IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February 2010 o IBL Status, TDR & MOU ATLAS Week CERN, February 26, 2010 G. Darbo - INFN.

Slides:



Advertisements
Similar presentations
3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:
Advertisements

Status of the ATLAS MM project
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The ATLAS Insertable B-Layer (IBL) Project C. Gemme, INFN Genova On behalf of the ATLAS IBL COllaboration RD11 Firenze July 2011.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
IBL MoU G. Darbo – INFN / Genova 24 April 2010 o IBL MoU ATLAS Upgrade Week DESY, April 24 th 2010 M. Nordberg, M. Nessi, C. Gößling, H. Pernegger Presented.
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
July 17, 2013 CERN T. Flick University of Wuppertal.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
Norbert Wermes, University of Bonn WP3: Development of radiation-hard high-density electronics and interconnection with sensors Talent.
The FE-I4 Pixel Readout System-on-Chip for ATLAS Experiment Upgrades Tomasz Hemperek on behalf of ATLAS Pixel Collaboration.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
Giulio Pellegrini 27th RD50 Workshop (CERN) 2-4 December 2015 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona 1 Status of.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
The ATLAS IBL Project – 5 th Trento Workshop G. Darbo – INFN / Genova Manchester, February 2010 o The ATLAS IBL Project The 5 th "Trento" Workshop.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
The ATLAS Insertable B-Layer Detector (IBL) F. Hügging on behalf of the ATLAS IBL collaboration Pixel th International Workshop on Semiconductor.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
Manchester, 24/02/2010 G.-F. Dalla Betta The common floor-plan of the ATLAS IBL 3D sensor prototypes Gian-Franco Dalla Betta (Univ. Trento and INFN) for.
DT-LHCb coordination meeting 18 April 2016
IBL Technical Aspects H. Pernegger / CERN.
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Mini-drawers, FE-ASIC , Integrator
TK Upgrade report.
WG4 – Progress report R. Santoro and A. Tauro.
Francesco Forti University and INFN, Pisa
Communications Share Point Collaborative WS:
Update on ATLAS insertable B-layer
HL-LHC upgrade at IPHC news
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February 2010 o IBL Status, TDR & MOU ATLAS Week CERN, February 26, 2010 G. Darbo - INFN / Genova Indico agenda page:

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Talk Overview Update on technical progress in the IBL FE-I4: November readiness review, next submission. Stave: December review, baseline Sensor prototype program R/O: towards a baseline Schedule Chamonix impact on schedule TDR and interim-MoU

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Project Goals Improve Physics performance of the present Pixel Detector: Reduce material budget to an “aggressive” 50% of B-Layer, i.e. <1.5 X/X 0 at η=0 Have low R/O inefficiencies at LHC ultimate luminosity and above (2.3x10 34 ÷ 3x10 34 cm -2 s -1 ) Increase radiation hardness by a factor five: 5x MeV neutrons/cm 2 Back-up existing tracking system in case of serious failure of the B-layer Keep installation schedule for end of 2015 Insurance for hard failures of existing B-Layer and Pixel system Need a long LHC shutdown (8 months): no long term plans after 2012, but machine needs many shutdowns for the long list of upgrades to bring to the nominal and ultimate luminosity (phase I). Work for a safe procedure to extract beam-pipe and insert IBL: Damage could result in a downgrade more than an upgrade! Let’s go through the major IBL Technical progresses

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Sensors - Convergence 3 sensor technologies considered for IBL Planar, 3D and Diamonds Full scale prototypes with FE-I4 – Decision on spring 2010 Common agreed specifications: Max fluence > 5 x MeV neutrons / cm 2 Max power after full life dose < 200 mW/cm 2 Low dead area in Z: slim or active edge Maximum bias voltage (system issue) : 1000 V Planar promising slim edge Hamamatsu has shown <500µm edge can stand ~1000 V (on b-type at moment) – one or two guard-rings Diamonds: new producer – very promising results. “II-IV Incorporated”: measured very promising Charge Collection Distance (CCD) of V/µm (not saturated) on 4 FE-I4 size sensors from a 1.5 mm thick wafer (standard production, not designed for HEP). II-IV Incorporated 4 FE-I4 size sensors Ref: M. Mikuž– IBL GM 12/2/2010

