Christopher Hill December 6, 2006 CE 679

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

NEW YORK WATER ENVIRONMENT ASSOCIATION WINTER MEETING – FEBRUARY 10, 2003 MAXIMIZING CSO CAPTURE THROUGH WET WEATHER OPERATIONS.
Often water is prescreened, treated with ozone, or pre-chlorinated before entering the coagulation basin (depending on the quality of the water). Coagulation.
North Texas Municipal Water District Water Treatment Process.
CE 370 Sedimentation.
CLARIFIERS Prepared By Michigan Department of Environmental Quality
Treatment of Slaughterhouse Wastewater
1 CTC 450 Review Preliminary & Primary Treatment Preliminary & Primary Treatment Measure flow Measure flow Screen Screen Grit chamber Grit chamber Primary.
C. T Calculation Math for Water Technology MTH 082 (pg. 468) Math for Water Technology MTH 082 (pg. 468) “Required by Law”
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
An-Najah National University Civil Engineering Department
FE Review for Environmental Engineering Problems, problems, problems Presented by L.R. Chevalier, Ph.D., P.E. Department of Civil and Environmental Engineering.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
CE 370 Filtration.
Phosphorus Removal at Sand Creek Water Reuse Facility by Duane “Bear” Steib and Kathy Bill/City of Aurora Steve Polson/CH2M HILL by Duane “Bear” Steib.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
Surface Water Treatment Plant
Review of Settling AKA sedimentation – suspended solids removed from liquid phase by gravity Common applications in Wastewater Treatment – grit chamber,
DESIGN OF WASTEWATER TREATMENT PLANT
1) Introduction Koruma Industry Koruma Tarım Established in 1949
Improvement of the Capacity of Drinking Water Treatment Plant in East Quantara (Case Study) Dr. Eng. Ibrahim Khaled El-Sayed Chairman 1North & South Sinai.
A Review of State-of-the-Practice Equipment at the Plum Creek WWTP By Tim Grotheer Plum Creek Wastewater Authority & Dave Oerke RTW Professional Engineers.
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Folklore in Activated Sludge Treatment Plant Operations
The Actiflo® Process Introduction to
Filter Loading and Backwash Rates Well Yields and Chlorine Dosage in Waterworks Operation Math for Water Technology MTH 082 Lecture Chapter 4 & 8- Applied.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Math for Water Technology MTH 082 (pg. 468)
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
Willamette Water Treatment Plant
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
Module 4: Fundamentals of Wastewater Treatment Wastewater Treatment Plant Operator Training.
LIPPO CIKARANG Wasted Water Treatment Plant
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Effective Use Of Peracetic Acid to Reduce Effluent Disinfection Byproduct in Water Resource Recovery Facilities Isaiah Shapiro, EIT Dimitri Katehis PhD,
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
PHOSPHORUS REMOVAL FOR LAGOON OPERATORS WHY THE CONCERN OVER P.
Cortez Sanitation DistrictSeptember 2002 Arber Cortez UV Disinfection Steven M. Ravel, P.E. Travis E. Meyer, P.E. Richard P. Arber Associates.
Using the CPE Approach to Optimize Industrial Waste Treatment Facilities Ronald G. Schuyler and Michael Rothberg Rothberg, Tamburini, and Winsor, Inc.
E NVIRONMENTAL E NGINEERING 441 Lecture 5: Water Treatment (3) Sedimentation & filtration Philadelphia University Faculty of Engineering Department of.
5.6 SEDIMENTATION Objective
NYWEA ENERGY SPECIALTY CONFERENCE November 20, 2014 Towards Net-Zero Energy in Wastewater Treatment Demonstration of ClearCove’s Enhanced Primary Treatment.
ENVE-2110 EXAM III Help Session DCC pm.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
CE 356 Fundamental of Environmental Engineering
Winchester Municipal Utilities March 24 th, 2016.
CTC 450 Review WW Collection Systems Types of pipes Installation.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Chemical Engineering Department Government Engineering College Bhuj Prepared by: Kumar Satyam Guided By: Prof. Sejal J. Solanki Chemical.
Conventional Sewage Treatment Plants:
CTC 450 Review WW Sludge Processes.
How Water Flows Through the Plant
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Design of a Wastewater Treatment Plant
Microfloc Products Adsorption Clarifier/Trident/Tri-Mite
CTC 450 Review Preliminary & Primary Treatment Measure flow Screen
CTC 450 Review Water Quality Water Distribution Systems.
Microfloc Products Adsorption Clarifier/Trident/Tri-Mite
ENG421 (5c) – Water Treatment Plant Costs
Wastewater Facilities Upgrade Project
Maximum daily demand = 1.8 x average daily demand
Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update The 7th Biennial Meeting of the Lake Erie Millennium Network.
Clarifier Calculations Prepared By Debremarkos Department of HWRE Water treatment unit.
Claus Dahl, Krüger A/S International Division
Physical/Chemical Waste Treatment
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Presentation transcript:

