ATC / ABOC Days – Session 4 – 21-23 January 2008. D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp.

Slides:



Advertisements
Similar presentations
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Advertisements

Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Vacuum System of the LHC Injectors and Beam Transfer Lines by J.M. Jimenez Accelerator Technical & Operation Review (ATC/ABOC Days) - Session 4 22 January.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
20 th SPS Upgrade Study Team meeting – 18 th November 2008 – J.Bauche, - AT/MCS/MNC 1.
Vacuum Interventions in Radioactive Environments J.M. Jimenez AT Department / Vacuum Group.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
21 January 2008ATC/ABOC Days, P. Strubin Overview of the main events related to AT equipment in the LHC injector chain for 2007 P. Strubin, on behalf of.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
Davide Tommasini Status and prospects of the PS magnet consolidation program ATOP Days March 4 th – 6 th 2009 Status and prospects of PS magnets programs.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Real Accelerators: a facility overview the nuts and bolts…and gaskets and resistors United States Particle Accelerator School – Accelerator Fundamentals.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
Extraction and beamline progress B.Goddard TE/ABT.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
ATC/ABOC 23 January 2008Session 5 / MTTR & Spare parts 1 MTTR and Spare Parts in TS/ASE Rui NUNES TS-ASE.
ATC/ABOC Days – Session 4 MTTR & spare policy for the LHC injectors & experimental areas: AT and IT Ph. Lebrun – Chair T. Smith – Scientific secretary.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
IEFC Workshop 9 th March 2012 – Magnet activities in IEF during LS1 – J. Bauche 1 Magnet activities during LS1 J.Bauche, on behalf of the TE/MSC/MNC section.
Magnets Attilio Milanese Doing Business with CERN
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
ATOP 4 March Status and Prospects of SPS Magnet Consolidation Program – J. Bauche 1 SPS Beam Lines In the Way to the LHC Status and Prospects of.
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
LSC 19 th April 2013 – SPS Magnet Test Campaign and Consequences for LS1 1 SPS Magnet Test Campaign and Consequences for LS1 J. Bauche*, P. Catherine,
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
SPS availability K. Cornelis Acknowledgments : A. Rey and J. Fleuret.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Report Technical Director Storage-Ring-Installation Completed
Magnet activities in SPS during EYETS
The Survey of the Power Supply Reliability at SSRF
TE-MSC activities in SPS during LS2
Ongoing consolidation of magnets
Experience: past events and accidents
The LHC - Status Is COLD Is almost fully commissioned
Arc magnet designs Attilio Milanese 13 Oct. 2016
Powering the LHC Magnets
Renovation of the 45-year old PS magnets
the CERN Electrical network protection system
TE-MSC activities in SPS during YETS
Disabling Rules.
EURO Conclusions from Cracow meeting
Presentation transcript:

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp. Areas

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 2 SPS & BEAM LINE MAGNET SYSTEMS For the LHC MTTR & Spare Policy for the LHC Injectors & Exp. Areas

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 3 SPS as LHC Injector : Overview of the Complex SPS Bending Peak Field: A (450GeV/c) SPS as LHC injector incorporates:  TT10 Beam Transport Tunnel from PS extraction (TT2) to SPS Injection Point in Sextant 1  SPS Main Ring  TT40/TI8 Injection Tunnel for the LHC Beam 2;  TT60/TI2 Injection Tunnel for the LHC Beam 1;  m of Beam Lines  2200 Magnetic Elements on the LHC way  In addition, 809 Magnets installed in the North Exp. Area & in the CNGS

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC Magnets for the SPS Complex (80 families) Specific to SPS Main Ring & Injection Lines Specific to SPS North Exp. Area & CNGS Mixed Use Beam Transfer & North Exp. Area: Specific Reliability & Spare issues adressed during PS/SPS Days on (1)

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 5 SPS Main Dipole MBB SPS: Separated Function Machine 108 FODO Periods 744 Bending Dipoles TI2 & TI8: similar principle (Half cells of 4 dipoles between focussing/defocussing quadrupoles) Magnet Technology: Laminated Steel Yokes H Shaped Dipoles Welded Structures Water Cooled Copper Coils (excl. Air Cooled Orbit Correctors) Fibreglass/Epoxy Insulation Magnet Technology in Use

