SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.

Slides:



Advertisements
Similar presentations
LIGO-G A-M April 5, 2006 Interferometer Sensing and Control (ISC) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project Richard.
Advertisements

WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
LIGO-G M April 5, 2006 Interferometer Sensing and Control (ISC) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project Richard.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
NCSX NCSX CDR May 21-23, 2002 G. E. Oliaro Slide 1 WBS5 Central Instrumentation/Data Acquisition and Controls G. E. Oliaro for the Computer I&C, Network.
Central I&C Computing Presented at the Physics Operations Course Feb P. Sichta.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
SC Project Review of NCSX WBS5 - Central Controls and Computing August 15-17, 2007 WBS5 Manager: Paul Sichta.
SC Project Review of NCSX, April 8-10, 2008 NCSX Heater Control System P. L. Goranson Work package 1270.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
Princeton University Cost & Schedule Review of NCSX May 1-4, 2007 WBS5 – Central Controls and Computing Paul Sichta.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
NCSX NCSX Project Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
NCSX NCSX CDR May S. Ramakrishnan Slide 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX CDR May
Introduction  Easy English, Inc. Chinese based company specializing in Language translation  Background Translations are currently done manually by.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
SC Project Review of NCSX, April 8-10, 2008 NCSX Fueling and Vacuum Pumping Systems W. Blanchard WBS 21 and 22 Manager.
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PWR System April
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
SC Project Review of NCSX, April 8-10, 2008 Job 1260 Neutral Beam Transition Duct (NBTD) P. L. Goranson.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
NCSX NCSX Project Meeting March 21, 2003 G. E. Oliaro Slide 1 WBS5 Central Instrumentation/Data Acquisition and Controls G. E. Oliaro Computer I&C, Network.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Introduction  Easy English, Inc. Chinese based company specializing in Language translation  Background Translations are currently done manually by bi-lingual.
How the NCSX Project Does Business
PPPL is Committed to the Success of NCSX Rob Goldston, Director Princeton Plasma Physics Laboratory August 15, 2007.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
Princeton University Review of the NCSX Project, March 2008 WBS5 - Central Controls and Computing March 13,2008 WBS5 Manager: Paul Sichta.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Strykowsky 1Office of Science Review August 15, 2007 Office of Science Project Review NCSX August 15-17, 2007 Cost and Schedule Ron Strykowsky.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
Head, Office of Project Management Oversight (OPMO)
Status of I&C System Development for ITER Diagnostic Systems in Japan
Project Management W. J. Foyt
WBS 1.03 Readout Systems Scope, Cost and Schedule
SNS Status Report Karen S. White 10/15/08.
Lesson 4 Systems Engineering Plan Exercise Team #
Experience with an IT Asset Management System
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Conventional Facilities (WBS 1
ESS Main Control Room & ICS Infrastructure
PSS verification and validation
CF Scope, Management & Organization
SNS-PPU upgrades the existing accelerator structure
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 2 Agenda Introduction Requirements and Interfaces Cost and schedule Risks and mitigation Responses to past review recommendations

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 3 Introduction Central Controls and Computing will provide the equipment and services to support: 1) integrated and remote control; 2) data acquisition, analysis, and storage; 3) facility timing and synchronization; 4) central safety and interlocks. Network and Fiber Optic Infrastructure (WBS 51) Central Instrumentation and Control (WBS 52) Data Acquisition and Facility Computing (WBS 53) Facility Timing and Synchronization (WBS 54) Real-Time Plasma and Power Supply Control (WBS 55) Central Safety and Interlock System (WBS 56) Management and Integration (WBS 58)

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 4 NCSX Computing Overview OPIs workstations Diagnostics VLAN NCSX MDSplus Server SAN Tape Archive PPPL Network Diagnostics: Magnetics Visible Camera E-Beam PPPL Core Switch & Internal Firewalls HIGH PERFORMANCE FIBER CHANNEL Offices Control Systems VLAN EPICS Engineering and I&C Systems NCSX Computing Pool 4/1/2008 PS PLC VLAN PLC SubSystem PLCs: WBS1 Thermocouple/Htrs WBS2 Vacuum WBS4 Power Supplies www offsite collaborators PPPL External Firewall Safety System Network PLC Safety PLC Facility Timing & Sync Firewalls

