1 Application of New PICMG µTCA for Physics Specifications to Accelerator Control Ray Larsen, SLAC & Kay Rehlich, DESY TWEPP 2010 Workshop Aachen, Germany.

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Ray Larsen Chris Adolphsen Chris Nantista ARD Division SLAC National Accelerator Lab ILC GDE Meeting Beijing March
SLAC uTCA review 4-5 June 2012 Anders J Johansson Lund University Some slides from Zheqiao Geng and Tom Himel)
2D Detectors DAQ Overview 2D detectors are organized as tiles providing 10G Ethernet serialized portions of the full.
The Implementation Strategy Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Shelf Management & IPMI SRS related activities
Messages from our friends a few slides about xTCA projects of colleagues that did not manage to come to Perugia M. Joos, CERN17th meeting of the xTCA IG.
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
The planned new system Tom Himel Dec 1, Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Power Supply Controller Architecture
XTCA activities at CERN Markus Joos PH-ESE xTCA interest group – Background – Report of the 2 nd meeting (held on 7.3.) uTCA evaluation and AMC development.
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Tomasz Czarski, Maciej Linczuk, Institute of Electronic Systems, WUT, Warsaw LLRF ATCA.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
SLAC ILC High Availability Electronics R&D LCWS IISc Bangalore India Ray Larsen, SLAC Presented by S. Dhawan, Yale University.
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
21 March 2007 Controls 1 Hardware, Design and Standards Issues for ILC Controls Bob Downing.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Operations, Test facilities, CF&S Tom Himel SLAC.
Slide ‹Nr.› l © 2015 CommAgility & N.A.T. GmbH l All trademarks and logos are property of their respective holders CommAgility and N.A.T. CERN/HPC workshop.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Communication in ATCA-LLRF System Presenter:
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Content: Introduction Architecture Future.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
Kay Rehlich xTCA RT2012 MicroTCA.4 Timing Distribution and Power Supply Issues.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser DESY Status and Possible Controls Contributions to the ILC Kay Rehlich.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Standard electronics for CLIC module. Sébastien Vilalte CTC
XTCA Workshop Topic Suggestions Ray Larsen, SLAC TWEPP 2010 Workshop Aachen, Germany September 22, 2010.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
MicroTCA Development and Status
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
SLAC I&C Division / EE Department
LLRF Research and Development at STF-KEK
LIU – SPS Low level RF Updates and schedule G. Hagmann,
Future Hardware Development for discussion with JLU Giessen
ILC LLRF Status Ruben Carcagno, Brian Chase
New xTCA Developments at SLAC
WP02 PRR: Master Oscillator and RF Reference Distribution
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Electronics requirements for special diagnostics for the XFEL
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Breakout Session SC3 – Undulator
Presentation transcript:

1 Application of New PICMG µTCA for Physics Specifications to Accelerator Control Ray Larsen, SLAC & Kay Rehlich, DESY TWEPP 2010 Workshop Aachen, Germany September 22, 2010

2 22-Sep-10 Topics 1.1. Background & PICMG xTCA for Physics Initiative 2.2. Industry Developments to new Physics Standards 3.3. DESY R&D for XFEL Controls 4.4. SLAC R&D for ILC, Main Linac Upgrade 5.5. Summary Conclusions 6.6. Acknowledgments xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

3 1. Background & PICMG xTCA for Physics Initiative xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

4 22-Sep-10 Background: ILC at SLAC, DESY ILC Snowmass 2005 –Proposed ATCA as model for ILC controls and beamline instrumentation systems –Based on simulation model showing ILC needed large improvements over many existing systems to achieve goal of 85% uptime –Led to pilot R&D programs at SLAC for I&C, magnet power supply systems, modulators, tunnel AC electrical systems, 2-tunnel design –Led to DESY proposals for ATCA (LLRF) and µTCA (Tunnel Controls) under XFEL Joint formation of Standards Collaboration 2009 –First ATCA Workshops at FNAL 2007 and Dresden 2008 –Led to formation of new PICMG standards collaboration for Physics May 09 Lab-Industry collaboration for new IO standards ATCA, µTCA µTCA double-wide vastly improved analog design space Timing and triggering extensions maintain PICMG industry base compatibility xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

5 22-Sep-10 PICMG Physics Membership Lab members  Founding Members: DESY, FNAL, IHEP, SLAC  Additional Lab Members: IPFN Lisbon, ITER, CERN Industry Members  Founding Members: Cypress Point Systems, Performance Technologies, Triple Ring Technologies  Additional Members: ~43 companies total Hardware Committee, Software Committee  See next slide xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

6

7 ATCA-MicroTCA Spec Family xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

8 22-Sep-10 PICMG Subcommittees & Work Products Coordinating Committee General community committee to suggest new work products, form teams for new lab-industry open-source standards extensions Hardware Committee (Timing & Synchronization): Goal: Hardware extensions for both ATCA, µTCA (MTCA) Work Products: Mechanics for standard IO; AMC and RTM modules, precision timing and triggering distribution Chair R. Downing, Secretary V. Pavlicek, Editor R. Somes (meet weekly) Software Committee (Architectures & Protocols): Goal: Software guidelines for high availability, interoperability Work Products: Software design for high availability; standard management products such as HPM.1; generic real time application drivers; preferred practices; open source solutions for physics Chair S. Simrock. Secretary Gus Lowell, Editor R. Larsen (try to meet weekly) Coordinating Committee Determine overall program, formation new subcommittees, work products Chair Ray Larsen, Secretary Gus Lowell, Editor Zhen’An Liu (meet monthly as needed) xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

