LTC Linwood Clark OADUSD (MPP&R) 703 695 5315 DSN 225-5315.

Slides:



Advertisements
Similar presentations

Advertisements

Workshop Technical Services and Field Service Review March 12 th, 1pm-4pm PST Objectives –Educate ASP Field Service and Technical Service teams on BtB.
WMS – Warehouse Management Systems
Facts about King County Metro Transit Area served …. 2,134 square miles Population served …. 1,884,200 Coaches …. 1,301 (907 diesel, 235 hybrid, 159 electric.
Service Provider Support of Audit Readiness Office of the Under Secretary of Defense (Comptroller) March 14, 2011.
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Hingham Public Schools Preliminary Budget Information FY 2016 Service and Facilities January 12, 2015.
1 Intensive Item Management Value Chain Kathy Smith UID Task Force Meeting August 26, 2009.
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
Summary of Revisions DoD Manual DoD Supply Chain Materiel Management Procedures 0.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
1 Chapter 1 Introduction To Purchasing IDIS 424 Spring 2004.
Bar|Scan ® Asset Inventory System The leader in asset and inventory management.
Configuration Management
SPAWAR HQ (General Fund) Navy ERP Implementation Lessons Learned – Comptroller View.
Greg Kilchenstein, OADUSD (MR&MP) ADUSD(MR&MP) UID IPT Meeting 2-3 June, 2005 Meeting Introduction EID (12V) Orig. Part No. (1P)1234 Serial No.
IUID – Future Policy As agreed by the Joint Logistics Board in April 2010, IUID marking requirements (for both legacy assets and new procurements) to be.
Presented by 9/8/2011 DPAS Loans Via WAWF Scott Milewski.
SECRET Green Procurement Office of Greening Government Operations May 4, 2006.
U.S. Army Materiel Command | Army Sustainment Command U.S. Army Sustainment Command FORSCOM CDR’s Conference DOL Transition Update 2 OCT 2012 COL Dan Reilly.
Transforming Army Management of Individual Chemical Protective Equipment Mobility Inventory Control and Accountability System Used in Individual Protective.
1 AUTOMATIC IDENTIFICATION TECHNOLOGY Kathleen Ingenhousz NSWC Corona MS-42.
1 Currently 27 DAU Logistics Continuous Learning Modules ModuleTitle CLL002DLA Support To The PM CLL004Life Cycle Logistics for the Rest of Us CLL006Depot.
DEPOT AND ITEM LEVEL BUSINESS CASE ANALYSIS (BCA) & TOOL Bernard Price Certified Professional Logistician.
From Research Prototype to Production
Automatic Identification Technologies (AIT)/Item Unique Identification (IUID) and Real Time Locator System (RTLS)
1 Life after Implementing ERP In Pennsylvania Presented by: Harvey C. Eckert Commonwealth Comptroller Commonwealth of Pennsylvania For: Annual NASACT Conference.
Water Supply Planning Initiative State Water Commission November 22, 2004.
1-7 Contract Financing Don Shannon. What is Contract Financing … “the means of obtaining the funds necessary to perform the contract including – Payment.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
U NIQUE ID ENTIFICATION (UID) Unique Identification (UID) of Tangible Items.
PwC 21 CFR Part 11 – A Risk Management Perspective Patrick D. Roche 07 March 2003, Washington D.C.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
U NIQUE ID ENTIFICATION (UID) Unique Identification (UID) of Tangible Items LeAntha Sumpter
Item Unique Identification (IUID) Presented to SCESC 26 March 2013.
U NIQUE ID ENTIFICATION (UID) Unique Identification (UID) of Tangible Items.
Using OMB Section 508 reporting in addressing your agency's program maturity. How to Measure Your Agency's 508 Program.
C-17 Program Description Three Contracts (All Solicited prior to 1 Jan 04) – Development – Production – Sustainment 180 Aircraft by Aug 08/126 currently.
MILS Migration for Foreign Military Sales UID/MILS Workshop 9-10 March 2004 Kathy Robinson
AIRCRAFT REPAIR and SUPPLY CENTER Elizabeth City, NC.
Sustainment Solutions Envelope (SSE) Sustainment Solutions Envelope (SSE) Presented at the Defense Standardization Program Conference, 16 March 2004.
1 Logistics Continuous Learning (CLL) Module Status Review Presented by Tom Simcik, Acquisition Logistics Performance Learning Director 12 Sept 2008.
IUID in the Supply Chain June 3, Agenda  IUID Workshops  Tracking/Managing Controlled Items by Unique Item Identifier (UII) Requires Additional.
NGEC, moving forward Next Generation Equipment Committee October 24, 2014.
LOG 200 Curriculum Review 15 Apr 2011 Curriculum Review LOG 200 Intermediate Acquisition Logistics Presented to the Life Cycle Logistics (LCL) Functional.
ARMY CAUCUS DSP Conference 23 May Army Caucus Recommendations Problem: The Army Standardization Program’s products and services are not recognized.
U NIQUE ID ENTIFICATION (UID) Air Force UID Overview 17 Nov 04 Col Loraine Simard AFMC/LGY Mr. Thomas Dills HQ AF/ILI
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
Action/Initiative Date Action Initiated: December 2003 Status: On-Going Government and Industry Forum consisting of all military services, weapons system.
Oracle apps scm Online Training & Corporate Training Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC.
Tuesday, May 10, :00 -11:30 am P2P School / Unit Representative Meeting.
Information Exchange under the DLMS SDR Transformation Initiative, DoD WebSDR, & Item Unique Identification (IUID) SDR Committee Meeting, Dec 6, 2006.
Life Cycle Logistics.
Software Configuration Management
Item Unique Identification (IUID) - Update
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
PSM Lessons Learned Background
SAP CS INTRODUCTION SAP Customer service is a highly integrated process module which involves a strong integration of SAP PM,SD,MM,FICO and PS. The scenarios.
ISA 201 Intermediate Information Systems Acquisition
UID Accomplishments Since Dec 2004
Enron Energy Services Energy Management Outsourcing Overview
The E-Rate Program Eligible Services Fall 2011 Applicant Trainings.
Financial Management Modernization Program
Final Design Authorization
Key Highlights of Proposed Policy Update
2019 Additive Manufacturing Workshop DoD AM Policy Development Working Group Co Leads: Greg Kilchenstein Steve Linder.
Topics.
Maintenance Operations
Presentation transcript:

LTC Linwood Clark OADUSD (MPP&R) DSN

Agenda O Items Manufactured at Army Depots for General Issue O Mission Impact of Implementation of UID at Army Depots for Manufactured Items for Supply O Other Issues Raised By Army Depots for Consideration ESSENTIAL IN PEACE, INDISPENSABLE IN WAR

Greater than $5,000 in Acquisition Cost: 10 Items: Installation Kit, EL Tobyhanna AD Control Filter Assembly Tobyhanna AD Synchronizer, Electric Tobyhanna AD Fault Alarm Tobyhanna AD Base, Antenna Support Tobyhanna AD Distribution Box Tobyhanna AD Teat Set, Stabilizer Tobyhanna AD Switch, Power Transfer Tobyhanna AD Erection Box Assembly Tobyhanna AD Sling, Hoist Corpus Christi AD Items Manufactured at Army Depots for General Issue ESSENTIAL IN PEACE, INDISPENSABLE IN WAR

Less than $5,000 in Acquisition Cost (either serially managed, mission essential or controlled inventory): 23 Items: Antenna Tobyhanna AD Cable Assy 10FT Tobyhanna AD Cable Assy, Power Tobyhanna AD (11) Cable Assy, Spec. Tobyhanna AD Cover, Electronics Tobyhanna AD Mount, Viewer Tobyhanna AD Filter, Band Pass Tobyhanna AD Stop, Antenna Tobyhanna AD Power Supply Assembly Tobyhanna AD Abrams Steel Road Wheels Red River AD Bradley Alum Road Wheels Red River AD Trailer King Pins Red River AD HMMWV Armor Door Kits Red River AD Consummable Item, or materiel, if permanent identification required: no items manufactured at Army depots that meet above criteria Items Manufactured at Army Depots for General Issue (con’t) ESSENTIAL IN PEACE, INDISPENSABLE IN WAR

