Management Strategies for Columbia River Recreational and Commercial Fisheries-- 2013 and Beyond Oregon and Washington Staff Options for Initial Analysis.

Slides:



Advertisements
Similar presentations
COMPARATIVE SURVIVAL STUDY (CSS) of PIT-tagged Spring/Summer Chinook and PIT-tagged Summer Steelhead CBFWA Implementation Review Mainstem/Systemwide.
Advertisements

Evaluate recreational and commercial mark-selective fisheries. (35018) Geraldine Vander Haegen, WDFW Charmane Ashbrook, WDFW Chris Peery, U. Idaho Annette.
Develop Local Okanogan Steelhead Brood Stock Proposal # Sponsored By: Colville Confederated Tribes Presented By: Stephen Smith.
Workshop: Monitoring and Evaluation of Harvest on Columbia River Salmonids July 31- August 1, 2007.
Annual Stock Assessment – Coded Wire Tag Program (ODFW & WDFW) BPA Project Numbers: and
Fish and Wildlife Losses and Hydroelectric System Responsibility January 2004.
Phase I Okanogan River Spring Chinook Production Proposal #29050 Sponsored By: Colville Confederated Tribes Presented By: Stephen Smith.
SELECT AREA FISHERY EVALUATION BPA Project # CEDC, ODFW, WDFW.
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
UMATILLA RIVER FISH PASSAGE OPERATIONS
Fishery Management Overview - Context Sponsored By: Colville Confederated Tribes Presented By: Stephen Smith.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
Strategic Hatchery Management Roadmap to Success Don Campton U.S. Fish and Wildlife Service Portland, OR.
Okanagan Sockeye Reintroduction program 18 October, 2012 Portland, Oregon Howie Wright.
Summary of Recommendations: Peer Review of FY 13 Science Workplan Trinity River Restoration Program Preliminary Fiscal Year 2013 Science Workplan.
11 Implement Wy-Kan-Ush-Mi Wa-Kish-Wit Project #: Aja DeCoteau, CRITFC Watershed Department Manager.
Genetic Stock Identification/Parental Based Tagging for Pacific Salmon Molecular Genetics Laboratory (MGL) Pacific Biological Station.
Upper Willamette River Recovery Planning WITHIN OUR REACH New Partnerships for a Healthier Willamette December
Overview of Current Production Programs Across the Columbia River Basin.
Columbia River Inter-Tribal Fish Commission 1 Columbia River Treaty 2014/2024 Review Paul Lumley, Yakama, CRITFC Executive Director Northwest Hydroelectric.
Management Strategies for Columbia River Recreational and Commercial Fisheries and Beyond Oregon and Washington Agency Analysis and Recommendations.
Federal Concerns Regarding Hatchery Steelhead Spawning in the Wild NOAA Fisheries Salmon Recovery Division.
Coordination of Tag and Mark Recovery Programs Dan Rawding WDFW.
Management strategies for balancing hatchery functions with natural fish protections Brad Cavallo.
CWTs and the Chinook Fishery Regulation Assessment Model (FRAM) Pete McHugh Washington Dept. of Fish & Wildlife 10 May 2012.
Recreation and Visitor Services Bureau of Land Management … the “Purple Book” A Unified Strategy to Implement “BLM’s Priorities for Recreation and Visitor.
Development of the Lower Snake River Compensation Plan: A Brief History Scott Marshall LSRCP Program Administrator U.S. Fish & Wildlife Service.
1 Columbia River Salmon Opportunities for Success Presentation to the Pacific Northwest Waterways Association by the Columbia River Inter-Tribal Fish Commission.
Salmon Stock Variability And The Political Economy Of The Pacific Salmon Treaty Contemporary Economic Policy July 1996 Paper Author: Kathleen A. Miller.
Decisions in the Face of Uncertainty Cedar River Sockeye Hatchery Proposed Adaptive Management Plan.
COLUMBIA RIVER SALMON AND STEELHEAD RETURNS FPAC and TMT – March 2013 Presented by: Washington Department of Fish and Wildlife.
Integrated Status & Trend (ISTM) Project: An overview of establishing, evaluating and modifying monitoring priorities for LCR Steelhead Jeff Rodgers (ODFW)
Proposed Approach for Developing Columbia Basin Salmon and Steelhead Goals June 3, 2015.
Buy-Back Programs in the British Columbia Salmon Fishery By R. Quentin Grafton and Harry W. Nelson International Workshop on Fishing Vessel and License.