9 22-Sep-10 xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY Work Products Deliverables HW WG1 SOW reviewed in Committee June 8, Rear I/O for ATCA connectors, keying, e-keying 2. IPMI for AMC RTM power, JTAG, hot swap 3. µTCA double-wide AMC, µRTM, IPMI, power, JTAG, hot swap SW WG2 SOW Charter 1.Routing and Protocols 2.Latency 3.High Availability Software 4.System/Rack/Module Management 5.Operating Systems & Infrastructure, processing & Libraries 6.Processing and Operations Libraries 7.Common blocks APIs for processing, software-firmware mgmt 8.Auto-faílover software design Reference Designs –Test all specifications with reference designs –Develop standard infrastructure toolkit for lab R&D groups

10 2. Industry Developments to new Physics Standards xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

11 22-Sep-10 Industry Developments for Physics ATCA –Standard design drawings for new RTM interface2 Standard shelves 6-Pack & 12-Slot –In pubs drafting at SLAC for spec figures µTCA –Shelf & Module Prototypes from 3 vendors 6 payload slot development unit, non-redundant low cost. Latest unit with Physics timing backplane now in delivery 12 payload slot production prototype fully redundant dual star backplane Test modules of AMC and RTM dual wide units –Modules Power & cooling units, MCH Hub Switcher w/shelf manager, controllers all available from multiple vendors –Application AMCs 10 Ch fast ADC 2Ch DAC in test ing for DESY RF Other industry designs in progress by DESY, SLAC & Stockholm xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

12 22-Sep-10 MTCA Prototype Chassis, AMC, µRTM Courtesy K. Rehlich DESY 6-Slot shelf 2-wide AMC 2-wide RTM Backplane Edge Connector RTM I/O Connector Front Panels Rear I/O Panels xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

13 xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

14 ELMA 6 & 12-Slot xTCA4Physics Shelves xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY Dual 6-Slots in Rackmount 12-slot Design in Progress

15 xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY Backplane Timing, Vector Sum, Interlock Lines Vector Sums Interlock Sums

16 Struck SIS 8300 RF Digitizer xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY RTM Connector AMC Connector 10 Ch 16 bit 125 MSPS 2 Ch 16 bit DAC output Virtex 5 FPGA

17 6-Payload Slots w/ Physics Backplanes xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

18 6-Slot w/ 2-wide Modules xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY NAT MCH Kontron IOC Processor Vadatech PMC Adapter (Front IO Only) MicroResearch PMC Event Receiver (Front IO Only)

19 Standard MCH in 2-wide Panel Detail xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

20 3. DESY R&D for XFEL Controls xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

21 xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY DESY: µTCA for the XFEL 3.3 km HERA DESY Hamburg City Centre (7km) FLASH XFEL

22 xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY XFEL: µTCA Controls Inside Tunnel BPM Front-end Special format Coupler Interlock LLRF ControlKlystron Control Diagnostics Crates in one RF section Experiments Superconducting linac

23 µRTM: 1.3GHz down converter Pulse shaper for photo diodes BPM interface xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY Double Size RTM w/ ADC AMC AMC Struck SIS8300: ADC: 10 channel, 16 bit, 125MSPS FPGA: XILINX Virtex5 DAC: 2 channels

24 Application specific µRTM: different interlock modules Wire Scanner interface …. xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY Double Size RTM and Digital AMC FMC 4*SFP Virtex 5 Versatile DESY AMC 2: 54 diff pairs to RTM Virtex 5 based digital I/O 1 FMC slot + 4 SFP slots

25 xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY Double Size Versatile AMC: DAMC2

26 22-Sep-10 MTCA Backplane Timing Distribution xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY Central Timing 2 radial clocks per AMC, low jitter 8 bussed lines, M-LVDS for Clocks, triggers, interlocks

27 22-Sep-10 Timing Module Prototype xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY Timing AMC (University of Stockholm) Fiber optic links w/ drift compensation ps stability AMC module is receiver and transmitter Clock, trigger and event distribution

28 4. SLAC R&D for ILC & Main Linac Upgrade xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

29 22-Sep-10 Current SLAC xTCA R&D ILC Funded R&D –Develop µTCA industry supported infrastructure* based on new standards Shelf, Physics IO applications modules and RTMs, Reference design IPMI & Power Timing & triggering support * Components available from at least trwo vendors –Demonstrate managed platform on L-Band RF Test Stand Klystron & SC Cavity Coupler testing – joint with FNAL Developed ATCA VME Adapter for VME interlocks (now dropped) Developing MicroTCA interlock system to replace VME+RTMs with 1/3 number of boards Interface new Marx Modulator embedded controls and diagnostics to µTCA interlock system xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

