N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.

Slides:



Advertisements
Similar presentations
The Role of Environmental Monitoring in the Green Economy Strategy K Nathan Hill March 2010.
Advertisements

National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Oncor’s EIM Program.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Progress on 2006 Committee Recommendations Mark McKinnon Project Manager.
Building the LTER Network Information System. NIS History, Then and Now YearMilestone 1993 – 1996NIS vision formed by Information Managers (IMs) and LTER.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
The Challenge of IT-Business Alignment
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Resources Performance time. resources Performance time 2.
McMullinEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing: SSG (AIPS++/CASA) Development J. McMullin.
PROPOSED PROJECT TITLE Company, Principal Investigator, Phone, Contract Cost Short term goals: what will be accomplished or delivered in this contract.
U.S. Department of Energy Office of Science Advanced Scientific Computing Research Program NERSC Users Group Meeting Department of Energy Update September.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
NRAO Users Committee Meeting May 20-21, National Radio Astronomy Observatory NRAO Users Committee Meeting – May 20-21, 2008 ALMA Operations Chris.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Common Archive Observation Model (CAOM) What is it and why does JWST care?
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
RupenEVLA Advisory Committee Meeting May 8-9, Scientific Oversight and Testing of Software Michael P. Rupen EVLA Project Scientist for Software.
Post-processing Overview Bryan Butler, for Joe McMullin.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
S.T.MyersEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing Overview Steven T. Myers AIPS++ Project Scientist.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
RupenEVLA Advisory Committee Meeting May 8-9, Software Testing Michael P. Rupen EVLA Project Scientist for Software.
Establishing (or Enhancing) PMO Effectiveness Nicolle Goldman, PMP March 28, 2007.
TeraGrid’s Process for Meeting User Needs. Jay Boisseau, Texas Advanced Computing Center Dennis Gannon, Indiana University Ralph Roskies, University of.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
Change Agents Why your Transformational IT Initiative Will Fail Without Them Terri Campbell Sr. Director of Change Leadership.
EVLA Overall Software Design
Establish Process Governance
EVLA Computing Software Overview.
VLA to EVLA Transition Plan
NRAO Computing Re-organization
EVLA Computing Reorganization
Science Commissioning
Gustaaf van Moorsel September 9, 2003
Software Requirements
Mark McKinnon EVLA Project Manager
NRAO End to End Integrated Operations
EVLA Advisory Committee Meeting, March 19-20, 2009
Observatory Science Operations
EVLA Operations Jim Ulvestad
Observatory Science Operations
Post-processing Overview
Preliminary Project Execution Plan
Presentation transcript:

N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill

N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 The Organization After a three-year period of focusing software resources on meeting the objectives of individual telescope projects, the NRAO End to End Operations Division was formalized on April 3, Currently consists of N. Radziwill (management) and Ed Fomalont (science) Key stakeholders include NM Operations, EVLA Development, ALMA Development, GBT Operations, NAASC/NA ARC Many staff already involved in relevant planning, design and/or prototype development; leveraging this immediately

N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 Mission To broaden access to NRAO facilities, enabling all astronomers to focus on the science rather than the instrumental details To increase science impact and throughput via improved quality of data and efficient delivery of science products To help NRAO better optimize its investments in software, services and resources (e.g. through reuse of ideas, models, systems and information stores) Provide a sharp focus on the community… deliver what’s needed by users internal and external to NRAO, at the appropriate times

N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 What’s Changed? Strong executive sponsorship Stakeholders involved from the beginning Recognition that EVLA effort must be supplemented Committing to several smaller intermediate deliverables Managing tightly coupled feedback from scientists and lead users into computing and software development Setting realistic goals, compatible with affordable resources in development and maintenance stages, aligned with operations Simplifying ideas, clarifying objectives/task definitions, communicating across sites more effectively Answering the critical question for many computing staff at NRAO: how do I fit in with overall NRAO development?

N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 Common Terminology Classifications of work: Monitor & Control – Real-time systems that command the telescopes, instruments and data acquisition and monitor their status Data Post-Processing – Systems that generate science products from the raw data (calibrated data, reference images) Scientific Support Systems – Systems and processes that facilitate the users’ access to the telescopes and the science products (proposal system, observation preparation, pipelines, archives) e2e Operations Division provides a concerted focus on supporting the users of our facilities and their access to data: Research based on proposing new observations Research based on archived data

N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 Tactical Plan Q Make incremental progress in technical areas while developing strategic plan: –VLA/VLBA Pipeline Vitalization & Data Center Gap Analysis; can we start populating archive with images now? –Proposal Tool/Data Model Summit –Shared Source Catalog Repository –Achieve readiness for extended user testing with CASA –Science Capabilities Blueprint Develop strategic plan: –Organizational plan (org chart, staffing, roles, responsibilities) –Normalize development plans for all sites/projects –Develop unified terminology, management metrics –Survey employees’ collaboration habits

N. RadziwillEVLA NSF Mid-Project Report May 11-12, Strategic Goals Develop and manage to Strategic Plan. Elements will include: –Complete description of the new division, its roles and responsibilities with respect to EVLA computing, and –Detailed project plan for supplementing EVLA computing to ensure that immediate needs (Milestones A and B) are being met – while not losing sight of the bigger picture (Milestones D and E: Full Science Observing) Ensure timely completion of key functionality and release to users of CASA data post-processing software Complete Data Integration Plan (roadmap for information repositories needed for e2e) Define Common Operational Model (VLBA, EVLA, ALMA, GBT) External annual reviews established

NRAO e2e Operations Stakeholders NM Ops (Ulvestad) GB Ops (Prestage) NAASC (Carilli) NA ARC (Hibbard) EVLA (McKinnon) ALMA (Russell) EVLA Science (Rupen) ALMA Science (Brogan) GBT Science (Balser) Systems Development (Radziwill) Principal Scientist (Fomalont) EVLA Software (Butler) NAASC/ALMA Software (Glendenning) GBT Software (Shelton) Staff Solid lines indicate exclusive reporting relationships Dotted lines indicate shared reporting relationships with line managers in operations groups Day to day management from line managers; strategic steering from NRAO e2e Operations Funding from NRAO e2e Operations in yellow, from EVLA/NM Ops in Blue, from ALMA in peach, from GBT in Green Data Processing (McMullin) Science Advisory DSAA (Frail) Advanced Algorithms (Myers) VO Advisory (Tody) AD, e2e Operations Division (Radziwill) under development