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February D Sensor – Common Floorplan The 4 producer facilities work on a common floorplan for FE-I4: 150 wafers (same raw material bought in common), double side and single side (active edge). Sharing process steps (wafer bonding, poly-silicon column filling). Processing runs starting now, expected (plenty of) sensors by summer. Producers 8 x FE-I4 Ref: C. Da Vià – IBL GM 12/2/2010

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February FE-I3  FE-I4 FE-I4 Collaboration: Bonn: D. Arutinov, M. Barbero, T. Hemperek, A. Kruth, M. Karagounis. CPPM: D. Fougeron, M. Menouni. Genova: R. Beccherle, G. Darbo. LBNL: S. Dube, D. Elledge, M. Garcia- Sciveres, D. Gnani, A. Mekkaoui. Nikhef: V. Gromov, R. Kluit, J.D. Schipper The first version of full FE-I4 chip will be submitted by end of March 2010 ~70 million transistors, 0.13 µm CMOS technology 6 Cu and 2 Al routing layers. 7.6mm 8mmactive 2.8mm FE-I3 74% 20.2mm active 16.8mm ~2mm ~200 μ m FE-I4 ~89% Chartered reticule (24 x 32) IBM reticule ~19 mm FE-I3FE-I4 Pixel size [µm 2 ]50x40050x250 Pixel array18x16080x336 Chip size [mm 2 ]7.6x x19.0 Active fraction74%89% Analog current [µA/pix]2610 Digital current [µA/pix]1710 Analog Voltage [V] Digital Voltage [V] Pseudo-LVDS out [Mb/s]40160

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February FE-I4: Submission Status Second FE-I4 review (Nov 3÷4) Review board: F. Anghinolfi/CERN, R. Van Berg/U Penn, K. Einsweiler/LBNL, Ph. Farthouat/CERN, A. Grillo/UCSC, K. Kloukinas/CERN. X. Llopart/CERN, M. Newcomer/U Penn. I. Peric/Heidelberg. N. Spencer/UCSC. The review agenda with documentation and reviewer’s report (ATU-TC-MR-0002) are available at: Report Summary: The second design review of the FEI4 was held on 3 and 4 November This report gives remarks and recommendations to the design team. Progress is excellent, but it is recommended to hold a brief final design review before the actual submission takes place. Next steps: March 17 (or 16 or 18 still TBD): sign off meeting with review committee March 24: Final meeting – Probably engineer’s final sign-off. March 29:submission

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February BOC/ROD Convergence in the VME BOC/ROD to a common design (Bologna, Genova, Göttingen, LBNL, Heidelberg, Wuppertal): workshop at CERN in Feb. Reduce overall design to 3 FPGA: one with a PowerPC core to replace master DSP functionality. Move functionality from the 4 slave DSP (for parameter fitting made during calibration) to external (standard) PCs: transfer raw histograms by Gbit ethernet for fittings in the PCs: a today PC core has an equivalent processing power of ~10 DSP of the existing ROD. The modernized VME system has advantage in performance (speed and double channel density) and simplified design (less components and unique software framework to design FPGA with embedded PowerPC) Already some work done in porting DSP code to standard PC and compiling the multi FPGA VHDL code into a single device. Alternative option (SLAC) considers ACTA (Advanced Computer Telecommunication Architecture) technology (SLAC. Stony Brook) Use the ACTA standard instead of VME Other components in the standard ATLAS TDAQ need to be modified in hardware and software (no TIM, no SBC). Development system in place at CERN with a prototype board to read FE-I3 module.

