A Tracking Trigger for CLAS12 Mac Mestayer What is a tracking trigger? - “level-1” type, fully pipelined How does it work? - uses FPGA logic - “nearest-neighbor”

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
SVT L.Ristori1 SVT Workshop July 22, 2003 Summary (1) Minimal upgrade for run IIb silicon –Detailed bit level format for hits from HF’s to Mergers needs.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Pions for SoLID May 7 th 2013 SoLID EC meeting A. Camsonne.
PV-DIS Toroid Detector: outline and costs Paul E. Reimer 12 GeV PV-DIS detector meeting August 1.Introduction to Toroid Concept (presenting work.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
Understanding the Origin of the Nucleon Spin Andi Klein, Melynda Brooks, Pat McGaughey and Matt Stettler Research Goals: Use Deeply Virtual Compton Scattering.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Peter-Bernd Otte - 8 th March 2010 CB collaboration meeting, Mainz.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
STaRBoard Jamal Rorie 5/09/06 Physics 476. Why do we need ToF info? Used to determine species of particle –Central Drift Chamber records path –ToF records.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
Luca Spogli Università Roma Tre & INFN Roma Tre
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Trigger System Status Adele Di Cicco cm28.8 cm 9.6 cm T600 pixel definition.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
5/9/03Andrei Sukhanov. Phobos BWMeeting1 Andrei Sukhanov – measurements, analysis Ioury Sedykh – software, calculations Piotr Kulinich – measurements,
CLAS12 Drift Chamber Prototyping
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
CDC Upgrade Beam background Simulation study Idea for upgrade Upgrade plan Summary Shoji Uno (KEK) Mar-20 th, 2008.
Preliminary Design of Trigger System for BES III Zhen’an LIU Inst of High Energy Physics,Beijing Oct
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Recent development of gaseous position-sensitive thermal neutron detectors for the IBR-2 spectrometers A.V.Belushkin, A.A.Bogdzel, A.N.Chernikov, A.V.Churakov,
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
B-KLM DAQ 2011/01/25 Trigger/DAQ workshop K. Sumisawa (KEK) Introduction Summary +7 pages.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
CLAS12 Forward Tracking: Status and Challenges
CLAS12 DAQ & Trigger Status
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
CLAS12 Calibration and Commissioning (CALCOM)
Drift Chambers for CLAS12 -Mac Mestayer
CLAS12 First Experiment Workshop Report
Open Tasks for PrimEx-II Run
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Example of DAQ Trigger issues for the SoLID experiment
Preparation of the CLAS12 First Experiment Status and Time-Line
CLAS12 Timing Calibration
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
DESY drift chambers efficiency and track reconstruction
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
August 19th 2013 Alexandre Camsonne
Presentation transcript:

A Tracking Trigger for CLAS12 Mac Mestayer What is a tracking trigger? - “level-1” type, fully pipelined How does it work? - uses FPGA logic - “nearest-neighbor” summing What’s the advantage? - increases event purity for electron scattering - increases luminosity limit for “quasi-real” electron experiments Mar. 16, 2012A Tracking Trigger for CLAS121 / 7 “It’s the luminosity, stupid !” * * {apologies to Bill Clinton}

The Challenge (and fun) of High Luminosity Problem: how do you run a large-acceptance detector at high luminosity? – ‘harden’ your wire chambers (smaller solid angle, thicker wire, faster gas) – ‘pipeline’ your data ‘flash’ ADC’s, TDC’s – add ‘tracking’ to your trigger eliminates accidental showers firing Cerenkov counters allows high-purity multi-prong triggers relieves pressure on downstream event building … all based on FPGA technology. Mar. 16, 2012A Tracking Trigger for CLAS122

What’s a tracking trigger ? based on capabilities of a new “drift chamber readout board”: amplifier, discriminator, TDC FPGA architecture allows “segment-finding” fully-pipelined readout of data and trigger logic  trigger can associate a charged track with a hit in a scintillator-based detector Mar. 16, 2012A Tracking Trigger for CLAS123

How does it work? Mar. 16, 2012A Tracking Trigger for CLAS124

Mar. 16, 2012A Tracking Trigger for CLAS125 Move triangular template across superlayer; occupancy of 2 or greater is a ‘half-cluster’, aligned ‘half-clusters’  ‘cluster’ Underlying logic?

What are the advantages? Mar. 16, 2012A Tracking Trigger for CLAS126 Experiment typeAdvantages Electron detected in CLAS (“standard”) higher event purity reduced tape costs fewer ‘offline’ events “Quasi-real” scattering, low-angle electron multi-hadron trigger reduced trigger rate higher beam luminosity shorter run periods

Summary FPGA technology enables flexible triggering schemes for charged tracks Higher-purity trigger saves tape costs, New technology reduces maintenance and power costs Addition of tracking to triggering reduces the load on the downstream DAQ  higher luminosity; shorter data-taking times lower costs, higher statistics, more physics Mar. 16, 2012A Tracking Trigger for CLAS127

Project Cost Mar. 16, 2012A Tracking Trigger for CLAS128 DescriptionQuantityPriceLaborNotesExt Price Turnkey Production252$16002 weeksProcurement$405K Delivery ARO8 wks. delivery Acceptance Testing2523 weeks Specify/Purchase 9U x 160mm VXS crate 18$10K1 weeksProcurement$180K Crate acceptance182 weeksPower test Full crate DCB test verification 183 weeksFull function test Installation & commissioning 184 weeksHall installation/test Totals 15 weeks $585K DCRB Cost and Schedule Table 1

Operating Cost Savings Mar. 16, 2012A Tracking Trigger for CLAS129 Units Saved / Year Cost / UnitYearly Savings Data Storage Tapes3000 Tbytes *.75 35$ / Tbyte80 k$ Maintenance Manpower 100 FTE days45$/day4 k$ Power Savings60,000 kW-hrs0.10$/kW-hr6 k$ Offline cpu Cycles10^8 cpu-secs?? Total Cost Savings~ 100 k$