EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

European Developments Transmission Workgroup 5 th April 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
European Developments: Capacity Transmission Workgroup 6th October 2011.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Project Nexus Workgroup Unique Sites 4 th November 2014.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2nd GTE Conference Copenhagen, September 2004 Author:Milan Sedlacek SPP (Slovak Gas Industry) Slovak Republic GAS TRANSIT THROUGH A NEW EU MEMBER STATE.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Workgroup – Mod 500 Action 703 – confirm current capacity surrender process.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
European Developments Transmission Workgroup 1 st December 2011.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
European Developments Transmission Workgroup 3 rd May 2012.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
EU Phase 3 Customer communications
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Workgroup meeting October 2014
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Capacity Conversion – 616s
20th April 2016 Teleconference
EU Implementation Programme
CMP Transparency Requirements
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
20th April 2016 Teleconference
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
37th IG Meeting South Gas Regional Initiative
EWRC-RAE MUTUAL PROJECTS
20th April 2016 Teleconference
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
Proposer: National Grid NTS Panel Date: 17th April 2014
Enagás, GRTgaz, REN and TIGF
Proposer: Malcolm Montgomery Panel Date: 20/10/16
MOD National Grid NTS Initiated Flow Swaps
EWRC-RAE MUTUAL PROJECTS
Gas European Network Code Implementation
Workgroup meeting October 2014
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Capacity validation, renominations and within-day capacity purchase
Nominations 11 July 2014.
Presentation transcript:

EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what areas/decisions National Grid has autonomy over, and those that must be agreed with other parties.

Nomination Process at IPs 2 Balancing Code Defines: 1.Nomination Deadline 2.Nomination Confirmation Deadline 3.Renomination Process Timings

NG Impact Assessment [May 2013] ImpactsAction MajorNew Nomination procedure at Interconnection Points (IPs) is a significant impact for GB Nomination related procedures contained in Gas Balancing, CAM, CMP and Interoperability Codes NTS have been investigating the interactions between these codes A number of policy/implementation issues have been analysed and our initial view on them has been defined Where possible consistency with the GB regime [non IPs] has been maintained NG NTS is happy to discuss any of these issues in further detail The end to end process/system needs to be mapped Nomination process and policy views to also be discussed with Adjacent TSOs. No code requirement to conduct a specific industry consultation on EU Nominations rules.

Nomination Policy – NG Current View  Nominations can be submitted from D-30 as per the UNC (the EU Balancing Code is silent on this point) [Application TBC with adjacent TSOs]  National Grid will not be offering a Pre-nomination cycle [TSOs may agree to offer]  Over-nomination requests for within-day interruptible capacity will not be offered: [TSO may reject nom if allocated capacity is exceeded and/or may treat over-nom as a request for interruptible capacity]  The GB regime will continue whereby Nominated gas quantities will not be validated by National Grid against any prevailing Entry or Exit Capacity Entitlement except in the case of an Exceptional Event  Any quantities of gas allocated to NTS Users in excess of Entry or Exit Capacity Entitlement will accrue Overrun Charges

Nomination Policy – NG Current View (2)  A User holding both Bundled Capacity and Unbundled Capacity at an IP may submit separate Single Sided Nominations and Double Sided Nominations [CAM/Bal is only concept level – application TBC with adjacent TSOs]  A ‘Single Sided Nomination’ is a notice issued by a User to an Initiating Transporter, who forwards this to the Matching TSO  A ‘Double Sided Nomination’ is a notice issued by the User/s either side of an IP to their respective Transporters  National Grid intends to maintain the requirement for the provision of flow notifications from operators at NTS entry and exit points (i.e DFNs and OPNs) [TSO may require network users to provide further information]

Nomination Assumptions  Prior to the implementation of the Nomination rules, National Grid and the adjacent Transporter will agree (and specify within the IA):  Identity of Initiating Transporter and the Matching Transporter  The harmonised information contained within the data exchange for the matching process - ‘EDIGAS xml’ messages will be utilised  The agreed method to ensure that the Processed Quantities for the National Grid User and the User’s Counterparty are equal (which by default shall be the ‘Lesser Rule’)  The adjacent TSO will be; Interconnector UK (IUK), BBL & Gas Link (subject to outcome of two way/three way capacity bundling discussions)

Nomination Process Overview

Example 1 – “Easy” match (Double Sided Nom)

Example 2 – “Easy” match (Single Sided Nom)

Example 3 – “Easy” match (Multiple Double Sided Nom)

Example 4 – Lesser Rule (Double Sided Nom)

Example 5 – Overrun (Double Sided Nom)