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Stave: Review and Baseline Stave review hold on Dec.17: Reviewers: F. Cadoux, A. Catinaccio, M. Gilchriese, T. Jones, G. Viehhauser Two main recommendations: Coolant and cooling pipe/fittings Coolant: “Adopt CO 2 cooling as the baseline for the IBL. The cooling plant should be a copy of the LHCb VELO plant, with minimal modifications to adapt the system to the ATLAS geometry.” Pipe: Adopt metal cooling pipes as the baseline for the IBL. Significant efforts have already been invested in Titanium pipes, but more R&D is required for this technology (bending, connections etc.). Decision from IBL Management and TC IBL management and Institutes (D, F, I, CERN) participating in the Stave project fully support the two recommendations. R&D and prototyping on C 3 F 8 and Carbon Fiber pipes continue, but priority is given to baseline: CO 2 and titanium pipes. From ATLAS TC side CO 2 cooling plant and services are accepted. For maintenance and operation the IBL CO 2 plant can be incorporated in the ATLAS cooling (similar to the other plants that exist already). There is no obvious show stopper to the installation of plant and services. There are no safety concerns given the very small number of pipes and very small quantity of CO 2 (20g/s).

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Stave Prototype Options STAVE CARACTERISTICSSIMULATION RESULTS Pipe ID/OD [mm] Omega Thickness [µm] Foam Density [g/cm 3 ] CoolantX/X 0 [%]Thermal Figure of Merit (Γ) [ºCcm 2 /W] Bare Stave with Coolant Full layer (+ Module + Flex) CF pipe, heavy foam 2.4 / C3F8C3F CF pipe, light foam 2.4 / CO Ti 3mm pipe, light foam 2.8 / C3F8C3F Ti 2mm pipe, light foam 2.0 / CO / Module parameters Sensor thickness = 250 µm FE-I4 thickness = 90 µm Flex Hybrid (η = 0) = 0.18 % of X 0 Additional technical requirements & prototype work: Max pressure of cooling pipe: 100 bar. Gravitational / thermal deformation < 150 µm. Develop pipe joints and fittings. Isolation of the carbon foam from sensor high voltage. Mock-up for thermal measurements. Carbon Foam 0.25g/cm 3

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February IBL Layout Baseline layout decided 14 Staves, “reverse turbine” (there were two main options in Barcelona) Beam-pipe reduction: Inner R: 29  25 mm Very tight clearance: “Hermetic” to straight tracks in Φ (1.8º overlap) No overlap in Z: minimize gap between sensor active area. Layout parameters: IBL envelope: 9 mm in R 14 staves. = 33 mm. Z = 60 cm (active length). η = 2.5 coverage.

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Extraction/Insertion Progresses on many areas: Installation mock-up (Geneva) in bld 180 Extraction/Insertion “table” (CERN/LPSC Grenoble) Guiding tube (Brandeis) Beam-pipe flanges IBL Envelopes ALARA Installation Mock-up in bld.180

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Guiding Tube To extract beam pipe and insert IBL use a “Guiding Tube” Gravity sag of a simple unloaded 7 m-long tube (40 mm) is not acceptable Working Model of the Long Guide Tube (Brandeis Un.) – Used by the muons Extruded tube with hole for tension rod and guide for RASNIK inserts. Preformed so that it “falls” into a straight tube when unloaded. Additional instrumentation: temperature sensors and load cells. Control system to adjusted tensions based on RASNIK readings as load changes. Internal sensors include 4 overlapping RASNIKs and temperature sensor. Ref: J. Bensinger – IBL GM 12/2/2010

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Other Areas of Activity Most of the project is covered and many design, prototype work ongoing FE-I4 single module test system (Bonn, Göttingen) Bump-bonding (Barcelona, Bonn, Milano) Prototyping with dummies at IZM and Selex Flex-hybrid: (Bonn, Genova) Multi-layer Cu/Al and stackable single layer/single module technology test prototypes. Internal services and data transmission (SLAC) Opto-link, opto-boxes (Ohio SU, Oklahoma and Oklahoma SU) LV PP2 (Milano), DCS (Wuppertal) Module loading (Geneva, Marseille) Test beam, telescope,…

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Software Simulation Software simulation work ongoing: IBL Geometry implemented in the ATLAS ATHENA/GEANT4 framework Digitization for planar and 3D sensors Preliminary results with single track ttbar (and other physics) benchmark results ready (in discussion) In a few week expected to have results of physics performance. ATLAS no IBL d 0 for 1GeV muons z 0 for 1GeV muons ATLAS no IBL ATLAS with IBL Disclaimer: plot below to show that the full machinery works… under discussion - need to be validated! Ref: D. Tsybychev et al.

