Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October.

Slides:



Advertisements
Similar presentations
SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Advertisements

Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Jan Geralt Bij de Vaate DS4-T4 Wideband Integrated Antennas DS4-T4 Jan Geralt Bij de Vaate ASTRON.
CERDEC-06/27/ Digital Array Radar Technology Development March 20, 2007 Dr. Barry S. Perlman Associate Director for Technology US Army CERDEC.
AAVS receiver Federico Perini AAVP December, ASTRON, Dwingeloo.
DFT Filter Banks Steven Liddell Prof. Justin Jonas.
Interference Daniel Mitchell, ATNF and Sydney University.
BDT Radio – 2b – CMV 2009/10/09 Basic Detection Techniques 2b (2009/10/09): Focal Plane Arrays Case study: WSRT System overview Receiver and.
Front end design Front end like SEQUOIA, except that both signal polarizations combined with ortho-mode transition. Entire signal band down-converted.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
DBBC3 Development - Digital Base-Band Converter 3
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
Self-Calibrating Audio Signal Equalization Greg Burns Wade Lindsey Kevin McLanahan Jack Samet.
Georgina Harris1 2-PAD 4 th SKADS Workshop, Lisbon, 2-3 October Polarisations All Digital Dr Georgina Harris / Prof Tony Brown SKADS System Design.
Jader Monari1 BEST receivers 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Jader Monari IRA -INAF- Bologna –Italy-
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
Backend electronics for radioastronomy G. Comoretto.
SKADS1WorkshopAvA Coordinators report First SKADS Workshop Paris 04 September 2006 Arnold van Ardenne SKADS Coordinator SKADS Project Office ASTRON,
1 M. Catelani, Valeria L. Scarano University of Florence, Italy Department of Electronics and Telecommunications -
FPGA-based Dedispersion for Fast Transient Search John Dickey 23 Nov 2005 Orange, NSW.
RN /08/05 National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Implementation of an Antenna.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
Tim Ikin 11 th October ND SKADS Workshop 2-PAD Analogue Front End Tim Ikin Electronics Engineer 2 nd SKADS Workshop Paris 11 th October 2007.
Simulations of Beamforming Algorithms Stelio Montebugnoli, IRA-INAF, Medicina (BO), Italy, Giovanni Naldi, IRA-INAF, Medicina.
André van Es 2 nd SKADS Workshop October 2007 Review on Deliverables and forward look André van Es.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
Andrew Faulkner1 SKADS and SKA 4 th SKADS Workshop, Lisbon SKADS and SKA Andrew Faulkner.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
The BEST-2 SKA pathfinder is composed by 32 receivers. The front ends are installed on the focal lines of 8 cylinders, offering a collecting area of about.
Mileura Widefield Array – Low Frequency Demonstrator MHz * Currently in “Early Deployment” phase Goal: HI at redshift 6 to 17.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
FIFO 64KX9 FIFO 64KX9 CLOCK D/A Converter 10 bit D/A Converter 10 bit Up-Converter LO Down ConverterIntegrator To DAQ Card 9 Bit Basic Schematic of.
Casper 2010Marc Torres Part 2: Building blocks for the next generation.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
S.Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Stelio Montebugnoli IRA -INAF- Bologna –Italy- SKADS 4th -Lisbon- Oct 2-3, 2008.
Ariadne’s Thread Kristian Zarb Adami. Simulator Aims ۞ Provide the system architect a tool to visualise trade-offs in designs ۞ Provide the scientist.
2 nd SKADS Workshop October 2007P. Colom & A.J. Boonstra 1 Outline -progress in RFI mitigation (methods inventory) -system design & RFI mitigation:
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
J. Monari 2 nd SKADS Workshop October 2007 BEST-2 test bed: Radio over Fiber experiences Presented by Monari Jader IRA-INAF Radiotelescopio Croce.
Distributed Adaptive Control and Metrology for Large Radar Apertures PI: James Lux Co-Is: Adam Freedman, John Huang, Andy Kissil, Kouji Nishimoto, Farinaz.
Foreword…….. The receiver design is on hold in order to achieve the AAVS0 goals.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
Philippe Picard 2 nd SKADS Workshop October 2007 Station Processing Philippe Picard Observatoire de Paris Meudon, 11th October 2007.
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ALMA Correlator.
Netherlands Institute for Radio Astronomy 1 APERTIF beamformer and correlator requirements Laurens Bakker.
Cosmic Microwave Technology, Inc.
Highly Accurate Wide-Range FM-CW Radar Altimeter
Medichats 14 October 2008 ADC bit number and input power needed, in new radio-astronomical applications View of the Medicina Radiotelescopes - Italy Eng.
LAPP BPM Read-out Electronics
IRA – INAF Bologna (I) DS-6 16 September 2018 SKADS Workshop 2006
EVLA Advisory Committee Meeting System Status
Aperture Array Station Processing
Technical Foundations & Enabling Technologies – DS4
SKADS White Paper - Technologies -
EVLA Advisory Panel Mtg. System Overview
Generation of CS-UWB DDL
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October 2008

