Advanced Project Management Project Time Management Ghazala Amin.

Slides:



Advertisements
Similar presentations
CP Chapter 4 Schedule Planning.
Advertisements

Work Breakdown Structures
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
PMP/CAPM Prep Workshop Time
Eleanor Roosevelt High School
Management & Development of Complex Projects Course Code - 706
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Time Management
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
Project Time Management
Importance of Project Schedules
Chapter 6: Project Time Management
Project Time Management
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
HIT241 - TIME MANAGEMENT Introduction
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Information Technology Project Management, Seventh Edition.
P ROJECT M ANAGEMENT, PMI A PPROACH (PMP) P ROJECT T IME AND S CHEDULE M ANAGEMENT Sayed Ahmed BSc. Eng. in CSc. & Eng. (BUET, Bangladesh) MSc. in CSc.
Chapter 6: Project Time Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s original.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Project Time Management, Mohammad A. UHCL 1 Project Time Management Mohammad A. Rob.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
Scheduling Sequence & Time.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Quick Recap. Work Breakdown Structure (WBS): Set of activities to do (“use cases”) Formats of WBS Risk associated WBS Approaches for WBS Dependency Graph:
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Chapter 6: Project Time Management Information Technology Project Management,
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Time Management
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
SOFTWARE PROJECT MANAGEMENT
Chapter 4 Note: See the text itself for full citations.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Time Management.
Project Management MGT 30725
Based on the PMBOK® Guide 3rd Edition
Chapter 6: Project Time Management
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
PROJECT TIME MANAGEMENT
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Importance of Project Schedules
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Advanced Project Management Project Time Management Ghazala Amin

2 Project Time Management Reference study materials –A guide to the Project Management Body of Knowledge (PMBOK Guide), Chapter 6 –Study notes –Dr. Kerzner’s book, Chapter 12

3 The project life-span can range from very short - for e.g., one week for recataloguing books in a public library - to very long, for e.g., eight years for the construction of a large dam with attached electric power generating station. As with cost, it is often difficult to determine the life-span of a project with a high level of accuracy, especially in the pro-ject‘s early stages. Schedule overruns are common in pro-jects and, like cost overruns, they too are also considered a manifestation of project failure. All projects have a life span, namely, the interval between the point in time the project formally commences and the point in time when it is completed or prematurely terminated. Project Parameters: Time

4 Project Parameters: Time (Important Topics in Project Time Management)  Project Activities  Dependency Relationships Between Project Activities  Project Activity Duration Estimation  Project Milestones  Project Schedule Baseline  Project Gantt Charts  Network Diagrammes (Arrow-on-Arrow, Arrow-on-Node)  Critical Path Method  Programme Evaluation Review Technique  “Crashing“ the Project  Earned Value Method  Time Management Training for Project Staff

5 PMBOK Area: Time Management Project Time Management includes the processes required to ensure the completion of the project within the time-frame which has been allocated for it. Processes covered under Project Time Management are activity definition, activity resource estimating, activity duration estimating, schedule development, and schedule control.

6 Project Time Management Includes the processes required to ensure timely completion of the project Enables effective management of time and resources assigned to project tasks

7 Project Time Management Poor time management is caused by –difficulty in saying no –lack of self discipline –bureaucracy –lack of delegation –poor utilization of staff

8 Project Time Management - Processes Project Time Management processes (per PMBOK) Define Activities Sequence Activities Estimate Activity Resources Estimate Activity Duration Develop Schedule Control Schedule Process GroupsInitiationPlanningExecutionControlClosing Knowledge Areas Time Management Define Activities Schedule Control Sequence Activities Estimate Activity Resources Estimate Activity Duration Develop Schedule

9 Activity Definition Involves identifying and documenting the specific activities that must be performed in order to produce the deliverables and sub- deliverables identified in the work breakdown structure

10 Activity Definition Work breakdown structure is reviewed. Any additional Constraints and assumptions are identified Expert judgment of staff or SMEs are procured Results in; –Finalized Activity list for project delivery –Work breakdown structure updates are made if needed.

