Use of Mobile Technology for Landslide and Geo-Hazard Rating Matrix Kamran Majidzadeh, PhD, PE Nikhil Khedekar, PhD, PE Nikhil Khedekar, PhD, PEProjectGrid.com®

Slides:



Advertisements
Similar presentations
Retroreflectivity: Raising the Nighttime Brightness of Traffic Signs and Markings Office of Technology Applications Peter Hatzi.
Advertisements

Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
1 Incorporating Extreme Weather Risks in Asset Management Planning Lynn Clarkowski.
Transportation Asset Management for Ancillary Assets
Louisiana Safe Routes To School Program
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
LAND AREA: 688 SQ. MI. – 3RD LARGEST IN OHIO 421 C/L MILES 393 BRIDGES (275 NBIS) 1,800 CULVERTS 5,000+ SIGNS 10 RAILROAD CROSSINGS (at grade) CURRENT.
Bridges & Culverts Usage Codes and Validation Annual FIMS Comprehensive Training March 27, 2014.
Small City Funding Opportunities Transportation Improvement Board June 2010.
ROADWAY SAFETY IMPROVEMENT (RSI) ROAD SAFETY AUDITS & AUDIT REVIEWS CLIFF REUER TRAFFIC & SAFETY ENGINEER SDDOT OFFICE OF PROJECT DEVELOPMENT
TDOT Rockfall Management System
Managing Non-Traditional Asset Classes Managing Non-Traditional Asset Classes SHA’s Perspective Maryland Department of Transportation State Highway Administration.
1 SDDOT SAFETY PROGRAM. 2 Who Am I ??? CLIFF REUER TRAFFIC & SAFETY ENIGNEER SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION OFFICE OF PROJECT DEVELOPMENT
August 27, 2009 GENERAL DYNAMICS Advanced Information Systems 1 NYSDOT.
Highway Maintenance & Rehabilitation
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Safety Audit Components Safety assessment for risk Management.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
SharePoint Server 2013 Features and Scenarios for IT Professionals First Lastname, Title March, 2014 Software Assurance Planning Services.
WVDOT GTI SECTION Status Update for Miss Utility.
Unstable Slope Management for Oregon Highways: Using Cost-Based Risk Assessment in Conjunction with Site Characteristics to Manage Landslide and Rockfall.
BAAMA Education Session: “Prioritizing Capital Resource Allocation: Using GIS to Calculate Consent” January 22, 2004 George White/Ryan Robley Policy Innovation.
The Audio system will call you if you enter your phone number upon login. If that doesn't work call: Toll access number (Toll): Toll free.
GeoResources Institute Spatial Technologies for Freight Transportation Efficiency, Planning, and Safety Chuck O’Hara, Ph.D. Associate.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
NCHRP Synthesis 458: Roadway Safety Data Interoperability Between Local and State Agencies Presented to ATSIP TRF 2014 Presented by Nancy Lefler Vanasse.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 26 Schedule.
UDOT I-15 The Point Design-Build Project
N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Mark Nelson, Program Manager for Statewide Planning and Data Analysis TRB International Partnership Meeting January 14, 2015.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
Traffic Barrier Guidelines Section 3.0 Potential Roadside Obstacles Hands-On Workshop III July
Traffic Incident Management at the Big Dig Presenter: Kevin A Duffy- CA/T Manager of Emergency Planning & Response
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Data Driven Decision Making By Larry Frevert, PE, PWLF Senior Consultant – TREKK Design Group, LLC, and Director – Public Works Institute, KCAPWA.
Working Together to Save Lives An Introduction to the FHWA Safety Program for FHWA’s Safety Partners.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
New Jersey Turnpike Next Generation Bridge Inspection Software
ODOT. Taking Care of What We Have. Asset Management, Life Cycle Analysis : A Three-Pronged Approach September 9th, 2015 Andrew Williams, Ohio DOT.
AT THE CROSSROADS Building for the Next Generation Council of State Governments May 30, 2008 Lexington, Kentucky.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Asset Management Maintenance Management System
June 23, 2006 Asset Management A Tool to Save Lives, Time, and $$$
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
FACS-STIP Tool – Overview (Features, Attributes & Conditions Survey – Statewide Transportation Improvement Program) April 2010 Presentation for Roadway.
Moving Ahead The American Public Speaks on Roadways and Transportation in Communities Federal Highway Administration Industry Briefing March 20, 2001.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Road Safety Audits Road School, 2011 Rick Drumm, P.E. Safety Engineer Federal Highway Administration.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Steps 6 to 8 Lesson 4 | The Eight-Step RSA Process 4-86.
AIRPORT SELF INSPECTION USING WEB BASED TECHNOLOGY KENNETH CARLEY, A.A.E. BRUCE BIRCH, P.E.
Managing ITS Assets using GIS in Silicon-Valley City of San Jose, CA Kenneth Salvail, P.E. ITE District 6 Annual Meeting July 2007, Portland Oregon.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
ODOT Culvert Inventory & Inspection Program. Ohio defines a bridge as any structure with span or diameter equal to or greater than 10 feet as measured.
Geohazard inventory Training • April 19, 2017
Interdisciplinary teams Existing or new roadway
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Laurie Leffler, Division Administrator
FOR LOCAL AGENCY FEDERAL AID PROJECTS
District 7 Deputy Director, Randy Chevalley, P.E., P.S.
School of Civil Engineering
Better with Augmented Reality
GIS-MO Project CRAB.
Presentation transcript:

Use of Mobile Technology for Landslide and Geo-Hazard Rating Matrix Kamran Majidzadeh, PhD, PE Nikhil Khedekar, PhD, PE Nikhil Khedekar, PhD, PEProjectGrid.com® Bernard Schubach Resource International, Inc.

Landslides cause public risk, from 25 to 50 deaths annually Impact on economy, up to $2 billion in damages annually Limited fund in fixing highway slope failure Demand of an effective resource and asset management Landslides cause public risk, from 25 to 50 deaths annually Impact on economy, up to $2 billion in damages annually Limited fund in fixing highway slope failure Demand of an effective resource and asset management Introduction

Study background Rating/Management SystemYear ODOT Rockfall Hazard Rating System (RHRS)1993 ODOT Landslide Rating System2007 WSDOT Unstable Slope Management System1991 NYSDOT Rock Slope Rating System1988 NYSDOT Rock Slope Rating System1992 UDOT Rockfall Hazard Inventory2002 GIS Landslide Inventory Along Tennessee Highway2000 INDOT Landslide Remediation Using Unconventional Methods1999

Ohio Hazard Rating System Developed based on synthesis of ODOT in-house expertise and the existing systems of the other agencies Based on an exponential scale system to heighten the severity of risk for each risk factor Scores of 3, 9, 27, and 81 are assigned to four rating criteria for each risk factor Developed based on synthesis of ODOT in-house expertise and the existing systems of the other agencies Based on an exponential scale system to heighten the severity of risk for each risk factor Scores of 3, 9, 27, and 81 are assigned to four rating criteria for each risk factor Final hazard is a summation of the scores of six risk factors : > 250 high hazard 150 < < 250 moderate hazard < 150 low hazard > 250 high hazard 150 < < 250 moderate hazard < 150 low hazard

Composite Numerical Hazard Score

Hazard Rating Matrix CategoryPoints 3Points 9Points 27Points 81 Movement location/Impact Impact on roadway Low hazard on shoulder Low hazard on roadway Medium hazard on roadway High hazard on roadway/structure Impact on area beyond right of way Low hazard on area beyond right of way Moderate hazard on area beyond right of way High hazard on area beyond right of way High hazard on area beyond right of way/structure Hazard to traveling public Rate of displacement < 1 in/year 1-3 in/year, No single event > 1 in 3-6 in/year, No single event > 3 in 6 in/year, No single event > 3 in Evidence of displacement Visible crack or dip<1 in of displacement1-3 in of displacement>3 in of displacement Maintenance Frequency None to rareOnce a year1-3 time/ year> 3 time/ year Response No response Periodic maintenance Routine maintenance Immediate maintenance ADT < > Decision sight distance (DSD) > 9089 < < 5049 < < 35< 34 Accident history No accidentVehicle or property damage InjuryFatality