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 6 Reliability / Ageing Problems  Failures requiring magnet exchange + overhaul:  Vacuum Chamber (Leaks)  Coil Interturn Short Circuits  Short-Circuit (Coil with Yoke)  Waterleak (Erosion induced)  Ageing problems requiring preventive replacement:  Degradation of the soft shimming, inducing coil movements. (fatigue on vacuum chamber inside dipoles, fatigue on coil conductor inside quadrupoles)

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 7 Spare Policy Threshold determining the need of Refurbishment Workshops. Based on the Return of Experience (REX) Reliability of the equipment Below Threshold: Policy of having enough spares for the expected lifetime of the complex Above Threshold: Policy of having continuous magnet rebuild activities with minimum spare units available.  Large stock of coils + vacuum chambers  Refurbishment of radioactive coils  Machining of radioactive components Existing facility for rebuild at CERN Facility discontinued or interrupted

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 8 REX Reliability of the SPS Dipoles  744 Main Dipoles in operation since 1975  76% are still in operation as installed (567 magnets)  The reliability of the SPS magnets is relatively good (>99 %/year) and relatively stable over the past 33 years.  Need to understand the evolution of failure rates and the effects of preventive replacements (Bathtub Curve for each magnet component) Infant Mortality Useful Life End of Life Wear Out Failure Rate Λ(t) Time t

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 9 REX Reliability of the SPS Dipoles (II)

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 10  Limited Impact: –No cryogeny, no explosive gas, no pressurized vessels, few flammable materials,… –Low Risk of severe injury or of loss of life (heavy handling, high voltage) –Risk of contamination is not significant  Moderate Impact: –exposure of personnel to radiation –production of radioactive waste (damaged components)  Possible major impact: Scientific Program Impact of Magnet System Failures

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 11  Impact of magnet failures on the Scientific program can be mitigated by: –Reducing the failure rate –Extending the lifetime expectancy of the components Mitigation of Failure Impact. MTTR follows the dictates of the cool down time (remanent radiation levels), of the method of access for the heavy equipment, of the distance for the transport & of the restoration of the vacuum in the sector. Minimizing MTTR can conflict with the reduction (mitigation) of the exposure of the personnel to radiation. –preventive exchange of magnets during shutdowns Requires Magnet Rebuild Facilities –By means of specific curative actions once a problem is detected Requires a consolidation fund –Minimizing the MTTR

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 12 M -T-T- R Minimum Time ToRepair MaximumRecovery MeanRespond Replace MTTR: Interpretation & Objectives MTTR (Repair)MTTR (Replace) 4 hours20 hours Magnet Cooling Faults Leaks Water Pressure Faults Overheating Magnet Interlock Faults Specific Electronic Faults Imbalance current detector Null Field Probes Magnet Exchange Note: Specific issues for the MTTR (Mean Time to Respond): although the acknowledgement of the fault is usually very quick, the initiation of the mitigation can be postponed due to various reasons: -AB/OP (Physics priority) -SC/RP (Safety) - « Trivial »matters (nights, week-ends)

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 13 MTTR: Return of Experience  Breakdowns in SPS Complex : –2006: 35 interventions (27 in Target & North Areas), 4 magnets exchanged –2007: 26 interventions (13 in Target & North Areas), 5 magnets exchanged –Objectives: remain below actual statistics (hereunder)

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 14 Conclusions  Spare magnets are available: no specific risk detected on the way to LHC for most of the magnet families  SPS main magnets remain our top priority and require –A close monitoring of the performance –An early detection of a possible accumulation of faults (waterleaks + shorts + vacuum faults) It is vital and it will require immediate action –To have spare coils and/or refurbished coils available  Other largely populated magnet families (MBIs, MQIs for TI2 & TI8) will require –To assess soon the reliability of the new design and determine the need of new refurbishment workshops Erosion induced Waterleaks Coil Shorts

ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 15 Annex: Identified other potential risks  Failure of Associated Ancillary Equipment would have an important impact: –SPS Main Busbar system (4x SPS circumference), powering dipoles and quadrupoles could still suffer a major damage (as in 1983, flashover). Mitigation: raw material is available, estimated MTTR<2weeks –Water-Cooled Cables, linking Power converters in surface with the underground SPS main busbar system, and TI2 and TI8 MBI Dipoles could suffer a breakage of the inner cooling duct leading to waterleaks & electrical insulation failure (as in 1993 for SPS, and in 1998 for LEP) (  No mitigation solution ?) –Magnet Installation Vehicles, using modern electronic and software controlled will require special maintenance in the future. Those are the only vehicles able to install/remove most of the magnets (and the TED dumps) in the Tis, in the CNGS but also in the LHC Main Ring