C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Installation Procedures/Orbiter Level Test Procedures Robert Goeke.

Slides:



Advertisements
Similar presentations
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Qalification/Functional Testing Bob Goeke January 3-4, 2008.
Advertisements

IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) R. Foster January 3-4, 2008.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
GLAST Large Area Telescope:
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) MISSION ASSURANCE ACTIVITIES Brian Klatt September 10-11,
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Data Products & Production Pipeline Larry Kepko Boston University Center for Space Physics.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
C osmic R Ay T elescope for the E ffects of R adiation 6/27/06 Telescope Mechanical Design1 Albert Lin The Aerospace Corporation (310)
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
THEMIS FDMO CDR Peer Review − FOT Activities 1June 1-2, 2004 FOT Activities Mark Lewis.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
C osmic R Ay T elescope for the E ffects of R adiation Mechanical Design CRaTER and the Electronics Assembly Matthew Smith Mechanical Engineer (617)
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2008.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Project and Independent Review Activity R. Foster September.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
C osmic R Ay T elescope for the E ffects of R adiation June 27, 2005Larry Kepko - Data ProcessingPage 1 CRaTER Characterization Data Products & Production.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly September 10-11, 2008.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Thermal Analysis Huade Tan 6/27/05.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (PSR) Instrument Calibration Science Requirements Compliance Justin C Kasper.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2007.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
GLAST Large Area Telescope:
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope:
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2007.
BRIAN KLATT MISSION ASSURANCE MANAGER
CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly
Integration and Test Organization Chart
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
Instrument PDR Summary of Objectives
Integration and Test Organization Chart
Introduction and Overview
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2008.
Presentation transcript:

C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Installation Procedures/Orbiter Level Test Procedures Robert Goeke January 3-4, 2008

C osmic R Ay T elescope for the E ffects of R adiation Post-delivery processing flow at GSFC GSFC ready to receive CRaTER in GSFC Building 7 on 1/6 –Store in room 188 that evening, move to adjacent “Big Top” clean tent next day CRaTER unpacks flight unit and EGSE at Big Top week of 1/14 –Flight Instrument inside Big Top at north end –CRaTER EGSE outside Big Top CRaTER team performs Long Form Functional with Co60 source –Source provided by GSFC Code 690, safety provisions in place GSFC Mechanical Systems performs incoming inspection –Mass, dimensional check against Mechanical Interface Drawing GSFC 540 Performs (unpowered) bakeout certification with TQCM in B-7 chamber –Particulate contamination verification (lift/rinse) in conjunction with bakeout cert CRaTER ready for Orbiter integration –Currently scheduled for 2/06/2008

C osmic R Ay T elescope for the E ffects of R adiation GSFC Facilities and Procedures ready Processing facility ready: –B-7 Big Top Tent, FTD-STD-209 level 10,000 –ESD workstation in place w/wriststraps –Adequate power for EGSE –Purge capability meets CRaTER requirements –Project mechanical and contamination control technicians ready to support Test Procedure status: –CRaTER will rerun their standard Long-Form Functional test used at MIT with their GSE Integration Procedure status: –LRO/CRaTER Electrical Integration Procedure (451-PROC ) Written and used at FlatSat to integrate CRaTER Instrument Simulator Update for Flight Instrument integration in progress –LRO/CRaTER Mechanical Integration performed on Work Order Authorization (WOA) GSFC WOA status - all in process –Unpack / Post-Ship Functional Proc - in process with LRO Payload –Bakeout certification WOA - in process with LRO Contamination Control –Mechanical Integration WOA - in process with LRO Mechanical Systems

C osmic R Ay T elescope for the E ffects of R adiation LRO I&T/systems deem CRaTER ready to integrate from ground I&T standpoint CRaTER ITOS/STOL scripts used at Orbiter level ready for use: –Long Form Functional, Short-Form Functional, Aliveness “Condensed Functional” under discussion by LRO Mission Systems –Original CRaTER test procedures converted to ITOS scripts by CRaTER Mission Ops lead Rich Sanidad –LRO ITOS/STOL scripts run at LRO FlatSat using CRaTER Instrument Simulator LRO C&DH database updated Use of GSFC-supplied radioactive Co60 source at Orbiter level has been baselined –Source strength: 3E-6 Curies per John Keller –At GSFC, will use source only during CRaTER Post-Ship Functional and Orbiter Comprehensive Performance Test –Source not planned at Cape

C osmic R Ay T elescope for the E ffects of R adiation