Use of iiCollector TM for Landslide and Geo-Hazard Rating Matrix

ProjectGrid.com Web Based Solutions An Award wining web- based solution for project and program management Winner of Gold Software Enabler Award, Gold Technology Award & IRF Global Road Achievement AwardIRF Global Road Achievement Award ProjectGrid.com® iiCollector TM Collaboration of Rii and Google Maps, API iiCollector Mobile / Wearable Devices Google Maps, API Creates interactive maps and embodies the functionality of Google maps into ProjectGrid.com website and the mobile asset manager

Real Time Communication using Innovative Technology iiCollector Scheduled Inspections Periodic Inspections Owners Document Control Operators Compliance Google Maps help to integrate field and office documentation Specialty Inspections Daily Safety Inspections Continuous Surveillance Corrective Action Clients Office Personnel iiCollector TM Cloud Project Grid Field Operations Reporting Deficiencies for Corrective Action iiCollector TM Intelligent Integration of Office & Field Office Personnel

The iiCollector has Everything you Need for Data Collection Intelligent integration of field and office documents Real-time access to specifications and data as it is collected in the field Interpretive software that analyzes and prioritizes data Ability to integrate GIS data with other asset management systems Real-time communication, sharing and data review among the project team

iiCollector TM for Transportation Available Maintenance Categories Pavements (Deterioration, Drop off and Obstruction) Guardrails, Impact Attenuator and End Assembly Drainage (Ditches and Drainage Pipes) Planted Surface Unpaved Shoulder Median Pavement Surface Cleanliness Vegetation Obstruction Traffic (Signs and Pavement Markings) Landslide (Geohazards) Roadside Features Module 1 Structure (MSD walls, Noise walls, Barrier walls and Fences)* Rest Area (Plazas, Parking Lots)* Assets (Sidewalks, ADA Ramps, Curb and Gutters) Traffic (Overhead Signs and Traffic Control Device) Light Poles Culverts Bridge Structures Infrastructure Structural Assets, Module 2 * Available for single asset or multiple assets ** Customizable

An Intelligent Integration of Office & Field Asset inspection Data condition collection Data analysis and reports Real-time access to relevant operational manuals, standards, specifications – Geo-hazard rating matrix, ASTM, DOTs, City, AASHTO, etc. Reports the status of maintenance and project management Available for a single asset or multiple assets Creates documents and reports Self audit, feedback and compliance reports Landslides, Asset ID

Project Spotlight Ohio Turnpike Landslide Assessment ProjectGrid.com® Resource International, Inc. Rii performed a visual evaluation and rating of more than 40 embankment failure locations along the Ohio Turnpike using the iiCollector. Project Link

Project Demonstration ProjectGrid.com® A Resource International, Inc. Company

iiCollector TM for Wearable Devices ProjectGrid.com® A Resource International, Inc. Company Rii’s Information Technology Team is working to develop the iiCollector TM on wearable devices to collect data more quickly and efficiently

What Others Are Saying “In essence, the technology is playing a strong role in eliminating the lag time between when information is discovered and reported.” – ConstrucTech Magazine July 2013 “This technology promotes a paperless environment, significantly increases efficiency, and saves time and money with fewer communication bottlenecks, thus ensuring projects are completed on time and within budget.” – Construction Executive Tech Trends Magazine, April 2014 “This sounds like a great app, and something that [we] have looked favorably upon.” – Kathleen Bergeron, APR USDOT, Federal Highway Administration ProjectGrid.com® Resource International, Inc. iiCollector Video

Thank You Mark Majidzadeh Executive Vice President, CM Resource International, Inc. President, ProjectGrid.com® Resource International, Inc. Todd Majidzadeh Executive Vice President, Technology Resource International, Inc. ProjectGrid.com® Bernard Schubach Sr. Software Engineer Resource International, Inc. ProjectGrid.com® Nikhil Khedekar, PhD, PE Vice President, Engineering & Planning Resource International, Inc.