Electrical & Control Power Supplies Trevor Hartnett.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MOM Report Galina Vankova RAL, MICE Video Conference.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE Power Supply System John Joseph LBNL Spectrometer Solenoid Controls & Monitoring Review Dec 11 th 2012.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
MICE HPRF Up-date Tim Stanley RAL – Testing 212 kW achieved from driver stage 4616 #1 at DL, ready for endstage 116 #2. Good experience, in tuning.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
S A Griffiths CM42 June 2015 Electrical & Control.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Electrical Configuration and System Protection
Report Technical Director Storage-Ring-Installation Completed
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
MICE RF System Power Supplies, Control and Monitoring Status report
Electrical & Control.
Focus Coil Quench Detector
Presentation transcript:

Electrical & Control Power Supplies Trevor Hartnett

Decay Solenoid Power Supply - Installation Installed and commissioned, DC contactor replaced with Solid state switch. Solution found for Instabilities. Performance optimisation still required. Remote control to be implemented in November. Cryo plant can then be shutdown until approx. March. 2

Decay Solenoid Power Supply - Commissioning 3

4 Ramping up to 50A Ramping from 680A to 870A Instabilities measured on the output voltage at 13kHz Instabilities significantly reduced after modifying regulation. Power supply successfully ramped up and down to maximum operating current of 870A. Ramping up to 100A

Power Quality Measurement 5 Sub.net power quality measurement system has been built and tested in the MICE hall Awaiting full commissioning of the system ISIS have used the same system to monitor disturbances since February events have been logged, 50% of which resulted in beam loss.

Quench Detection System Racks 6 2 QD systems installed in 1 rack for SS up & down stream 2 QD systems installed in 1 rack for FC 1 & 2

Quench Detection System Racks SS QD System No details available for SS system. A full set of electrical drawings has been requested for SS. Including cable and termination details. A schedule of deliverables has also been requested. A rack housing AC distribution, roof fan and runners has been requested for delivery to USA USA to supply earth leakage protection for FC & SS. 7 FC QD System Separate racks required for FC and SS. Basic rack details known for FC but assembly not started. 2 QD systems have been verified with FC 1 & 2. Data Logger The data logger has been verified with FC 1 & 2. Minor modification required to converter into operation unit. Needs to be integrated into control system and synchronise with SS data logger.

RF Systems (1) 8 RF System in Plant Room 1 TH116 Amplifier installed in MICE Hall at RAL 20 kV Power Supply & Aux. Rack

RF Systems (2) 9 Water panel for RF in MICE Hall Old Crowbar Switch (Thyratron) New Crowbar Switch (Thyristor stack) Testing new crowbar Switch TH116 Tube Cathode Modulator: TH116 Tube On/Off Control

RF Systems (3) Further work: Recommission system #1 at DL with new crowbar switches Build second set of power supplies and control racks Build electrical parts of amplifiers for System #2 Develop control systems for remote operation Test all systems into dummy loads at DL Move to RAL & install in MICE Hall Commission & deliver 4 MW to RF cavity by March