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 5 Requirements An NCSX System Design Description (SDD) was written in 2003, before CD-2. The primary elements of that design remain intact. My current estimate is derived from the SDD, ongoing technical discussions and design reviews, and recent experience with similar systems on NSTX. A WBS5 System Requirements Document (SRD,BSPEC) will be reviewed and approved prior to the Preliminary Design Review for each WBS5 element. Design Complexity & Maturity –Many of the technologies for WBS5/NCSX are currently in use on NSTX, so complexity is low for our experienced staff. –The current workscope has completed neither Preliminary nor Final design, so the maturity is medium.

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 6 CD-4 Interface List WBS51 Network & Fiber Optic WBS1 Thermocouple/Heater Local I&C WBS2 Vacuum/Fueling Systems WBS3 Diagnostics WBS4 Power Systems WBS52 Central I&C WBS1 Thermocouple/Heater Local I&C WBS2 Vacuum/Fueling Systems WBS4 Power Systems WBS53 Data Acquisition and Management WBS1 Thermocouple Local I&C WBS2 Vacuum/Fueling Systems WBS3 Diagnostics WBS4 Power Systems WBS54 Timing & Synchronization WBS3 Diagnostics WBS4 Power Systems WBS55 Real-Time Control WBS2 Vacuum/Fueling Systems WBS4 Power Supply Control WBS56 Central Safety and Interlocks Access Control: WBS4 Power System Areas, WBS7 Test Cell. SubSystem Interlocks: WBS4 Power Systems. NCSX (Global) E-Stop.

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 7 Basis of Estimate Labor: –referenced actual engineering hours from FY97-99 for the NSTX first plasma. –experience with similar activities for NSTX. –‘expert’ estimates (e.g. Erik Perry). M&S –recent purchase of parts for NSTX and other lab infrastructure projects. –catalog prices. –includes spares and service contracts. –selective use of NSTX equipment.

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 8 WBS5 Aggregate Cost WBS5 ETC = $ 2.1 M Softwr/Elec Engineering: 3.6 years Elec/Mech/Draft Tech: 3.1 years ‘Materials & Services’: $ 432 K Reference WAFs for labor and M&S detail for WBS

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 9 WBS51–WBS56 Aggregate Schedule Reference Resource Loaded Schedule pages for schedule detail for WBS51 – WBS58. Title I (PDR) Title II (FDR) Title III (Fab/Install/Commission) Aug ’09Dec ’09 Mar ’11 Sep ’09 Nov ’09 Apr ’10 GPP improvements for Control and Computer Rooms earlier than Dec ’10

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 10 Risks and Mitigation Reference NCSX Risk Register (page 2, item ‘e’) for WBS5 risks. Risk DescriptionMitigation PlanLikelihoodConsequenceRisk Ranking Loss of staff with experience in specialized software will delay availability of Central I&C system. Staff have recently been brought on board in anticipation of growing NCSX I&C needs. The planned shutdown of NSTX after FY10 will increase the availability of similar resources for NCSX. VUMarginalLow

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 11 Response to Past Review Findings 1.Work with ES&H on Safety System Requirements and design basis. PPPL’s ES&H Directives Manual, section 2-5 “Personnel and Safety Interlock Systems” is in the process of being updated. 2.Document Basis of Estimate A WBS5 notebook has been prepared to compile the design basis. Copies of recent requisitions for similar equipment. Catalog cut-sheets with prices. Actual NSTX engineering-hours (labor) tabulation for first plasma.

SC Project Review of NCSX, April 8-10, 2008 P. Sichta - page 12 Conclusion The NCSX central controls and computing are similar in both function and scale to NSTX. The availability of a technically diverse and experienced staff provides confidence that the WBS5 work elements will effectively support the NCSX project’s CD-4 objectives.