Welcome to Xeneca’s Final Public Information Centre for the Ivanhoe River: The Chutes Project Today’s PIC will give you the opportunity to learn more about.

Slides:



Advertisements
Similar presentations
Acton Quarry – Proposed Extension Natural Environment Pre-Submission Liaison Committee Information Session January 22, 2009.
Advertisements

Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Notebook Ref 3.5. Tier 3: No Degradation in ONRWs Applies only to waters classified as Outstanding National Resource Waters (ONRW) This classification.
Welcome March 2012 Purpose of meeting with you 1. Determine if the Fire Hall at Grosvenor St. should be declared surplus. 2. To obtain feedback and direction.
Reviewing Course Outlines for C-ID Designation
PRA Roundtable 2013 Renewal of Information Collection /11/131.
Yuba-Sutter Regional Conservation Plan EIS/EIR SCOPING MEETING January 6, 2015.
1 High Production Volume (HPV) Challenge Program Diane Sheridan Chief, Existing Chemicals Branch, Chemical Control Division, Office of Pollution Prevention.
Girl scouts river valleys Welcome to 2015 Early Bird Registration River Valleys will start the webinar at 12:00 p.m. Please mute your phone by pressing.
River Corridor Closure Project Safety People Results U.S. Department of Energy Richland Operations Office 100 Area and 300 Area Component of RCBRA Steve.
Development of a Comprehensive Wildlife Conservation Strategy for Georgia Georgia Department of Natural Resources Wildlife Resources Division.
MARSSIM Revision 2 Request for Input Public Meeting February 10, 2011 Kathryn Snead MARSSIM Workgroup Chair.
Proposed Tire Broker Regulations Informal Online Workshop Wednesday, March 4, 2015.
Biological Basis of the Sonoran Desert Conservation Plan.
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
San Joaquin River NWR Proposed Expansion Planning Process Summer 2011 Fall 2011 Spring 2012 Summer 2012 Public Input Public Input Prepare Draft Environmental.
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
Species at Risk.  Plant and animal that has a low or declining population  May be at risk of extinction  Species that is sensitive to human disturbance.
First Nations-Focused Scientific Reviews of Environmental Assessments MSESMSES Prepared by Sarah Hechtenthal, M.Sc., P. Biol.
1 Selected Topics in Project Management Communication Management Dr Marc Conrad Marc Conrad1.
Yellowstone. Location Yellowstone Nation Park stretches through 3 different states. Yellowstone Nation Park stretches through 3 different states. Wyoming,
U.S. Fish & Wildlife Service Slide 1 Our Mission: “Working with others to conserve, protect, and enhance fish, wildlife, plants, and their habitats for.
Title of presentation umanitoba.ca Final Evaluation & Field Experiences.
Comprehensive Wildlife Conservation Plan (CWCP) and Citizen-based Monitoring Signe Holtz Wisconsin Department of Natural Resources.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Nunavut Water Board (NWB) Community Presentation Type “A” Water Licence Process for Baffinland Iron Mines Corporation’s (BIMC) Mary River Project Community.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
T-shirt orders have been placed Does anyone have any signed paper work to hand in? Activity fees Remind 101 Explore websites.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Community Presentation Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut, Community and Government.
Atlin/Taku Land Use Planning Update Presentation to Multiparty Workshop #3 March 6, 2009.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Terrestrial Biology & Beyond… Chris Maguire Terrestrial Biology Program Coordinator Oregon Department of Transportation Local Government Environmental.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
Program Implementation Lower Colorado River Multi-Species Conservation Program.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Public Meeting May 15, 2007, 6-9 pm Millville Grange Palo Cedro, CA.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
Drinking Water Source Protection Ministry of the Environment Source Protection Programs Branch March 2010.
Overview of Proposed Alaska National Wildlife Refuges Regulatory Changes U.S. Fish and Wildlife Service.
Orange Lake Habitat Management Plan Stakeholder Input Process Public Meeting #2 October 13, 2015.
SWRK 3150 & 4120 Mid-term Evaluation. Welcome Please take some time to review these PowerPoint slides. They contain important information for students,
Ecological Assessment of Symonds Yat Rapids Eric Palmer Cresswell Associates.
Lee Elementary Community Forum Friday, October 23, 2015.
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
1 1 CEQA Scoping Naomi Feger Planning TMDL Section Leader Region 2.
DISTRIBUTIONS OF AMPHIBIANS IN THE ST. CROIX NATIONAL SCENIC RIVERWAY Mark Roth 1, Sam Bourassa 2, Leah Monson 2, Tyler Fanta 2, and Walt Sadinski 1 U.
Strategic Planning Chester County Library System Strategic Planning Steering Committee November 14, 2008 Gail Griffith.
The Rezoning Process CHARLOTTE-MECKLENBURG PLANNING.
Turnaround Planning: Parent and Community Input and Written Feedback REQUIREMENTS OF HB 1842 TEXAS EDUCATION AGENCY.
Community Development Department May 2, 2016 NEW CPAC MEMBERS TRAINING WELCOME.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
Our goal for today To gather broad, values-based input to inform future decisions about fish passage at Mactaquac Generating Station. Your feedback today.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
View display boards and speak one-on-one with staff
Community Development Department April 3, 2017
Kitikmeot Inuit Association
John Martin Reservoir Master Plan Revision
The Calling Frog Survey
Community Development Department April 3, 2017
Community Development Department May 2, 2016
Camarillo Springs Project Draft EIR Scoping Meeting
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Community Development Department May 2, 2016
Community Development Department April 3, 2017
Presentation transcript:

