ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.

Slides:



Advertisements
Similar presentations
Hazel Grove Car Park Proposals Overview Transport for Greater Manchester (TfGM) is developing plans to provide over 100 additional car parking spaces at.
Advertisements

Public Works: Building Sustainable Communities
CR 46A Realignment (Section 5)
ESTABLISH A NORTH-SOUTH PARKWAY The LNTC and the towns should plan for a parallel north-south parkway that will expand the commuter rail impact area to.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
S ALES T AX : P AVEMENT M ANAGEMENT P ROGRAM S PECIAL M EETING WITH THE B OARD OF C OUNTY C OMMISSIONERS S EPTEMBER 20, 2011.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
Contact: Beth Morris
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
York Region’s Pedestrian and Cycling Municipal Partnership Program Presentation to 2014 Sustainable Mobility and Healthy Communities Summit ACT Canada.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Trail Funding Sources & General Information
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
The Alachua County Mobility Plan:
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.
PUBLIC HEARING Draft Amendments FY 2011/12 – 2015/16 Transportation Improvement Program (TIP)
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Alachua County Mobility Plan Sidewalk Mitigation & Bicycle and Pedestrian Planning Efforts.
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
MED SR 18 Corridor Project MED PID October 13, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Application CPA (Large Scale Map Amendment) Request Initiated by the County to amend Future Land Use Map from Rural/Agriculture to Preservation for.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
USDOT TIGER Grant Program Tower Road Complete Street Reconstruction.
Transportation Master Plan Update Warden’s Forum May 7, 2015.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Arizona Forward Update
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
The Gainesville Area Chamber Infrastructure Investment Initiative
Transportation Initiative Sales Tax Prioritization
Central Polk Parkway PD&E Study
Project Status & Right-of-Way Acquisition
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 16, 2018.
Construction Management & Inspection
St. Johns River-to-Sea Loop Trail Summit
Lyle Parkway to SR 540 (Winter Lake Road)
SCTPO Transportation Alternatives & Trail Project Priorities
MPO Board Presentation
Design Standards.
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Interlocal Cooperative Agreement FY 20
Presentation transcript:

ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County Commissioners May 11, 2010

Each year the FDOT updates its Five-Year Work Program and requests that Alachua County submit transportation project priorities for consideration as part of that update process.

Alachua County asks municipalities to submit transportation project priorities for consideration as part of that update process. Alachua County asks municipalities to submit transportation project priorities for consideration as part of that update process. All municipalities contacted All municipalities contacted Two projects submitted (Newberry & City of Alachua) Two projects submitted (Newberry & City of Alachua) City of Alachua Project most applicable as a safety improvement rather than a enhancement project City of Alachua Project most applicable as a safety improvement rather than a enhancement project Older projects remain ranked in order after City Newberry project Older projects remain ranked in order after City Newberry project

MULTI-MODAL FISCAL YEAR 2011/12 – 2015/16 Project Location and Description 1 City of Newberry: Multi-use path connecting Rails to Trails Trailhead 2 City of Archer: Construct sidewalks along SR 24 from SR 45 (US 41/27) to McDowell Street 3 Town of LaCrosse: Landscaping, pedestrian street lighting and welcome signs at town entrance

TRANSIT PRIORITIES FISCAL YEAR 2011/12 – 2015/16 Project Location and Description 1 Park and Ride Lot - City of Alachua - Park and Ride facility and RTS bus purchase. 2 Park and Ride Lot - City of Archer - Park and Ride facility and RTS bus purchase. 3 Park and Ride Lot - City of Hawthorne - Park and Ride facility and RTS bus purchase.

MULTI-MODAL FISCAL YEAR 2011/12 – 2015/16 TRANSIT PRIORITIES

INTERSECTION/SAFETY MODIFICATION PRIORITIES FISCAL YEAR 2011/12 – 2015/16 Project Location and Description 1 NW 142 nd St at US 441 Intersection Realignment Realignment 2 CR 235A at CR 235 Intersection - City of Alachua -Intersection Modifications 3 CR 2054 at CR City of Alachua - Left-Turn Lane & Traffic Signal

EFFICIENCY FISCAL YEAR 2011/12 – 2015/16 INTERSECTION / SAFETY MODIFICATION PRIORITIES

RESURFACING/WIDENING PRIORITIES FISCAL YEAR 2011/12 – 2015/16 Project Location and Description 1 CR US 441 to I 75 2 CR 329B - SR 26 to SR 26 3 Wacahoota Road - SR 121 to US 441

MAINTENANCE FISCAL YEAR 2011/12 – 2015/16 RESURFACING/WIDENING PRIORITIES

* FUNCTIONALLY OBSOLETE BRIDGE PRIORITIES FISCAL YEAR 2011/12 – 2015/16 Project Location and Description 1 121A in LaCrosse 2 CR River Styxx * Functionally obsolete: structurally-sound but may need modifications to lane widths, approaches, guard rails, etc. to bring the bridge up to current standards

MAINTENANCE FISCAL YEAR 2011/12 – 2015/16 BRIDGE PRIORITIES

CAPACITY MODIFICATION PRIORITIES FISCAL YEAR 2011/12 – 2015/16 Project Location and Description 1 SR 24(Archer Road) - US 41 (Archer) to SW 75th Street -Multi- lane Reconstruction 2 SR SR 235 and US (City of Alachua) - Truck By-Pass Study

CAPACITY FISCAL YEAR 2011/12 – 2015/16 CAPACITY MODIFICATION PRIORITIES

Staff Recommendation 1. Approve the priority list for transmittal to the Florida Department of Transportation (FDOT).