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS-6 T1 Deliverables: 1- Analogue (T0+12mo) and/or digital optical links (T0+21mo). 2- Architecture and technology for immediate application on the BEST - x demonstrator construction (T0+10mo).

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October Analogue (T0+12mo) and/or digital optical links (T0+21mo). (Done) Optical Tx Analog Link Optical RX BEST-2 IF

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Low Noise balanced Amplifier IF Amplifier 2- Architecture and technology for immediate application on the BEST - x demonstrator construction (T0+10mo). (Done) Optical link Front End A/D

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS-6 T2 Deliverables: 1. front ends to the receiver room (T0+12mo). 2. Immediately ready and easily replicable electronic (T0+12mo). 3. Local oscillator and sync. distribution in large infrastructures/arrays (T+38mo). 4. Wide band and high dynamic range Data Acquisition System (T+39mo) GHz analogue optical link (already used in BEST-1 and planned for BEST-2, -3 6.Tested adaptive beamforming and RFI Mitigation algorithms (T0+39mo).

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 LNA Front end Easily replicable electronic Sync distribution LO distribution Optical Fiber FX correlator DS-6 T2 Deliverables :.. 1,2,3,4,5,. in practice.

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 X = Dim. N x T T t using Cholesky Decomp. = Rx n° samples per Rx A/D 12N Final version will be programmed on the Bee 2 engine 6.Tested adaptive beamforming and RFI Mitigation algorithms (T0+39mo) Simulation level. Not jet implemented. It will be the next step pf the Bee2 programming. (Not completely Done).

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS-6 T3 Deliverables: 1.Simulation Software for sensor array (T months) 2.Methodology to compare expected results with the simulated ones (T months)

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October Simulation Software for sensor array (T months) UV-plane coverage analysis for the BEST project (SKA-DS) INAF-IRA Technical Report #417/08 E. Carretti1, D. Dallacasa1, 2 1-INAF–IRA, Via Gobetti 101, I Bologna, Italy 2-Università di Bologna, Astronomy Dep., Via Ranzani 1, I Bologna, Italy (Partially done)

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS6-T3: Assessment of Performace BEST-1: P n obtained with. GRASP = 86.3 K F=408 MHz 2. Methodology to compare expected results with the simulated ones (T months) (Partially done) Computed T SYS Measured T SYS

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS-4 Deliverables: (to be focused with J.G. Bij de Vaate and Laurens Bakker) Kick off meeting in Medicina (Bologna) on April 2008 (BdeV)

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 FIFO Coarse Time Delay A D DDC Resc. Delay CTRL Intellig. RFI Handling FFT -1 Calibration/FFT Phase LUT Delay & RFI control PFB Adaptive Beamf. Control Adapt. Beamf. RX 1  I m 1 i  m RX i RX  m Fringes (f) k Beam 1 Beam i I Beam k Rxi Calibration Adaptive/multibeaming Calibration, Direct Pixeling, FX Correlation Calibration, Digital Adaptive beamforming (linked with DS3-T2 & DS 4 T3 and T5) 4 (bits) F X FX corelator Rxi spectrum Rxi Block diagram (Deliverables)

Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008