Coordinated Assessments Project; Priorities and Expectations March 16, 2015 StreamNet Executive Committee.
Pacific Fishery Management Council Jurisdiction –3 miles to 200 miles –4 states (includes Idaho) Members -- appointed –State governments –Federal Agencies.
Alternative Gear Implementation Project Pat Frazier WDFW Region 5 Fish Program Manager Photo by Wild Fish Conservancy.
U.S. Department of the Interior U.S. Geological Survey Evaluation of Alternative Commercial Fishing Gear in the Lower Columbia River, 2013: Behavior and.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
2014 Program Goal Statements for Salmon and Steelhead Overview Nancy Leonard, Laura Robinson and Patty O’Toole (NPCC)
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
WATER POLICY UPDATE Washington Water Law 2008 LSI Conference Spokane, Washington April 10, 2008 Evan Sheffels Water Policy Special Assistant Washington.
John M. Volkman June 13, 2003 Either/Or? Is it Hydropower or Salmon in the Northwest?
Columbia River Basin White Sturgeon Framework Lynn Palensky Northwest Power and Conservation Council Portland, Oregon USA July 2013.
Pacific Coast Steelhead Management Meeting What Are Managers Required to Provide Their Constituents? March 9-11, 2004 Bob Leland.
Mass Marking and Electronic Recovery of CWTs In the Pacific Northwest Ron Olson Northwest Indian Fisheries Commission Olympia Washington.
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
The Columbia River Basin Where we’ve been. Where we’re going. October 18, 2005.
Wildlife Program Amendments CBFWA Members Meeting – Sept
FCRPS Adaptive Management Implementation Plan (AMIP) 1 September 15, 2009.
Lower Snake River Comp Plan M & E Program SPY’s thoughts based on 3 weeks.
Washington’s Lower Snake River Compensation Plan Steelhead Program – A retrospective and program adaptive management overview Mark Schuck and Joe Bumgarner.
Draft HCP Review Primer.  Manages 2.6 million acres of aquatic lands for the benefit of all citizens of the state - a unique, distinct role among governments.
Effectiveness of alternative broodstock, rearing and release practices at Winthrop NFH William Gale and Matt Cooper -USFWS, Mid-Columbia River Fishery.
Program Implementation Lower Colorado River Multi-Species Conservation Program.
Integrated Status and Trends Monitoring Demonstration Project Pacific Northwest Aquatic Monitoring Partnership Bernadette Graham Hudson, Lower Columbia.
October 20 & 21, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Lower Columbia Sub-Basin.
Columbia River Basin Monitoring, Evaluation, Research, and Reporting (MERR) Plan DRAFT Nancy Leonard Fish, Wildlife, Ecosystem Monitoring and Evaluation.
Puget Sound Salmon Hatcheries April 2003 Puget Sound Salmon Hatchery Management Decision Making ESA & NEPA Processes Independent Scientific Review Process.
Implementation of the Lower Columbia River Recovery Plan Northwest Region August 19, 2013.
Should Fish PM&E Compliance = Success?. Skagit Project History  Relicensed 1995  18 Years of PM&E Implementation  30 Year License remains in effect.
1 The Collaborative, Systemwide Monitoring and Evaluation Project (CSMEP) CBFWA – Ken MacDonald ESSA Technologies Ltd. - Marc Porter State Agencies IDFG.
Coordinated Assessments Project Overview & Next steps January 17, 2012 Presented to: Independent Science Review Panel Tom Iverson, CBFWA.
Payette MPG Sockeye Adult Tributary Juvenile Data Tributary Data
MPG Spring-Summer Chinook
Snake River MPG Fall Chinook Adult Tributary Juvenile Data Tributary
Agenda Item D.1.a Supplemental NMFS Presentation 2 November 2018
5/1/2019 3:12 AM SHARED STEWARDSHIP STABILITY, TRANSPARENCY AND PREDICTABILITY IN ALLOCATION November 26, 2010 Vancouver.
YRDFA Preseason Planning Meeting May 2, 2018 Anchorage
Yakima River Basin Integrated Water Resource Management Plan 2011 Yakima Basin Science & Management Conference Central Washington University Ellensburg,
Presentation transcript:

Management Strategies for Columbia River Recreational and Commercial Fisheries and Beyond Oregon and Washington Staff Options for Initial Analysis and Discussion September 21, 2012

Recreational and commercial fisheries economically vital to OR and WA Priority: Optimizing economic value within conservation framework Fisheries currently constrained by ESA Perennial conflict among users on how best to manage non-tribal fisheries Conflicts divide stakeholders and communities and detract from recovery efforts Background

Incorporates concepts in Governor Kitzhaber’s proposal to the Oregon Fish and Wildlife Commission Includes additional details developed by Oregon and Washington staff Recognizes that Oregon and Washington Commissions will make final determinations Includes a transition period (4-year; ) to avoid significant economic harm to commercial fishery Approach

Leadership on fish recovery Conserve ESA & weak species; meet commitments to Treaty Tribes Enhance overall economic benefits Develop selective gear and techniques; phase out non-selective gill nets in the mainstem Prioritize recreational fisheries in mainstem; commercial in off-channel Enhance off-channel commercial fisheries Guiding Principles

Mainstem gill nets allowed while selective gears and techniques developed Only partially shift additional mainstem priority (e.g., impacts) to recreational fisheries Enhance off-channel areas (e.g., fish, infrastructure); additional returns from initial smolt releases began this year (2012) for spring Chinook Develop, evaluate and implement additional selective fishing methods Secure support and resources for implementation Transition Period ( )

Upriver Spring Chinook, Summer Chinook and Sockeye: Would assign 70% of the allowable incidental take or harvestable surplus to mainstem recreational fisheries Tule and Upriver Bright Fall Chinook: Would assign no more than 70% of the allowable incidental take to mainstem recreational fisheries to meet management objectives Coho: Would assign commercial fisheries a sufficient share of the allowable incidental-take to implement coho and fall Chinook commercial fisheries in off-channel sites and fall Chinook commercial fisheries in the mainstem, as well as directed coho in the mainstem when impacts available Allocations During Transition Period

Chum: Would assign commercial fisheries a sufficient share of the allowable incidental-take of ESA-listed chum to implement coho and fall Chinook commercial fisheries in off-channel sites and salmon commercial fisheries in the mainstem White Sturgeon: Would hold 10% of harvestable surplus in reserve as a conservation buffer. Would assign 80% of the balance to mainstem recreational fisheries and 20% to commercial fisheries Allocations During Transition Period

General: Would use selective gear if available and practical Would provide additional mainstem commercial fishing opportunity if:  mainstem recreational fisheries unable to fully use impacts/shares  objectives for mainstem recreational fisheries met Mainstem Commercial Fishing During Transition Period

Specifically: Sockeye : If NOAA increases allowable impact, would provide increased harvest opportunity Tule Fall Chinook : If alternative selective gear is implemented, would provide impacts to commercially harvest hatchery tules to help reduce strays Upriver Bright Fall Chinook : Would focus harvest upstream of the Lewis River. Downstream from the Lewis River would provide additional harvest opportunity as alternative selective gear is developed Mainstem Commercial Fishing During Transition Period

