T.Schneider/LHCb Muon EDR

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Development of high rate RPCs Lei Xia Argonne National Laboratory.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
THERMO-MECHANICAL TESTS ON TRACKER LADDERS (Low temperature problem on plane 1) Status Report: D.Rapin Sept 26,2012 (help from Giovanni, Franck, Mingming,...)
TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
Ken Youssefi Mechanical & Aerospace Engr., SJSU Discontinuity in Cross Section Stepped shafts Discontinuity.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Pressure Sensitive Adhesive Tapes for Sales and Marketing Professionals Tape University Basics May 11, 2009 Testing.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Production Readiness Review Production steps and quality control 1.Panel production 2.HV bar gluing 3.Preparation of side material 4.Wiring and gluing.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
Ken Youssefi Mechanical & Aerospace Engr., SJSU Concept of Stress Concentration Theoretical stress concentration factor, K t Maximum stress at the discontinuity.
CLIC Workshop – CERN, October / 17 DC breakdown experiments for CLIC CERN, TS-MME Antoine Descoeudres, Trond Ramsvik, Sergio Calatroni, Mauro Taborelli.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Muon EDR material specification 16/04/20031T.Schneider/LHCb Muon EDR O-ring choice: In the inner part of the Muon system (M2/3 R1/2) we have introduced.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
GRPC development in Lyon
Update on Pavia MM mechanical prototype
Quality Control Chamber Production
High Order correctors coil manufacturing
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
GRPC activity for EuDHCAL in IHEP-Protvino
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Electrical Insulation
Gas Monitoring Chamber Production Status
STRAIN GAGE CHARACTERISTICS
Presentation transcript:

T.Schneider/LHCb Muon EDR Different application of epoxy glue in the muon chambers a) Wire fixation on Anode wire bar b) Bar gluing on the cathode panel Peripheral gluing to close and seal the chamber Epoxy glue requirements Table of possible glue candidates Additional test done for direct comparison: a) Viscosity b) Electrical resistivity Attachment properties (shear test ISO9664) Conclusions for the different applications 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 1.a) Wire fixation on the anode wire bar The 5mm wide glue line in front of the soldering has to keep the wires with a tension of 60g. Low glue viscosity assures that the 30µm wire is well enclosed by the glue. The glue line thickness shall not exceed 1mm as we have ground in only 2.5mm distance. All Proto-types have been done with Adekit 145 => good experience 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 1.b) Bar gluing on the cathode panel Special tooling has been developed to glue the bars precise (2.5mm ± 50μm) to the panel. Function to the glue: -Mechanical fixation of bars on the panel. Wires pull with ~300gr /cm on the bar -Filling the gap between bars and panel (0.1mm-0.6mm depends on thickness of the chosen bar material) -Provide sufficient gas tightness for the chamber 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 1.c) Peripheral gluing to close and seal the chamber In some chamber design peripheral sealing is foreseen. Once the HV and uniformity test of the assembled chamber are satisfying this final procedure can be performed. Function of the glue: -Good attachment properties to keep the chamber mechanically together -High viscosity to facilitate the work all around the chamber -Provide sufficient gas tightness for the chamber 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 2. Epoxy glue requirements - Working time >30min Manipulation time < 8h Good adhesive behavior for FR4 to copper/gold Low viscosity for wire gluing Medium to high viscosity epoxy for bar gluing /gap filling procedure to ensure mechanical strength and gas tightness High electrical resistance (risk of dark currents) Good chemical resistance (CF4/radiation/high el. field) Good shock resistance (elastic behavior to avoid cracks and consequent leaks) 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 3. Table of possible glue candidates => 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 4.a) Viscosity test Adekit 140 Adekit 145 Araldite 2011 3M DP490 3M DP460 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 4.a) Viscosity test Different Glue candidates have been applied to a declined surface “structural” “low viscosity” “structural” “medium viscosity” Adekit 140 Adekit 145 Araldite 2011 3M DP490 3M DP460 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 4.b) Electrical resistivity test Samples for volume resistivity have been prepared. 3KV have been applied to the samples under controlled condition (T const, dry air) Sensitivity of measuring device is 0.1nA 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 4.b) Electrical resistivity Results: A145 A140 Araldite2011 DP490 DP460 <0.1nA 0.9nA <0.1nA 0.8nA <0.1nA (3.3TΩ; 130TΩcm) (3.7TΩ; 150TΩcm) =>The 2 structural glues have lower volume resistivity ! The test of volume resistivity is more an academic approach. Real conditions might be dominated by surface currents. Tests are ongoing to get some answers on surface resistivity from the epoxy glues. Reliable measurements are difficult to obtain due to environmental conditions such as humidity and temperature. Experience and results from Proto-types should enter into these considerations. 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 4.b) Attachment FR4 to Cu/Au For good comparison for our special use (FR to Cu/au) a test for “fatigue properties of structural adhesives in tensile shear” ( ISO 9664) has been performed in the CERN EST Division. 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 4.b) Attachment FR4 to Cu/Au Five samples per candidate (5) and condition (Cu or Au) have been prepared =>50 in total. Humidity and temperature were kept stable during this operation. 200mm wires were introduced as spacers to simulate the real condition of our chamber construction. 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 4.b) Attachment FR4 to Cu/Au *Adekit 145 is only candidate for the wire gluing The 4 others are possible candidates for the bar gluing and peripheral gluing EST/SM-ME Section de métallurgie / Metallurgy section Rapport expérimental / Investigation report 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 4.b) Attachment FR4 to Cu/Au Apart from the Adekit 145 the result are “quite similar”. Best result for FR4/Cu : DP490 Best result for FR4/Au : Adekit140 Comments: The 2 structural glues (DP490/Adekit140) break in the glue. The glue stays on both surfaces. The 3 transparent less viscous ones (DP460/Adekit145/Araldite2011) break at the glue metal connection. 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 5. Conclusions for the different applications 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 5. Conclusions for the different applications Wire gluing: We agreed to continue with Adekit 145 as we had quite good feed back in all our proto types. It was satisfying all requirements for this application (attachment, el. resistifity, viscosity, chemical resistance) Calculating the attachment force corresponding to the wire surface in a 5mm wide gluing line the breaking limit is still factor 4 (2.3N0.6N wire tension) above our use. 16/04/2003 T.Schneider/LHCb Muon EDR

T.Schneider/LHCb Muon EDR 5. Conclusions for the different applications Bar and peripheral gluing: High viscosity to obtain good leak tightness as well as the attachment force are the most important properties for this application. A good candidate is the Adekit 145. We decided to use this glue for the next chambers. This will give us soon answers about the missing chemical and electrical properties. 16/04/2003 T.Schneider/LHCb Muon EDR