30 22-Sep-10 SLAC R&D 2 Major Lab Controls Upgrade Initiative (new) –Upgrade Controls for entire 2-mile linac (Currently CAMAC w/ VME Distributed Overlay in LCLSI) –Phase I: Pilot demonstration of single RF station and 40 ft of beamline instruments –Phase II: Upgrade 80 RF stations for LCLSI and 80 more stations for LCLSII –LCLSII approved for construction by ~2015 Uses middle 10 Sectors of Linac, 80 RF Stations Convert all CAMAC instrumentation for LCLS II Major Issue: Time and resources to develop µTCA solution xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

31 µTCA Station Node w/RF & Interlocks xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

32 22-Sep-10 Are we ready for µTCA Prime Time? Strategy of current ILC xTCA for Physics standards R&D program –Equip, train lab engineers to master µTCA –Develop key infrastructure for controls, DAQ applications –Procure industry prototypes for lab development –Use R&D funds, new upgrade opportunities to develop key modules with industry (XFEL model already working) –Develop Reference Designs, hardware-software test environment including IPMI (Intelligent Platform Management Interface) –Acquire engineering tools, invest in training programs xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

33 22-Sep-10 Strategy for Linac Upgrade Project Collaborate to minimze development time, cost –Work w/ DESY & other labs to develop >/= 2 industry sources for key infrastructure & applications modules –Available now in Physics platform: Shelves, power & cooling, MCH, Processors (Schroff, Elma, PT, NAT, Kontron, ATMEL, Vadatech...) –In progress/discussion: Timing modules* (DESY-Stockholm-Vendors TBD) RF, BPM digitizers (DESY-Struck, SLAC-Vadatech) Industry-Pack Adapters (2-3 IPs) (TEWS, Vadatech) FPGA generic AMC w/ FMC Adapter (DESY-EMC, SLAC- Vadatech) * 3 versions: Tx-Rx, Tx, Rx xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

34 22-Sep-10 Generic AMC Solution Examples xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY GENERIC AMCAPPLICATIONRTM1RTM2RTM3 10 Ch ADC- DAC 125 MSPS 16 bit LLRF ControlAdapter to IPMI managed downconverter Photodiodes pulse shaper BPM calbration- filter- gain 4 Ch ADC 125 MSPS 16 bit BPM (2), Toroids (2) BLEN (1) Model 1 with minor options serves all (5) FPGA DAMC2 w/FMC option Fast-slow interlocks, opto TxRx Interlock Analog Wire Scanner Analog Other FPGA Interlock w/20MSPS ADCs (in dsgn) 16/30 Fast/Slow interlocks mod- kly, vacuum... 2 KSPS ADCs, gain adjust 3-IP Adapter Interface Modulator cntrl Motor drivers Readback IO analog conditioning, calibration App dependent

35 22-Sep-10 Upgrade Strategy 2 Develop linac RF section node in single 12-slot µTCA shelf including: –RF station downmix, digitize, FPGA processer, feedback, protection interlocks, klystron power supplies –Modulator, power supplies Enet interface –Profile Monitor Beam Length readout, control –Stripine, cavity BPMs –Toroids, Beam Containment Toroids –Vacuum gauge readout, pump control –Cable plant, adapters to RTM cables, rack cooling –Industry AMC payload modules w/ mostly lab-designed RTMs Concentrate in-house engineering on subsystems –System design, RTM design, FPGA FW, SW & EPICS design xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

36 22-Sep-10 Upgrade Proposal Status Presentation overall plan at management review late October 2010 –First estimate resource loaded schedule submitted for pre-review –Engineering manpower, project managment team presonnel in development –xTCA experienced SW-FW engineers on board Total Upgrade timetable in discussion –Several stages over 5-6 years for LCLS I & II, HEP experiments using sectors 0-20 over next 4 years) Successful Lab-Industry Collaboration essential xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

37 22-Sep Summary Conclusions The lab-industry collaboration will shortly submit spec ATCA3.8 & MTCA.4 for PICMG approval An addendum will be submitted for ATCA3.6 to cover timing distribution recommendations DESY has been instrumental in leading development and industry initiatives for key modules due to urgency of XFEL schedule The PICMG community and industry members have contributed vital resources toward prototypes to make the standard possible SLAC-ILC has funded the international standards committees and introducing xTCA into the lab is underway SLAC is hoping to gain aproval for a major linac upgrade program based on µTCA lab-industry accomplishments The continuation of the lab-industry standards collaboration gives a strong basis for this proposal xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

38 22-Sep Acknowledgments The authors gratefully acknowledge: –The generous support of the entire PICMG management & organization in hosting the physics work –The rich contributions from industry partners particularly key members of Schroff, ELMA, Positronix and Performance Technologies and others too numerous to mention –The enthusiastic key support of members of all the PICMG member labs, again too numerous to mention –The TWEPP 2010 Program Committee for promoting broad discussion of new standards for Physics and the importance of interlab-industry collaboration xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY

39 Thanks for your attention! xTCA for Physics New Developments R. Larsen, SLAC & Kay Rehlich, DESY