Welcome to Xeneca’s Final Public Information Centre for the Ivanhoe River: The Chutes Project Today’s PIC will give you the opportunity to learn more about what Xeneca is proposing in our Waterpower Class Environmental Assessment (Class EA.) Throughout the process we’ve listened to your feedback and have incorporated it into the EA. We greatly appreciate the input we have received & look forward to hearing any additional comments today. With the public issuance of Notice of Completion, the Class EA document will soon be available for agency & public review. Please note - all written comments and requests for meetings with Xeneca must be received within the first 30 days after the Notice of Completion is issued. There will be an extra 30 days to resolve these issues or, if the issue cannot be resolved through meetings, to submit a Part 2 Order to MOE (with rationale.) Thank you for joining us today.

Thank you for visiting today’s Public Information Centre (PIC) for the Ivanhoe River: The Chutes Project This is the last PIC for The Chutes before submission of the Waterpower Class Environmental Assessment (Class EA.) Much of the information presented today will appear in the EA document. Your comments are important to Xeneca, so please fill out a comment card so that we can ensure all issues are adequately addressed. We invite you to visit for regular updates on all of our proposed projects, including The Chutes. Your participation in this process is important and comments received to date have helped shape the project. We are committed to developing our projects in an environmentally & socially responsible manner. Thank you for coming.

Waterpower Class EA Requirement Xeneca’s Approach (in addition to EA requirements) Response to questions & comments in final documents 30-day public review period for EA document One Public Information Centre (PIC) Make EA available for public review Advance access to information as it becomes available ( blasts, Xeneca website, mailings) 30-day EA review period (written comments must be provided during this period) PLUS additional 30 days to meet and resolve issues (or go to MOE with a Part 2 Order if unresolved) Multiple PICs & Public Information Meetings (PIMs) Meetings with municipalities, NGOs, public interest groups & individuals Post EA on website & send on CD by request Xeneca’s Approach to the Waterpower Class EA Process Submission of EA document to regulatory agencies & public for review. Notice of Completion issued *Notice will be published in local media, ed to stakeholders and on Xeneca website First 30 days Stakeholders to review EA & provide written comment indicating outstanding issues & requests to meet with Xeneca Additional 30 days Xeneca & stakeholders to resolve issues OR stakeholder may elevate to MOE with Part 2 Order (with rationale) Once outstanding issues have been resolved, Xeneca will ask the Crown to publish a Statement of Completion 30 days 60 days Timeline – Next Steps

The Chutes: Proposed Distribution Lines & Roads

The Chutes: Proposed Zone of Influence

Option 2 Layout Conceptual Design: Options Option 1 Option 2

NRSI’s 2010 study area encompassed: 400m downstream of The Chutes An estimated inundation area of approximately 2.8km Lands beyond this inundation within approximately 120m The 2011 study area encompasses a 6.4km upstream inundation area. Biology Study Area

Aquatic Survey Locations

NRSI Fish Collection Results * Walleye spawning was confirmed in the study area Fish Species Historically Known to Occur in Study Area

Terrestrial Biology Results 76 plant species No significant plant species found 45 bird species One significant bird species, bald eagle, was observed Listed as Special Concern (SARO) & Not at Risk (COSEWIC) Srank is S2N, S4B Four herpetofaunal species Eastern Garter Snake American Toad Northern Spring Peeper Northern Leopard Frog Wood Frog Bald Eagle American Toad Northern Spring Peeper

Walleye spawning surveys Lake Sturgeon spawning assessment Summer fish community sampling - main stem river index netting Summer fish community sampling – tributaries (backpack electrofishing & minnow trapping) Methyl mercury (fish tissue) Invertebrate sampling Invertebrate taxonomy Proposed 2011 Biology Surveys 2010 Biology Summary Vegetation community mapping Breeding bird surveys Snake cover boards Incidental observations of all other wildlife, including mammals, reptiles, amphibians, butterflies & dragonflies Visual survey of aquatic habitat Walleye spawning surveys Angling at 16 stations 12 egg mats Spotlight surveys at 4 stations Summer fish community sampling - Methods including use of angling, egg matting, gill netting & electrofishing Trotlines at 2 stations Gill netting at 6 stations (set over 2 days) Electrofishing at 1 station along main stem of Ivanhoe R. Lake Sturgeon Walleye