STF status, April 2011 H. Hayano 04062011. March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.

Slides:



Advertisements
Similar presentations
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Advertisements

E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
US Cavities Status and Plan Mark Champion 01 October 2009.
9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Control configulation for S1G module operation H. Hayano version 1.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Field emission issue and strategy to improve H. Hayano.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
1 S1Global Experiment Writeup Outlining WIP A N.Toge +
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
Detail plan of S1-Global H. Hayano (KEK),
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
S1G Experiment Schedule Plan
ILC10 Beijing Global Design Effort
ILC-SCRF Test Facilities considerations
STF Plan of gradient improvement
S0 Status report from KEK
ESS RF Development at Uppsala University
Progress in Asia Hitoshi Hayano,KEK,
Affordable iPad Repair Services in Dubai
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

STF status, April 2011 H. Hayano

March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe damage was found. March 28, 2011: STF building AC power recovery. functional check of STF infrastructure, EP facility (incl. clean-room, UPW, HPR); ok Vertical Test stand; ok klystrons filament; ok S1G cryomodule cavity & coupler vacuum; ok LLRF electronics; ok cryogenics control; ok pre-tuning machines, inspection camera, etc. ; ok computers and network, rad. Safety system ; ok 1 Vacuum pump : damaged Cooling water system : damaged

Damaged (1)Turbo-pump blades were completely damaged. It was working at 2F of VT stand. (2) Water cooling system pipes were damaged. Pipe cut Flex. Pipes bent

Immediate resuming is possible for the following work (1)Surface treatment, inspection and pre-tuning of STF CM-1 cavities. (2) Disassembly and removing of S1-Global cryomodules and DRFS klystrons (3) Construction of STF phase-2 beam line, however, capture cryomodule and couplers will delay about 2 months by factory damage. (1) Klystrons operation (2) RF process of input couplers (3) RF process of RF-gun cavity Resuming after water cooling system repair (it will take a month at least) Following operation need to permission of lab-wide schedule. (They require 100kW~500kW) (1) Klystron operation for healthy check. (2) RF process of input couplers (3) RF process of RF-gun cavity (4) Cavity vertical test ( It require cryogenics operation for liquid He in KEK cryogenics center. ) (5) Anneal furnace operation for cavity treatment (6) STF cryogenics operation for healthy check. Since AC power use is strictly limited to 2MW in daytime, 5MW in night, for whole KEK, because of power shortage by power plant damage of Tokyo-electric.

Resuming-up of surface treatment

Resuming-up of Cavity treatment and measurement KEK Cryogenic center will work by night shift.

Cavity treatment and measurement of ERL cavities, also