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February IBL Schedule & Milestones Major milestones: FE-I4.v1 submission: end of March 2010 Dummy-sensor bump-bonding prototyping: from now to ~Nov 2010 Start bump bonding 1 st batch of sensors & chips: August 2010 First modules available: October 2010 Sensor decision: in Jan 2011 or May 2011 Submission of FE-I4.v2: March 2010: (is optimistic?! given the complexity of the chip and the measurements on version 1) Sign-off on stave design and release production: Oct 2011 Loaded Staves completed: end 2013 Service installation in the pit 2012 Integration first half 2014 Installation earliest: end 2014 Ref: H. Pernegger – IBL GM 12/2/2010

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February IBL Technical Design Report Editors: M.Capeans (CERN), K. Einsweiler (LBNL) Chapter Editors: G.Darbo, T.Flick, M.Garcia-Sciveres, C.Gemme, H.Pernegger, O.Rohne, R.Vuillermet and quite many Contributors to different chapters: A.Andreazza, O.Beltramello, A.Catinaccio, I.Dawson, D.Ferrere, KK.Gan, D.Giugni, Y.Gousakov, N.Hartman, I.Hinchliffe, F. Huegging, S.Kersten, N.Massol, P.Morettini, D.Muenstermann, L.Nicolas, M.Raymond, S.Rozanov, D.Su, W.Trischuk, C.da Via, E.Vigeolas and S.Wenig Chapters’ Structure: 1.Overview – IBL history, lifetime and failure issues, requirements, physics 2.Modules – sensors (3 technologies), FE electronics, integration (bump-bonding, “mini- Flex”) 3.Staves - mechanical concept for the stave, module loading, cooling and thermal issues, electrical integration, internal services 4.Integration - mounting staves with beampipe, services integration, final surface testing 5.Control, Readout, and Integration - power supplies, opto-links, off-detector readout electronics, external services, cooling plant, DCS, integration with the present detector DAQ/DCS 6.Installation – beampipe extraction, mock-up, IBL transport and installation, connection and testing 7.Commissioning – calibration, early data-taking plan with random triggers, charge injection, cosmic ray data-taking 8.Prototyping, Production Testing, System Testing 9.Critical Integration Issues – cooling, bakeout, powering, material budget… 10.Project Management and Organization © M.Capeans, K.Einsweiler – Feb 2010

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February M.Capeans, K.Einsweiler - Feb 2010 © M.Capeans, K.Einsweiler

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February IBL TDR, Status and Outlook Excellent technical progress in the project overall Fairly complete internal draft ready About 160 pages available at Reviewed by a team of experts till March 21 st : A.Andreazza, A.Catinaccio, A.Clarck, N.Hessey, L.Rossi, S.Stapnes, G.Viehhauser, N.Wermes Expect to distribute a complete first draft to the IBL collaboration by end of April 2010; two iterations foreseen This could allow submission of the IBL TDR to the LHCC in June 2010 © M.Capeans, K.Einsweiler – Feb 2010

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Memorandum of Understanding IBL MoU: Between The ATLAS COLLABORATION, and Funding Agency/Institution of the ATLAS Collaboration (for the ATLAS construction was between Institutes and CERN) Decided to go to an interim-MoU: Decision on sensor technology (early 2011) Consolidate interest of Institutes and availability of funds Draft i-MoU Document body: “Political & Binding rules” In discussion with NCP’s “Annexes”: Project divided into “11 MoU Items”: share of contribution in cost and manpower/responsibilities. Table filled following “item by item” discussion with interested institutes (Institute Leaders or their Proxies) Common discussion in the Pixel Extended IB on March 1st …

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February i-MoU Annex 1: Items (Sensor Example)

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Annex 4: Tentative Contribution to IBL Note: the numbers in the table "are not final, nor are the suggested financial contributions yet firm, but are meant for a common overall discussion.” Technology options refer to supplementary costs that are sensor technology specific and will be known before the definite MoU takes effect.

IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February Conclusion IBL Project well advancing Most of it covered with design and prototype work TDR Big progress, little delay (~2 months) Memorandum of Understanding In discussion, first Pixel Extended IB next Monday to discuss MoU IBL Collaboration very motivated: a lot of high quality work!