Christopher Hill December 6, 2006 CE 679 Application of Ballast Flocculation for Sanitary Sewer Overflow Management North Dakota State University Christopher Hill December 6, 2006 CE 679

Outline Problem Overview Introduction Application Design Conclusion

Problem Overview What are SSOs? What is the cause of SSOs? Why are SSOs a problem? What is the frequency of SSOs? How are SSOs managed?

Ballasted Flocculation What is ballasted flocculation? Why ballasted flocculation? Actiflo®, DensaDeg®, Sirofloc®

Actiflo® System

Application – Satellite Basin Located in the collection system Does not meet EPA secondary treatment standards Cost effective Screen Interceptor Sewer Sludge Actiflo® Actiflo Disinfection WWTP River

Application – WWTP Bypass Headworks Located at WWTP Mixing with the WWTP effluent to comply with permitting limits Cost effective Secondary Treatment Actiflo® Disinfection River

Design – Flow Monitoring Base on flow monitoring, develop model for sewer system. Typically designed for 5 year return period storm Design peak wet weather flow = 15 MGD

Design - Pretreatment Design Flow Pretreatment Ramp-up 150% Q Ramp-down 50% Q Hydraulically 200% Q Pretreatment Screening (3 – 6 mm) 2 x 10 MGD Q = 10 MGD 2 x 5 MGD

Design – Coagulation Jar Test/Pilot Study Sizing Tank Mixing Chemical Coagulant HRT 1 – 2 minutes Rapid Mixing (G = 500-1500 s-1) Jar Test/Pilot Study Sizing Tank V = (HRT) x Q = 1 min x 3472.5 gal/min = 3472.5 gal or 464.2 ft3 Mixing Theoretical Power Requirement P = G2 m V = 12002(1.307x10-3 N*s/m2)13.2m3 = 24,844 W or 25 kW

Design – Flocculation Jar Test/Pilot Study Sizing Tank Mixing Polymer Sand (2 – 4 g/L) HRT 1 – 2 minutes Rapid Mixing (G = 500-1500 s-1) Sizing Tank V = (HRT) x Q = 1 min x 3472.5 gal/min = 3472.5 gal or 464.2 ft3 Mixing Theoretical Power Requirement P = G2 m V = 12002(1.307x10-3 N*s/m2)13.2m3 = 24,844 W or 25 kW

Design – Maturation Sizing Tank Mixing Maturation HRT 3 – 5 minutes Slow Mixing (G = 160 – 200 s-1) Sizing Tank V = (HRT) x Q = 3 min x 3472.5 gal/min = 10,417 gal or 1,393 ft3 Mixing Theoretical Power Requirement P = G2 m V = 2002(1.307x10-3 N*s/m2)52.6m3 = 2,750 W or 2.8 kW

Design - Settler Tank Area Tank Dimensions Design Criteria Settler Overflow Rate 20 to 80 gal/ft2*min Typically 30 gal/ft2*min Length: Width = 1:1 Lamellar Tubes Tank Area A = Q / Vo = 3472.5 gal/min / 30 gal/ft2*min = 115.75 ft2 Tank Dimensions L = W = A1/2 = 115.751/2 = 10.75 ft Use 11 ft Design Criteria Between 45o and 60o Incline Nominal Spacing 2 in Incline Length 3 to 6 ft

Design – Actiflo® System Assume Depth of 12 ft

Design - Microsand 2 – 4 g/L of Microsand 4.8% of Q Sludge Actiflo® Influent Q Hydrocyclone 1.2% of Q Recycled Sand River Clarified Water 6% of Q Sludge Handling WWTP 2 – 4 g/L of Microsand Total Volume – Coagulation = 3,375 ft3 or 95,600 L The system requires 191.2 - 382.4 kg (421.5 - 843 lb) Sludge = 10 MGD x 0.048 = 480,000 gal/day

Actiflo® Design

Actiflo® Design

Conclusions Evaluation of Alternatives Design Pilot Study Disadvantages

Questions?