N 2 Laser 300  QQ 150m HF  HF + 9 PMT Boxes 9 600  QP Calib Box 1  4 Counting Room HF Calibration Optical Fiber Path 9 PMT Boxes / Quad 24 PMT Tubes.

Slides:



Advertisements
Similar presentations
PMT Calibration Results and the MC simulation Shigeru Yoshida, Chiba University
Advertisements

HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
MINER A NuMI MINER A Director’s Review 10 January 2005 H. Budd Univ. of Rochester Optical Cables and Scintillator Extrusions 10 January MINERvA.
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
Tests of scintillators CsI, CsI(Na), BGO, NaI(Tl) CsI(Tl)
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Angular Response of 10inch PMT for IceCube Hiroko Miyamoto Dept. of Physics Chiba University.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
3/18/20021 Update on DHC elements testing. Task force: A. Dyshkant, M.Martin, V. Rykalin V. Rykalin.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics back.
Extraction of optical parameters in SNO+ with an in-situ optical calibration system Dr. Kalpana Singh On behalf of the SNO+ Collaboration CAP Congress.
CMS UPGRADE CAPILLARY TUBE PROFILING. CAPILLARY TUBES EVALUATION Radiation damage Transmission Mixing Scintillating Quartz Tube Water/ Air EJ309 Fiber.
1 HF Laser/LED Calibration Studies L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH 1->9 light splitter w/ pulsed.
HCAL Laser Upgrade Study German Martinez Florida International University Vasken Hagopian Florida State University.
Measurement of the absolute efficiency,
Marc Baarmand Total of 8 Calibration Boxes (CBOX) for HF  CBOX contains Small blue scintillator (UV → blue) 1×9 Splitter (each CBOX serves 9 PMT RO Boxes)
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
9/13/2015Robin Lafever BigBoss1. Fiber and Ferrule 9/13/2015Robin Lafever BigBoss2 Typical fiber and Ferrule: My current model is out of date. Jerry Edelstein.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou.
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
TOF Monitor System Status F. Harris U. of Hawaii June 13, 2006.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
Measurement of 'intrinsic' properties of scintillating fibers H. Sakamoto Osaka University, Japan A.Sato M. Yoshida Y. Kuno Osaka Univ. K. Yoshimura KEK.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
October 2002US CMS HCAL at BU1 US CMS HCAL Meeting Boston University Vasken Hagopian Florida State University.
PHOBOS TOF Construction Status
Motivation There is a consensus that it is not possible to obtain a software (π 0 ) calibration with few days delay (this is to be verified, this is the.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
HF Sleeve Raddam Test Plans Ugur Akgun. Outline We started sleeve raddam in Iowa, ASAP. 11 different types of Tyvek from DuPond, two different thickness.
July 29, 2004 American Linear Collider Physics Group Victoria Linear Collider Workshop Muon Detector MAPMT Tests - Calibration R&D Scintillator Based Muon.
Eusoballoon optics test Baptiste Mot, Gilles Roudil, Camille Catalano, Peter von Ballmoos Test configuration Calibration of the light beam Exploration.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
DOM Two Dimensional Scanning using testDAQ Hiroko Miyamoto T. Noda Faculty of Science Department of Physics Chiba University.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
Powdered TPB vs TPB Embedded in Plastic Matrix Takeyasu Ito Los Alamos National Laboratory EDM Collaboration Meeting Pasadena, Feb
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
KEN, JERI FU JEN CATHOLIC UNIVERSITY 2008/DEC./11 1 Testing Status of P.P. & APD.
HF 2008 : Status and Plans CMS Week, February 2008 Aldo Penzo HCAL Commissioning Status (INFN-Trieste, Italy) (23 February 2008)
PCAL Strips light transmission properties April 25, 2011April 26, 20111April 27,
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
Simbol–X workshopMay 14th, 2007 The Simbol-X Detector Payload P. Laurent CEA/Saclay & APC.
HF UPGRADE PROJECT Y. Onel For HF Upgrade Project Collaboration 1.
TIMING COUNTER: status report Giorgio CECCHET, PSI July 11th, 2003.
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics transmit.
APS April2000 Meeting Ahmet Sedat Ayan Dept. of Physics & Astronomy University of Iowa.
Upgrade of the LHCb ECAL monitoring system Yu. Guz (IHEP Protvino / CERN), on behalf of the LHCb collaboration 07/04/2014.
Modules components procurement EU Lead US Lead EU Scintillators US Scintillators EU Bond Paper US Bond Paper EU Straps US Straps EU BackPlate US BackPlate.
Basic Measurement of the Hamamatsu 10 inch PMT at –40 degree –40 degree Hiroko Miyamoto Dept. of Physics CHIBA University The Uniformity measurement of.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Aerogel detector revisited Sokolov Oleksiy, UNAM, progress report, 20 Sept 2006 E int = M – wall reflectivity є – PMT relative area Belle geometry (traditional):
The photomultiplier tubes selection for KM2A electromagnetic particle detectors (EDs) hou chao IHEP The 2nd workshop of air shower detection at high altitudes.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
The Ludlum Project Advisors: Dr. Randal Ruchti, Dr. Dan Karmgard Mark Vigneault Teacher: Mark Kirzeder Students: Kristen Anderson Mengwen Zhang.
HF “Slice test box” installation
Plans for this week MWPC: wire stretching today
From: Microtube Laser Forming for Precision Component Alignment
HF “Slice test box” fabrication and installation
ROBOX modification plans
Plans from last meeting
HCAL Modules -First Ideas
ACD transparency - gaps between tiles - holes in tile to attach them
Commissioning of the CMS Hadron Forward Calorimeters Phase 1 Upgrade
Presentation transcript:

N 2 Laser 300  QQ 150m HF  HF + 9 PMT Boxes  QP Calib Box 1  4 Counting Room HF Calibration Optical Fiber Path 9 PMT Boxes / Quad 24 PMT Tubes / Box 216 PMTs / Quad 864 PMTs / End 1728 PMTs Total 300 mJ 337 nm Bottom Rack Calib Box Top Rack Calib Box Calib Box Bottom Rack Top Rack  QP 300  QQ

300  QQ 1000  QQ (Silica) 300  QQ N 2 Laser5 x photons 150 m4 x % efficiency (FSU measurement) 1 x 4 splitter2 x % efficiency (FIT measurement) SMA Connectors 1 x 4 splitter 75 mm Fiber to Fiber ratio = (1/0.3) 2  11 Average in/out measurement  22

LED 2 MIXER 50mm  15mm  15mm Polystyrene PIN3 QIE  QP 300  QQ Blue Scintilator 8mm  4mm  8mm Calibration Box  1 x 9 splitter To PMT Box PIN Diode 4mm  9mm  9mm 1 x 4 splitter2 x photons PIN-22 x 10 8 scaled to FSU measurement Fiber (600  QP)3 x 10 6 Pulser PIN1 PIN2 LED 1

Calibration Tube Empty PMT TUBE (CLI) Light Guide Non-reflective coating Light Guide 600  QP Fiber (600  QP)3 x 10 6 photons CLI & LG & Fiber3 x 10 3 assume 0.1% efficiency PMT Max 3000 pe2 x 10 4 PMT BOX SHIELDING 600  QP 40cm Light Guide PMT

SMA Connector Fiber 600  QP Jacket SMA Connectors Holographic Diffuser Plate 2Plate 3 SMA-SMA connector Fiber Ferrule Calibration Light Injector (CLI) Calibration Tube 9cm Aspheric Lens 11mm Focal Length Collimation Assembly