane and 12 operating Sector Processor Cards (SP) (Florida) & Sorter Card (SC) (Rice). These are large high-speed boards (9U VME) with multiple large FPGAs. They are in USC55, accessible 24X7. All of the above systems maintain test systems in B904

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 6 FY 2011 Budget – Labor (cont’d) RCT Eng (50%) – Tom Gorski, Wisconsin (50% on Cal Trig Upgrade): Lead RCT engineer & designer: debugging problems, diagnosing failed boards, analyzing system performance, revise control/timing firmware RCT Tech (50%) – Bob Fobes, Wisconsin (50% on Cal Trig Upgrade): Repair of broken boards, repair/replacement of broken cables, power supplies, spares inventory (1000’s of parts) CSC “on detector” Trig. Eng (25%) – Mike Matveev, Rice (25% on Mu Trig Upgrade, 50% on EMU): MPC,CCC,SC engineer & designer: firmware revisions, debugging problems, diagnosing failed boards, analyzing system performance CSC “off detector” Trig. Eng (25%): Alex Madorsky, U. Florida (25% on Mu Trig Upgrade, 50% on EMU): : Lead SP, TF backplane engineer & designer: firmware revisions, debugging problems, diagnosing failed boards, analyzing system performance

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 7 FY 2011 Budget – Labor (cont’d) CSC “off detector” Trig. Eng. (25%): Lev Uvarov, U. Florida PNPI subcontract (25% on Mu Trig Upgrade, 50% on EMU): SP, TF backplane engineer & designer: firmware expert, debugging problems, diagnosing failed boards, analyzing system performance, expert on interfaces to EMU system. CSC “off detector” Trig. Tech. (50%) -- Arman Ballado, U. Florida. Assist engineer in routine tests and diagnoses, revision of LUT contents and firmware configurations as requested.

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 8 FY 2011 Budget – M&S Florida:  Annual transport. Meyrin ↔ Prevessin & P5 for trigger operations (CERN car+fuel): $10K  CERN pool charges, small parts, refurbishing boards: $6K  Server plus RAID disk pool for trigger commissioning/performance studies: $8K Rice:  No FY11 request because of unspent funds in FY08,09 still available  CERN pool charges, small parts, refurbishing boards: $6K spent against FY08.09 funds Wisconsin:  Replacement Cables, Power Supplies & Components depleted in spares stock: $15K  Annual transport. Meyrin ↔ Prevessin & P5 for trigger operations (CERN car+fuel): $15K M&SInstitution FY 11 Budget Request Counting Room Muon Trig M&SFlorida24,000 Detector Muon Trig M&SRice0 Calorimeter Trig M&SWisconsin30,000 Total 54,000

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 9 US FTE Fraction of Trigger L1:  Above table shows US CMS provides 27% of L1 Trigger Physicists HLT:  Trigger Studies Group MoA pledges total 49.5 FTE  US CMS TSG MoA Pledges total 31.5 FTE  US CMS is 64% of TSG pledged FTE  Note this includes some students Level-1 TriggerPhysicists% Austria70.27 Italy10.04 Poland30.12 Portugal10.04 Spain10.04 UK60.23 US70.27 Total261.00

Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 10 Summary and Conclusions Labor:  Have a strong experienced engineering team that represents the US CMS trigger “institutional knowledge”.  This team is essential to keeping the trigger system working  Whatever time this team does not spend on M&O, is spent on upgrades. The fraction has been about 50% each.  The support of this team is split between M&O and Upgrades M&S:  Reaching a steady-state and understood level General Comment:  Expect that all funding will be needed and unexpected events will be covered by contingency