Enhanced Production at Off-Channel Sites During Transition Period Spring Chinook: Would increase by 1 million fish annually  250,000 by Oregon in 2010  500,000 by Oregon in 2013  200, ,000 by Washington (funding dependent) Coho: Would increase by 1 million fish annually  800,000 by Oregon in 2013  200,000 by Washington in 2013 Select Area Bright Fall Chinook: Oregon would increase by 500,000 annually, beginning 2013 if possible

Opportunities to Expand Off-Channel Sites During the Transition Period Existing Off-Channel Sites: Oregon seek funding to:  Evaluate feasibility of more commercial fishing time  Evaluate feasibility of expanding fishable area New Off-Channel Sites: Oregon and Washington would seek funding to:  Evaluate feasibility of establishing new sites in Oregon and Washington

General: Non-tribal mainstem commercial fisheries would be restricted to the use of selective gear/techniques Additional mainstem commercial fishing when:  mainstem recreational fisheries are unable to fully use their impacts/shares  objectives for mainstem recreational fisheries are met Allocations and Mainstem Fishing in Long Term (Beyond 2016)

Specifically: Spring and Summer Chinook: Would assign a sufficient share (80%) of incidental take or harvestable surplus to recreational fisheries in the mainstem to meet management objectives Sockeye: Would assign a sufficient share (~80%) of incidental take to recreational fisheries in the mainstem to meet management objectives. If NOAA Fisheries increases the allowable incidental take, would provide increased commercial harvest opportunity Allocations and Mainstem Fishing in Long Term (Beyond 2016)

Tule Fall Chinook : Would assign a sufficient share (≤ 80%) of impacts to mainstem recreational fisheries to meet management objectives. Would provide impacts to commercially harvest hatchery tules to help reduce strays Upriver Bright Fall Chinook : Would assign a sufficient share (≤ 80%) of impacts to recreational fisheries in the mainstem to meet management objectives. Focus mainstem commercial fishery upstream of Lewis River. Downstream from Lewis River would provide commercial opportunity in selective tule fall Chinook and coho fisheries Allocations and Mainstem Fishing in the Long Term (Beyond 2016)

Coho and Chum : Would assign commercial fisheries a sufficient share of the allowable incidental-take to implement coho and fall Chinook commercial fisheries in off-channel sites and fall Chinook commercial fisheries in the mainstem, as well as directed coho in the mainstem when impacts available White Sturgeon : Would hold 10% of harvestable surplus in reserve as a conservation buffer. Would assign 80% of the balance to mainstem recreational fisheries and 20% to commercial fisheries Allocations and Mainstem Fishing in Long Term (Beyond 2016)

Enhanced Production at Existing Off-Channel Sites in Long Term (Beyond 2016) Spring Chinook: Could increase by 1.25 M fish annually (includes increased production during transition period)  950,000 – 1 million during transition period  Additional 250,000 by OR (funding dependent) Coho: Could increase by 4.8 M fish annually (includes increased production during transition period)  1 million during the transition period  Additional 3.8 M by OR (funding dependent)

Enhanced Production at Existing Off-Channel Sites in Long Term (Beyond 2016) Select Area Bright Fall Chinook: Could increase by 750,000 fish annually (includes increased production during the transition period)  500,000 during the transition period  Additional 250,000 by OR (funding dependent)

Expansion of Off-Channel Commercial Fisheries in Long Term (Beyond 2016) Existing Off-Channel Sites: If evaluations during transition period indicate feasible:  Would provide more fishing time  Would expand the fishable area New Off-Channel Sites: If evaluations during transition period indicate feasible:  would establish new sites in Oregon and Washington

Adaptive Management Adjustments could be made to the long-term management framework if one or more of the following triggers occur: Significantly lower than expected returns to off-channel sites Insufficient space in off-channel sites to accommodate the commercial fleet Significantly lower than expected mainstem commercial harvest using selective gears Circumstances that delay or preclude use of selective techniques or enhancement of off-channel fish production

Adaptive Management (cont’d): Significantly lower than expected economic return to commercial fishers Conflicts with terms of the US v Oregon Management Agreement Failure to meet conservation needs

Questions?