11 Activity Sequencing Involves identifying and documenting interactivity logical relationships. Activities must be sequenced accurately to support later development of a realistic and achievable schedule

12 Activity Sequencing Activity list is finalized. Mandatory dependencies are identified Discretionary dependencies are identified External dependencies are identified Milestones are identified Common Tools & Techniques used are; Precedence Diagramming Method (PDM) Arrow Diagramming Method (ADM) Results in; –Project network diagram – Schematic Display of project activities and logical relationships among them. (Eg. ADM, PDM) –Activities will get further decomposed and redefined after establishing logical relationships.

13 Activity Sequencing Precedence Diagramming Method (PDM) –Nodes represent activities –Arrows connect activities and show dependencies –Also referred to as Activity-on-Node (AON) –Uses four type of dependencies: Finish-to-start, finish-to-finish, start-to-start, start-to- finish Activity (A) Activity (B)

14 Activity Sequencing Arrow Diagramming Method (ADM) –Arrows represent activities –Connected at nodes showing dependencies –Also referred to as Activity-on-Arrow (AOA) –Uses only finish-to-start dependencies –May use dummy activity Activity

15 CUPID Unload Dealer Unload Dealer (16) Dealer (18.1 & 18.2) Contact History (6&7) Mileage (5,10&15) Suppression PMC Design Trans. Code Freeze PIT Testing CKS R2 Launch 5/226/2 6/77/27 7/289/6 6/76/23 6/7 6/276/288/8 8/9 8/23 8/1 8/28/18 9/7 9/11 10/27 10/30 PIT Handoff Project Network Diagram – Example

16 Resource Planning Involves determining physical resources and the quantities required to perform project activities –People –Facilities –Equipment –Material

17 Activity Duration Estimating –Involves assessing the number of work periods likely to be needed to complete each identified activity

18 Activity Duration Estimating Activity list is further reviewed and finalized Any additional Constraints and assumptions are identified Resource requirements/capabilities are defined All Historical information is retrieved for estimating Identified Risks with estimation is documented. Expert judgment is used for time estimation Reserve time (Contingency) is built in as risk mitigation Results in; –Activity duration estimates –Activity list updates

19 Schedule Development –Schedule development means determining start and finish dates for project activities

20 Schedule Development Project Management Software is most commonly used for schedule development. Leads and lags are identified for tasks; –Lead: A modification of a logical relationship which allows an acceleration of the successor task –Lag: A modification of a logical relationship which directs a delay in the successor task Resource pool description Calendars and work hours are updated

21 Schedule Development Mathematical Analysis used commonly; Critical Path Method (CPM) Graphical Evaluation and Review Technique (GERT) Program Evaluation and Review Technique (PERT) –Duration Compression Crashing Fast Tracking –Simulation Monte Carlo

22 Schedule Development Critical Path Method (CPM) –Determines early and late start and finish date for each activity –Calculate float –Find least flexible activities

23 Schedule Development Program Evaluation and Review Technique (PERT) –Uses weighted Average duration estimates –PERT uses mean instead of Most Likely estimate used by CPM Pert Calculations –O = Optimistic –P = Pessimistic –M = Most likely –Weighted duration = (O+4M+P)/6

24 Schedule Development Crashing –Maximum amount of compression for minimum additional cost Fast tracking –Overlapping serial activities

25 Schedule Control Schedule control is concerned with –(a) influencing the factors which create schedule changes to ensure that changes are beneficial, –(b) determining that the schedule has changed, –(c) managing the actual changes when and as they occur

26 Schedule Control Project schedule is updated with actual Change requests are reviewed and added to schedule Project Management software is used for updates Results in; –Schedule updates –Documentation of Corrective actions and lessons learned.

27 Schedule Management Plan –Plan for how the schedule changes will be managed –Plan for change control process and procedures, performance measures –This will be part of Project Plan