Impact --- Timeline for Army depot implementation of January 2005 is impractical at this time: o Funds have not been budgeted for any of the UID marking equipment-earliest is current POM which begins with FY 06--based on budget estimates at about $1M for UID Marking equipment's) at each Army Depot (5-total $4.975M) and Log Ops ($280K) lead- times required for procurement, receipt, set-up, training, etc., timeline of 2-5 years need to be planned out, o Implementation at best may not be capable at Army Depots for marking of manufactured items until earliest FY 08, o There are many policy and format requirements related to UID implementation that still requires resolution. Policy and guidance is being developed out of the Joint Requirements Implementation Board for Unique Identification (JRIB-UID)----before any direction is mandated for UID implementation at the depot level that the actions and decisions be approved from the JRIB-UID before any UID implementation takes place. Mission Impact of Implementation of UID at Army Depots for Manufactured Items for Supply ESSENTIAL IN PEACE, INDISPENSABLE IN WAR

The Army expect the UID process to extend beyond initial manufacture in the future. Opportunistic marking of items in a repair cycle or systems being recapitalized, reset, or modified to a new configuration may occur in the future. There needs to be a continued dialogue about the process and effect of the evolving UID implementation. The sequence, scope, and timing of the following actions will significantly affect AMC/MSC/Depot activity. o PM identification of the priority for marking system assets. o Funding and execution of changes to the technical data packages have potential to become a workflow issue. Limited RDEC, contractor, and Depot workforce to modify drawings, statement of work estimates, Depot Maintenance Work Requirements (DMWR), and develop new shop travelers will also have to support changes to field manuals and processes. Suggest that synchronization of manual change for two-level maintenance and UID initiatives are combined where possible to reduce funding impact of printing changes. o Determination of the type of permanent marking (by the RDEC community) may fall into some general categories, such as ink spray, chemical or laser etching. Suggest review of equipment categories with Depots, LAISO, and PM for AIT to develop a standardized suite of available hardware and support contracts for depot use. Other Issues Raised By Army Depots for Consideration ESSENTIAL IN PEACE, INDISPENSABLE IN WAR

o Requirements for burr tag capability – a process for retaining UID information linked to an item being exposed to harsh repair processes that might obliterate the original UID – should also be considered. Economic analysis of the number and type of reading and marking hardware to mark existing inventory as it cycles through depot operations will be driven by PM prioritization and availability of technical data packages. Physical placement of the equipment, power, and potential AIS issues will also have to be planned and supported. o Synchronization of UID information throughout new procurement, manufacture, build records (production, overhaul, modification and depot repair), legacy system data, field maintenance as well as supply, transportation and warehouse strategy to identify cost and cycle time will require coordination with a number of Army communities as well as DLA to ensure functional Automated Information System (AIS) processes can exchange meaningful information to support AMC operations. Use of legacy systems to support development of an interim control process and capture of, as well as the role and funding of those systems after transition to the DOD process, needs to be planned with the MSCs. o Planning for certification of software and hardware to support UID implementation (down to the build record level) also needs to include training. Other Issues Raised By Army Depots for Consideration (con’t) ESSENTIAL IN PEACE, INDISPENSABLE IN WAR

o Implications for funding beyond an economic analysis need to be considered. Use of Supply Management Army Capital Improvement Program (SMA CIP) or Depot Management Army Capital Improvement Program (DMA CIP) for hardware procurement of DOD-standard compliant systems is an initial issue. Additional hardware to support unique program requirements may be funded by Program Managers but sustainment of non- standard or legacy hardware until conversion is complete should be planned for. o Cost per item may be expected to increase with additional marking tasks. After marking is completed, process times may be reduced through use of readers and synchronized automation. o Planning for cost change, including sustainment of equipment, should be worked ahead of annual development of Army Master Data File (AMDF) pricing. Programming of operator dollars to procure the items also needs to be included in planning at DA levels. Other Issues Raised By Army Depots for Consideration (con’t) ESSENTIAL IN PEACE, INDISPENSABLE IN WAR