 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

Facilitated by Joanne Fraser RiverSystems
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Project Time Management
Eric Prebys LARP Program Director 1/8/09.  This meeting will be both and update and an official response to the review of LARP which took place at LBNL.
LARP Accelerator Systems : “home work” Vladimir Shiltsev bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
Eric Prebys LARP Program Director 1/8/09.  Background  Summary of review findings  Partial response  Coordination with CERN  New initiatives  Lumi.
Eric Prebys LARP Program Director Jaunary 14, 2009.
Eric Prebys Fermilab APC Program Director, LARP April 15, 2010.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 16, 2010.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
 Good  LARP has grown significantly in size since it started  Gained credibility both here and at CERN US Labs like it as a way to support work CERN.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
 “Small meeting” – invitation only  All plenary  I want the people who come to get a good feeling for some of the details of global LARP activity 
Eric Prebys LARP Program Director 4/8/09.  All meetings will take place in Chardonnay room (partitioned for parallel sessions).  Wireless available.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
Eric Prebys, Program Director US LHC Accelerator Research Program (LARP) 10/24/2008 Ultimate tribute Sept 10, 2008.
Eric Prebys LARP Program Director 7/13/09.  Background  Summary of findings from last review  Partial response  Coordination with CERN  New initiatives.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
HL-LHC: scope, structure and management HL-LHC internal kick-off day 15 April 2011.
View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.
Eric Prebys 10/28/2008.  Generally, I thought this was a productive meeting  Lots of useful discussion  Would still rather have all plenary More specifically.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) March 15, 2011.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Eric Prebys LARP Program Director January 14, 2009.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
LARP Accelerator Systems Status & Plans 19 June 2008 DOE Review, LBNL Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Eric Prebys LARP Program Director July 14, LARP FY10 and Beyond - E. Prebys 2 Guidance: LARP funding decreases $1M/yr Assume: $13 M LARP total for.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 4, 2011.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
 Presented ongoing activities in LARP  Magnet Systems  Accelerator Systems  Program Management  Also presented plan for “spinning off” construction.
PAC Meeting, December 12, Prebys 1 The Problem.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 1 Cost and Schedule Overview Marc Kaducak LARP Review June 10, 2013.
Eric Prebys LARP Program Director 7/13/09.  Background  Progress and Highlights in 2010  Summary of findings from last review  Chamonix  New schedule.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
US LHC Accelerator Research Program (LARP)
LARP Role in Plans for HL-LHC Upgrades Giorgio Apollinari - US LARP Director USLUO, UW Madison – November 6th- 8th, 2013.
What Should We Do?.
LHC Status, Upgrade Path, and US Contributions
LHC Status, Upgrade Path, and US Contributions
Presentation transcript:

 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General breakdown (informed by Steve’s exit advice)  Accelerator Systems: $2.9M  Magnet Systems: $5.0M  Program Management: $2.1M Includes LTV and Toohig Fellows (of which we have 4)  Contingency: $2M  In then end, had to give up some continency to increase Program Management 10/24/ E. Prebys - LARP Meeting

 Luminosity monitor was expected to be complete by end of FY08  Instead had significant overruns, and needs significant funds on FY09 (original request $1M -> $800k)  Still consider it absolutely vital for lumi to work!  Rotating collimators still a big budget item  Still consider it important to complete a prototype this year in time to at least be considered a solution by CERN.  Strong feeling that LARP should take a leading role in crab cavity development  Led by Rama Calaga  Support by CERN  General feeling that “the train is leaving the station”.  Magnet program still has to funded at a level that will insure a working magnet for the LHC Phase II upgrade 10/24/ E. Prebys - LARP Meeting

 Accelerator Systems  Iterative process, primarily involving Wolfram, Tom, Alex, and myself, to converge on the bottom line. Key component: relying on labs to contribute labor in accordance with their core competencies (i.e. not charged directly to LARP)*  Key casualty: No real money for PS2, for which there was a great deal of excitement within LARP and at CERN Will continue with contributed labor while we decide what to do for next year.  Magnet Systems  Much more monolithic than AS  L1 and L2 managers worked to stay within the budget *Will create “off-project” charge codes. Be sure to charge scientific time to them! 10/24/ E. Prebys - LARP Meeting

 Not much leeway  Management costs determined by historical usage  Need to honor commitments to LTV’s and Toohig fellows  Only discretionary is Programmatic travel, which I have reduced by trying to include travel with the appropriate project. 10/24/ E. Prebys - LARP Meeting

 Original request: $700k  Cavity design  Cryomodule design  LLRF  Budget: $300k  Rely on “off books” help in cavity design from LBNL and Jlab  Defer cryomodule and LLRF work 10/24/ E. Prebys - LARP Meeting

10/24/ E. Prebys - LARP Meeting

LARP FY09 budget version v0.1 September 12, 2008 Total Labor+MTSC WBS [$k]BNLFNALLBNLSLACUnassigned US LHC Accelerator Research Program11,9602,2422,9793,6291,4671,643 1Accelerator SystemsMarkiewicz2, ,0051, InstrumentationRatti Phase I Chromaticity feedbackCameron LuminometerRatti Schottky monitorJansson AC dipoleKopp LLRFFox40 1.3CollimationMarkiewicz1, Phase II Rotatable CollimatorsMarkiewicz Crystal collimationPeggs T890Mokhov CRYSTALPeggs Accelerator PhysicsFischer Studies Electron cloudPivi SimulationsFurman Ecloud FB at SPSFox Grooved ChambersMarkiewicz Beam beamValishev SimulationSen110 Wire compensationFischer50 Electron lensShiltsev Crab cavitiesCalaga PS2 StudiesWienands discretionary Magnet SystemsWanderer5,0591,0711,7692, Model QuadrupolesSabbi2, HQ1, TQ Long QuadrupolesAmbrosio2, , Subscale models0 2.4MaterialsGhosh Programmatic ActivitiesPrebys2, AdministrationPrebys2, Systems ManagementPrebys1, Programmatic TravelPrebys Toohig FellowshipPrebys CommissioningTBD Assigned Total10,3172,2422,9793,6291,467 4ContingencyE. Prebys1,643 1, /24/ E. Prebys - LARP Meeting

 Original plan  $2.5M  Finished in FY07  Currently  Spent $3.6M  Need to spend ~$800k more  Finished in FY09??  Bottom line  These sorts of overruns are not unusual in real projects!  LARP contingencies are far from sufficient to cover overruns in significant deliverables.  Proposal: develop a standing relationship with APL  Will be discussed in detail at CM11. 10/24/ E. Prebys - LARP Meeting

 We’re already doing way too much  No new initiatives will be considered this year  The budget process must start sooner  Beginning to chart next year’s budget will be a key goal of the CM11 meeting.  Working to standardize budget estimates  Working with Ken Domann to put budget into a single MS Project, so different types of labor at different labs can be properly estimated. 10/24/ E. Prebys - LARP Meeting

 “Small” meeting  Goals  Make decisions  Set priorities  Begin to form FY10 budget  Major topics  lumi monitor status  rotating collimator status and plans  the future of crab cavities and larp's role in that future  LARP's role in PS2  ongoing relationship of LARP and APL  The future of JIRS  Crystal collimation efforts  “Invitation only” 10/24/ E. Prebys - LARP Meeting