17 June 2008PC 320 1 Analysis PC Schedule 2008 Tuesdays alternate weeks 29 April  13 May  27 May (1 week before CM21)  17 June 1 July (JC away – can.

Slides:



Advertisements
Similar presentations
10 Aug 2010PC Analysis PC Schedule Tuesdays fortnightly Provisional dates 10 Aug 24 Aug 7 Sept 21 Sept But it’s holiday season so they may vary –
Advertisements

1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
Emittance definition and MICE staging U. Bravar Univ. of Oxford 1 Apr Topics: a) Figure of merit for MICE b) Performance of MICE stages.
1 Angular Momentum from diffuser Beam picks up kinetic angular momentum (L kin ) when it sits in a field –Canonical angular momentum (L can ) is conserved.
Cooling channel issues U. Bravar Univ. of Oxford 31-Mar-2004.
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
1 26 Nov 2010 SOLID ABSORBERS Solid absorbers will provide first cooling demonstration –This is important for a number of reasons! Can use only solids.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
MICE analysis meeting - (4/5/2006) 1 some reflections on scraping, PID sizes and Transmittance M. Apollonio – University of Oxford.
Analysis Meeting – – Slide 1 Beam momentum measurement using TOFs: progress report Analysis Meeting, February 2008 Mark Rayner.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
1 PID Detectors & Emittance Resolution Chris Rogers Rutherford Appleton Laboratory MICE CM17.
18 June 2004AFC meeting1 MICE  functions and so on Work in progress…. Observation by Ulisse Bravar at CERN meeting that beam not matched in baseline (Proposal.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 Chris Rogers Imperial College 18 May 2006 TOF II Justification.
1 G4MICE downstream distributions G4MICE plans Rikard Sandström Universite de Geneve MICE collaboration meeting 27/6-05.
Chris Rogers, MICE CM16 Wednesday Plenary Progress in Cooling Channel Simulation.
Beamline-to-MICE Matching Ulisse Bravar University of Oxford 2 August 2004 MICE performance with ideal Gaussian beam JUNE04 beam from ISIS beamline (Kevin.
24 Nov 2009PC Analysis PC Schedule 2009 Tuesdays fortnightly Proposed dates: 13 October  27 October  CM25 4 – 6 November  24 November 8 December.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
Overview of Experiment and Parameter Choices presented by Giles Barr.
18 August 09Mark Rayner – Momentum measurement by The TOFs1 Momentum measurement by the TOFs A correction to an O(4 MeV/c) bias on the current muon momentum.
Chris Rogers, Analysis Parallel, MICE CM17 Progress in Cooling Channel Simulation.
1 Chris Rogers MICE Collaboration Meeting 11th Feb 2005 Tracking and Cooling performance of G4MICE.
MICE BL meeting 11/12/08 Agenda This weekend (12 or 13/12/08): a)beam emittance measurement (Mark-next talk) b)TOF0/1 characterisation (TbC – comments.
Stats update Was asked to provide comparison between toy mc and g4mice at two points along z (middle of first and third absorbers) 10,000 events, step.
Diffuser Studies Chris Rogers, IC/RAL MICE VC 09 March 2005.
Critical Issues for MICE Chris Rogers MICE CM 15.
13 Nov 2007 Analysis PC 13 Nov Analysis PC Schedule 2007/ 08 Tuesdays alternate weeks, 16:30 – 18:00 GMT, with ad hoc exceptions 30 October  13.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
Multiple Scattering (MSC) in Geant4 Timothy Carlisle Oxford.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
2 Oct 2008PC We have only 1 hour today May need to be brief.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
3 June 2009J. H. Cobb 1 ANALYSIS SUMMARY CM24 Agenda for Analysis parallel session at CM Sunday 31 May 14:00.
M. Ellis - MICE Video Conference - 30th August Software Report Recent progress:Recent progress: –Start of code to read DATE format (two parts) One.
26 Oct 2010PC Physics Requirements of Software from Chris R ~19 Oct. My.
Step IV Studies Timothy Carlisle Oxford. Intro. CM28 – Step III vs Step IV Cooling formula & G4MICE disagree on – Also observed in ICOOL (note #199 –
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
Simulating the RFOFO Ring with Geant Amit Klier University of California, Riverside Muon Collaboration Meeting Riverside, January 2004.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
17 Sept 2007 Analysis PC 18 Sept Analysis PC Schedule 2007 Tuesdays alternate weeks, 15:30 – 17:00 GMT, with ad hoc exceptions Tue 3 April Tue 17.
Nufact02, London, July 1-6, 2002K.Hanke Muon Phase Rotation and Cooling: Simulation Work at CERN new 88 MHz front-end update on cooling experiment simulations.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
15 June 2010PC Analysis PC Schedule Tuesdays fortnightly Provisional dates 1 June 15 June 28 June (JC away) CM27 7 – 10 RAL Let me & Yagmur.
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
(one of the) Request from MPB
Status of 2016 V.Palladino. 5 papers submitted to MICE scrutiny and then to IPAC yesterday May 4 Sun, May 1, :45 am Tanaz (Victoria) Simulated.
1 6D Cooling Chris Rogers, ASTeC-STFC Topical Workshop 23 Oct 2007.
Uncertainties in Cooling Simulations R.C. Fernow BNL Synergy Workshop FNAL 13 June 2008.
Why do we need to know the fields / map the magnets?
Misalignment Study David Forrest University of Glasgow
Using MICE to verify simulation codes?
Muon Front End Status Chris Rogers,
Completing the Step IV Programme
April May April May June July July June August Sept August
Geant Simulation of Muon Cooling Rings
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Presentation transcript:

17 June 2008PC Analysis PC Schedule 2008 Tuesdays alternate weeks 29 April  13 May  27 May (1 week before CM21)  17 June 1 July (JC away – can someone deputise, or is everyone at Nufact?) 15 July 29 July 12 August

17 June 2008PC Agenda for Analysis Meeting 17 June 15:30 GMT JC - Meeting schedule / Longitudinal cooling in Step III / dE/dX Model sensitivity UB - CR - ?? MR - Step III with G4MICE/ICOOL comparison MR - Emittance measurements with TOFs DF - Spectrometer alignment TH - Spectrometer field mapping KT – Initial Emittance measurements JC/All - Analysis workshop AOB Apologies from David Forrest & Paul Soler (Nufact School)

17 June 2008PC Bob Palmer’s talk at “NF-MC synergy” meeting, Fermilab, 13 June 2008 Needs some study & optimisation There will be ~6 months – 1 year between Steps III and IV We should think of doing this (Chris has done some work already) Could also imagine STEP IV.1 (no RF but better optics than III.1/2 STEP III.2 STEP V.1

17 June 2008PC SENSITIVITY OF COOLING TO dE/dX MODELS Talk by R. Fernow at NF-MC synergy meeting, 13 July 2008 Stronger sensitivity of cooling and muons/proton to dE/dX and multiple scattering models than expected (see RF’s talk). Important to get right for predicting performance of NF & MuCollider. Problem with tails of distributions??? Tails are small-ish, shouldn’t matter?? Some discussion of possibility/necessity of clean dE/dX measurement (~Muscat + Energy Loss) Can MICE, e.g. STEP III, usefully measure dE/dX distribution??? (Probably doesn’t have good enough energy resolution; need de <<1 MeV Very important that we understand what G4MICE (& ICOOL) are using – only ‘physics’ knobs in simulation are dE/dx and scattering. Believe G4 has only one model of dE/dX distribution (anybody know?); several are implemented in ICOOL. This will be important when we start to compare measurements & simulations.